HomeMy WebLinkAboutZ-3977 Map 2CAH
�Ew
WAf—k
CK�ST\r.�[S R£'T /"IN1µG \NA". TO KEth Alrv� IiVST L,ly-
RAI5E. 'Top OF wlll.C. To 3&o.01 O a*`,'. f
-GRASS fiL6A W/Yi/ SWAG. E.
BLi.d•
7/II SERVICE
STORE ° °
M ,x
F. F.
N
.�TMCK To
\A?
/ I
359
I
Ar.c Rw�+�S 12ea.vc �z)
S
I`1caw ro-3- " ffV_
rllEw C�l -Tweo-
sa•a -—w--�,�
":J
G1eo�+r-+J G•+s u�e�
/� CSCORrdE ^
w/G
�l� 13KZo�- c
,=.A, p PP
.>.A1t Lala cK �—
s .s
-- - - --- .00
-R .O,
R . t.
S
�Atitp Pte/
1.
>:00
/110 rc
Go
D
1•i
Ste-"
Cft Alf, Z.S ��6K>
SIGw� UraOERNETFI
I
1. AT ALL NEW PAVING, UNLESS SHOWN OTHERWISE ON SITE PLAN, SHALL BE S"
THICK CONCRETE SLAB (3000 P. s. i.) WITH 6" x 6" x 10 x 10 W.W.F.
INSTALL EXPANSION JOINTS 25'-0" EACH WAY. INSTALL EXPANSION
JOINT BETWEEN ALL NEW AND EXISTING PAVING. ALL EXPANSION JOINTS TO
BE 3/4" PTP.
2. AT ALL NEW DRIVES, UNLESS SHOWN OTHERWISE ON SITE PLAN: MINIMUM
CURB RADUIS TO BE 10'-011. CUT EXISTING "ROLL-OVER" CURB, IF SHOWN,
AND WARP CURB TO DRIVE. CUT EXISTING "STEP-UP" CURB, AND WRAP AROUND
CURB TO JOIN NEW 6" CURB ON EDGE OF PAVING IF APPLICABLE. INSTALL
EXPANSION .JOINT WHERE DRIVE MEETS PAVING. RAMP DRIVE TO STREET.
3. CONTRACTOR TO VERIFY THE EXACT LOCATION OF UTILITIES (SUCH AS: WATER
MAIN, SANITARY SEWER, ELECTRICAL SERVICE, ETC.) PRIOR TO ANY
EXCAVATION OR CONNECTION PREPARATION.
4. PAVING AND SOIL.'SHALL SLOPE AWAY FROM BUILDING. MINIMUM SLOPE !"/ft.,
IF GRADING PLAN NOT PROVIDED.
5. it_ DESIGNATES PROPERTY LINE.
6, EXISTING GRADES DESIGNATED AS: 100x0
?. NEW GRADES DESIGNATED AS: Ioo.o
". GASOLINE INSTALLER SHALL VERIFY ALL SETBACKS, EASEMENTS, AND LOCAL
ORDINANCES, AND OBTAIN LEGAL CLEARANCES BEFORE BEGINNING WORK.
GENERAL CONTRACTOR TO BLOCK OUT PAVING FOR LOCATION OF (2) 4'xi'
GASOLINE PUMP ISLANDS. CONTRACTOR IS RESPONSIBLE FOR COORDINATION
OF THIS EFFGRT. CONTRACTOR TO PROVIDE EXPANSION JOINT AROUND ISLAND
LOCATION.
10. LOCATION OF NEW GASOLINE STORAGE TANKS. NEW GASOLINE TANKS SHALLBE
INSTALLED BY GASOLINE INSTALLATION CONTRACTOR BEFORE PAVING IS IN -
PALLED. CONTRACTOR SHALL GRADE SOIL LEVEL OVER TANK AREA AND IN-
STALL CONCRETE PAVING OVER WITH EXPANSION JOINT AROUND (401 x 35')
TANK AREA. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF THIS EFFORT.
11, GENERAL CONTRACTOR TO RUN y CONDUIT EINES TO PUMP ISLAND. WIRES AND
ELECTRICAL CONNECTIONS BY CONTRACTOR. SEE ELECTRICAL PLANS AND
EQUIPMENT SCHEDULE. (DESIGNATED )
12. GASOLINE'' PU?4P ISLAND -GAS SUPPLY LINES: TO BE RUN AND CONNECTED BY
GASOLINE. INSTALLATION CONTRACTOR, BEFORE PAVING IS INSTALLED. CON-
PRACTOR IS RESPONSIBLE FOR COORDINATION OF THIS EFFORT. ALSO FINAL
HOOK UP OF ELECTRICAL TO CONSOLE AND PUMP- ISL.AND.-(DFSIGNAT€D )
1 1, 2— VENT LINES FROM GASOLINE STORAGE TANKS -VENT TO REAR OF BUILDING
TO 3'-O' ABOVE ROOF, UNLESS SHOWN OTHERWISE ON SITE PLAN. VENT LINES
PO BE RUN BEFORE PAVING THAT AREA. CONTRACTOR IS RESPONSIBLE FOR
COORDINATION OF THIS EFFORT. (DESIGNATED )
NOTE - ALL VENT LINES TO BE TIED TO BUILDING.
I4. REMOVE ALL BUILDINGS, LIGHT STANDARDS, PLANTERS, CONCRETE, ASPHALT AS
REQUIRED. COORDINATE RELOCATION OF POWER POLE WITH MLG&W.
Ii. GENERAL CONTRACTOR IS TO INSTALL GAS PRICE SIGN.
Ti). GFNERAL CONTRACTOR IS TO PAINT CURBS, BUMPERS AND STRIPS YELLOW..
1 ':£NERAL CONTRACTOR IS TO REMOVE ALL EXISTING STOKAGE TANKS AS REQUIRED.
I
51
51 1.
YELLOW BACKGROUND
3" WIDE BLACK
BORDER
3"WIDE BLACK
LOGO
HANDICAP SYMBOL
SIze- PLA,tl -7/11 5e.ctvEce- S-roRr_
eM.t Pe. 1-7C.19MAeKH.IM �• PMAe.L-
Dnr� 'Fr -15. 21 a3 L ITTUL QOGK DRAwNL Yw.N
npARaD Roe
�oO-ri-k -A IaD CoRPo2A_rIOp4
+i
;F f
` >'y' • pkapAeao BY:
D�cKIr"►SoAl. MACMILLAN B13 )41&TT ZN<
A
L
V Y
N
�Ew
WAf—k
CK�ST\r.�[S R£'T /"IN1µG \NA". TO KEth Alrv� IiVST L,ly-
RAI5E. 'Top OF wlll.C. To 3&o.01 O a*`,'. f
-GRASS fiL6A W/Yi/ SWAG. E.
BLi.d•
7/II SERVICE
STORE ° °
M ,x
F. F.
N
.�TMCK To
\A?
/ I
359
I
Ar.c Rw�+�S 12ea.vc �z)
S
I`1caw ro-3- " ffV_
rllEw C�l -Tweo-
sa•a -—w--�,�
":J
G1eo�+r-+J G•+s u�e�
/� CSCORrdE ^
w/G
�l� 13KZo�- c
,=.A, p PP
.>.A1t Lala cK �—
s .s
-- - - --- .00
-R .O,
R . t.
S
�Atitp Pte/
1.
>:00
/110 rc
Go
D
1•i
Ste-"
Cft Alf, Z.S ��6K>
SIGw� UraOERNETFI
I
1. AT ALL NEW PAVING, UNLESS SHOWN OTHERWISE ON SITE PLAN, SHALL BE S"
THICK CONCRETE SLAB (3000 P. s. i.) WITH 6" x 6" x 10 x 10 W.W.F.
INSTALL EXPANSION JOINTS 25'-0" EACH WAY. INSTALL EXPANSION
JOINT BETWEEN ALL NEW AND EXISTING PAVING. ALL EXPANSION JOINTS TO
BE 3/4" PTP.
2. AT ALL NEW DRIVES, UNLESS SHOWN OTHERWISE ON SITE PLAN: MINIMUM
CURB RADUIS TO BE 10'-011. CUT EXISTING "ROLL-OVER" CURB, IF SHOWN,
AND WARP CURB TO DRIVE. CUT EXISTING "STEP-UP" CURB, AND WRAP AROUND
CURB TO JOIN NEW 6" CURB ON EDGE OF PAVING IF APPLICABLE. INSTALL
EXPANSION .JOINT WHERE DRIVE MEETS PAVING. RAMP DRIVE TO STREET.
3. CONTRACTOR TO VERIFY THE EXACT LOCATION OF UTILITIES (SUCH AS: WATER
MAIN, SANITARY SEWER, ELECTRICAL SERVICE, ETC.) PRIOR TO ANY
EXCAVATION OR CONNECTION PREPARATION.
4. PAVING AND SOIL.'SHALL SLOPE AWAY FROM BUILDING. MINIMUM SLOPE !"/ft.,
IF GRADING PLAN NOT PROVIDED.
5. it_ DESIGNATES PROPERTY LINE.
6, EXISTING GRADES DESIGNATED AS: 100x0
?. NEW GRADES DESIGNATED AS: Ioo.o
". GASOLINE INSTALLER SHALL VERIFY ALL SETBACKS, EASEMENTS, AND LOCAL
ORDINANCES, AND OBTAIN LEGAL CLEARANCES BEFORE BEGINNING WORK.
GENERAL CONTRACTOR TO BLOCK OUT PAVING FOR LOCATION OF (2) 4'xi'
GASOLINE PUMP ISLANDS. CONTRACTOR IS RESPONSIBLE FOR COORDINATION
OF THIS EFFGRT. CONTRACTOR TO PROVIDE EXPANSION JOINT AROUND ISLAND
LOCATION.
10. LOCATION OF NEW GASOLINE STORAGE TANKS. NEW GASOLINE TANKS SHALLBE
INSTALLED BY GASOLINE INSTALLATION CONTRACTOR BEFORE PAVING IS IN -
PALLED. CONTRACTOR SHALL GRADE SOIL LEVEL OVER TANK AREA AND IN-
STALL CONCRETE PAVING OVER WITH EXPANSION JOINT AROUND (401 x 35')
TANK AREA. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF THIS EFFORT.
11, GENERAL CONTRACTOR TO RUN y CONDUIT EINES TO PUMP ISLAND. WIRES AND
ELECTRICAL CONNECTIONS BY CONTRACTOR. SEE ELECTRICAL PLANS AND
EQUIPMENT SCHEDULE. (DESIGNATED )
12. GASOLINE'' PU?4P ISLAND -GAS SUPPLY LINES: TO BE RUN AND CONNECTED BY
GASOLINE. INSTALLATION CONTRACTOR, BEFORE PAVING IS INSTALLED. CON-
PRACTOR IS RESPONSIBLE FOR COORDINATION OF THIS EFFORT. ALSO FINAL
HOOK UP OF ELECTRICAL TO CONSOLE AND PUMP- ISL.AND.-(DFSIGNAT€D )
1 1, 2— VENT LINES FROM GASOLINE STORAGE TANKS -VENT TO REAR OF BUILDING
TO 3'-O' ABOVE ROOF, UNLESS SHOWN OTHERWISE ON SITE PLAN. VENT LINES
PO BE RUN BEFORE PAVING THAT AREA. CONTRACTOR IS RESPONSIBLE FOR
COORDINATION OF THIS EFFORT. (DESIGNATED )
NOTE - ALL VENT LINES TO BE TIED TO BUILDING.
I4. REMOVE ALL BUILDINGS, LIGHT STANDARDS, PLANTERS, CONCRETE, ASPHALT AS
REQUIRED. COORDINATE RELOCATION OF POWER POLE WITH MLG&W.
Ii. GENERAL CONTRACTOR IS TO INSTALL GAS PRICE SIGN.
Ti). GFNERAL CONTRACTOR IS TO PAINT CURBS, BUMPERS AND STRIPS YELLOW..
1 ':£NERAL CONTRACTOR IS TO REMOVE ALL EXISTING STOKAGE TANKS AS REQUIRED.
I
51
51 1.
YELLOW BACKGROUND
3" WIDE BLACK
BORDER
3"WIDE BLACK
LOGO
HANDICAP SYMBOL
SIze- PLA,tl -7/11 5e.ctvEce- S-roRr_
eM.t Pe. 1-7C.19MAeKH.IM �• PMAe.L-
Dnr� 'Fr -15. 21 a3 L ITTUL QOGK DRAwNL Yw.N
npARaD Roe
�oO-ri-k -A IaD CoRPo2A_rIOp4
+i
;F f
` >'y' • pkapAeao BY:
D�cKIr"►SoAl. MACMILLAN B13 )41&TT ZN<