HomeMy WebLinkAboutApplicationGP App 6/5/20
� A� Grading & Land Alteration
�4IT-1V�. Permit Application
Land Alteration Regulations codified at Little Rock Code of Ordinances § 29-166 el seq. require persons proposing to engage in clearing,
harvesting, filling, culling, quarrying, construction or similar activities to applyfor a permit. To obtain the permit, known as a grading permit,
applicants must fully complete and submit this form to the Public Works Department to initiate grading permit processing.
I. PROJECT IDENTIFICATION
Name of Project: THE HAMILTON
Address: Near 14524 Cantrell Road, Little Rock, AR
Description. LOWE ADDITION Land Alteration Variance behind Buffalo Wild Wi
Zoning: R-2
Building Permit #:
II. APPLICANT INFORMATION
The applicant shall be the "responsible party "for compliance with the Land Alteration Regulations and this grading permit. The applicant may
be either the contractor, developer. property owner or other person who is engaged in the land alienation activity.
Applicant; John A. ReeS phone #: (501) 223-9298
Applicant's Company: Rees Commerical
Applicant's Address:
1 1719 Hinson Road, Suite 130, Little Rock, AR 72212
Applicant's Email Address:
III. PERMIT CRITERIA (Grading permits are required only when the activity meets threshold
conditions and no exemption applies.)
A. EXEMPTIONS (No grading permit required)
Property of 2 acres or less fronting a collector standard street and zoned Rl, R2, R3, R4, or R7A:
Property zoned Agricultural or Forestry (AF):
Property of 5 acres or less fronting on a residential standard street and zoned Rl, R2, R3, R4, or R7A:
Work performed due to an emergency or a repair to protect public health, safety and welfare:
Mining operations regulated by the Arkansas Open Cut Land Reclamation Act (ACA § 15-57-301):
B. THRESHOLD CONDITIONS
Check the below condition(s) that apply:
Site within SFHA (100-year Floodplain):
Cutting/filling > 10 vertical feet:
Cutting/filling > 1000 CY:
Removing > 7 trees w/ > 6" dia. ABH:
APPROVALS
check if
applicable
X Planning Dept. zoning approval:
X Planning Dept. approval (LandscapeBuffers):
X Building Permit issued:
X Grading and Drainage Plan approved:
Erosion Control Plan approved:
YeslNo
IV. SITE SPECIFICS
A permit can be issued only when all necessary city approvals have been obtained and construction is imminent.
(Imminent construction means the installation of a foundation or erection of a structure within 6 months following
land alteration activities or as approved by the Department of Planning and Development in coordination with
appropriate Departments.)
Construction period: Start date asap Est. Finish date 1 yr from permit date
Soil Loss Estimates: w/o erosion controls(t/a/y) 80.11 w/ erosion controls (t/a/y) -_99
Area disturbed (acre) 2.7� Max. depth of cut/fill (ft) I Total project cut/fill (cy)25.000
Est. quantity of fill material to haul in excluding gravel and asphalt (cy):
GTXi IIII11
Source of fill material excluding gravel and asphalt: 15122 Cantrell Road, Little Rock, AR
Est. quantity of cut material to haul out (cy): 0
Destination of fill material hauled from site:
n/a
All off -site cut/fill areas within the corporate limits operated simultaneously
with construction site(s) must be permitted separately.
Location of vehicular access tracking pad(s): SEE GRADING PERMIT PLAN SHEET
Provide haul route of construction vehicles to/from site: (Hauling activities are confined to identified routes.)
15122 Cantrell Road, Little Rock, AR to site.
Required Submittals: - Grading and drainage plan (except residential subdivision)
Erosion control plan
Construction period soil loss estimates
- The City shall have three (3) working days to review the grading permit application for permit issuance or denial.
- All construction work shall include appropriate drainage and erosion control measures to protect neighboring
properties. If a land alteration activity causes damage to off -site property or water, the responsible party shall be
required to mitigate the damage and install such additional erosion controls, as approved by the city official, to
prevent further damage.
- Clearing and grading for streets and drainage improvements may be done on residential subdivisions only
provided the preliminary plat has been approved. No installation of infrastructure including curb, gutter, road
base, asphalt, sidewalks, and drainage system is allowed until grading and drainage plans have been approved by
Public Works.
- Clearing and grading activities are restricted to work hours identified in LR Code Sec. 18-52(b)(12).
- If building construction has not commenced and been diligently pursued within eight (8) months of grading permit
issuance, then all disturbed areas must be restored in accordance with Section 29-196 and landscaping and tree
requirements in the buffers shall be installed, unless the city official determines that the existing buffers on site
meet the landscape planting requirements of chapter 15 and zoning requirements of chapter 36 of the LR Code.
- Any changes that occur during construction that deviate from the approved grading permit application must be
approved by Public Works.
- Damage to private or public property due to hauling operations or operation of construction related equipment
from a nearby construction site shall be repaired by the responsible party prior to issuance of a certificate of
occupancy.
- Grading Permit Fee: $100 for less than'/z acre; $200 for'/z acre to 1 acre; and $100 for each additional acre
greater than 1 acre, make check payable to "Little Rock Planning and Development"
- All grading permits must be signed and picked up by appointment at Public Works, Civil Engineering, prior to
beginning construction at: 723 W. Markham St. LR, AR 72201; Ph #: 501-399-3470 or 918-5348 Fax #: 371-
6863
P & D Staff use:
Grading Permit Issuance: Approved Denied
Signature of City Official: Date:
Comments:
SOIL LOSS EQUATION — Grading Permit Application — Rees Commercial Hamilton Station Development
A=300 (K) (LS) (C) (P)
INITIAL SOIL LOSS EQUATION
K= 0.43 (LeB)
LS=0.621 (4% OVER 300')
C = 1.0
P = 1.0
A=300 (0.43) (0.621) (1.0) (1.0) = 80.11 TONS/ACRE/YEAR
A=300 (K) (LS) (C) (P)
DESIGN SOIL LOSS EQUATION
K = 0.17 (CMF)
LS= 3.91 = 1.37+2.54(10% OVER 100',20% OVER 40')
C = 0.05 (WOOD CHIPS @ 12 TONS/ACRE, <33% SLOPE)
P = 0.5 (50' BUFFER, 3-5%)
A=300 (0.17) (3.91) (0.05) (0.5) = 4.99 TONS/ACRE/YEAR
INITIAL SOIL LOSS EST. 80.11 TONS/ACRE/YEAR
CONSTRUCTION PERIOD SOIL LOSS 4.99 TONS/ACRE/YEAR < 5 (allowable soil loss)