July 5, 2022
Will McFadden, P.E.
Hope Consulting
117 S. Market Street
Benton, AR 72015
RE: 60 Falstone Ct. - Relocation
127-2-220012
Dear Mr. McFadden:
Little Rock Water Reclamation Authority (LRWRA)has reviewed the above referenced plans.
They are approved as submitted with one (1) copy being returned to you for your files with
this letter. Approval is being granted to the applicant to construct and install a sewer main
extension. The applicant shall be responsible for any and all costs associated with the
installation of the sewer main extension in order to obtain wastewater service from the Little
Rock Water Reclamation Authority. Please be advised that this approval is based upon
signed acceptance of and compliance by the Applicant (Owner) with the following
conditions:
1. All significant changes in the plans (i.e., changes in alignment, grade, pipe size, materials,
or in the function of the project) for the proposed construction must be approved prior
to construction, and all construction shall comply with the applicable requirements and
specifications of the latest edition of the Little Rock Water Reclamation Authority
Standard Specifications For Sewer Construction In The City of Little Rock which may be
found at https://www.lrwra.com/customer-center/standards-and-specifications/ .
2. Continuous project responsibility by the engineer is an express condition of this plan
approval. Reference is made to Part 4 of Section 01100 Standard Specifications For Sewer
Construction In The City of Little Rock.
3. The name of the Resident Inspector shall be furnished to LRWRA prior to the start of
construction. No construction may begin until this Approval Letter is acknowledged
by the Applicant (Owner) and returned to LRWRA along with any applicable
charges shown on Page 3 of this Approval Letter.
4. This Approval Letter shall be in force for a period of one (1) year. If construction of the
project has not begun by July 5, 2023, then LRWRAǯ .
No fees paid to Little Rock Water Reclamation Authority for this project shall be
reimbursed should the project approval expire.
5. ͷǯ
underground utilities (Including Storm Drainage) except water lines, which shall be kept
ͳͲǯǤ
6. Connection of the proposed sewer main to the existing sewer main shall not be
made until the proposed sewer main ha s been tested, inspected, and accepted by
LRWRA. The applicant shall convey title to the sewer main extension together with
all necessary easements, free and clear of all liens and encumbrances, by the
appropriate documents. All Final Paperwork must be submitted to LRWRA prior
to the connection of the proposed sewer mains being made.
7. Ductile Iron Pipe shall be used on this project as shown on plans and any time the cover
ȋ͵ͲdzȌ
between two pipes is less than eighteen i ȋͳͺdzȌǤǯ
ǯ .
8. All Existing and Proposed Manholes shall be located outside of the top bank of all existing
or proposed ditches and shall be at such an elevation as not to allow rainwater entry
during periods of normal rainfall. Manholes with a difference in elevation of two feet or
greater shall be a Drop Manhole unless approved by LRWRA. Manhole Steps are not
allowed in Little Rock Water Reclamation Authority Standard Specifications for
Sewer Construction In The City of Little Rock.
9. All sewer mains shall be constructed within easements meeting Utility Specifications or
in a public right oǤȋͳͲǯȌȋ
the depth of cover whichever is greater) and shall be equal distance either side of the
sewer main as constructed.
10. No sewer main may be constructed under or within ten feet of any exist ing
detention basin or any detention basin being constructed for this project.
11. All buildings must be capable of being served by gravity sewer service. If minimum floor
elevations are required, it is the responsibility of the Developer to notify the builder or
Owner to assure gravity service is maintained. Individual pump stations will not be
accepted without LRWRA approval. This includes basement floor elevations.
12. Applicant agrees to obtain all necessary permits and approvals from all other governing
agencies including any applicable Improvement District prior to the start of construction.
APPLICANT SHOULD MAKE AN INDEPENDENT DETERMINATION of the existence,
status or amount of any fees which may be due to third parties (such as Improvement
Districts) which may be owed to the third party in addition to those fees due to LRWRA
for sewer lines and or sewer facilities installation proposed by applicant. LRWRA and
the Little Rock Water Reclamation Authority have no such information of amounts due
third parties, if any, and assume no responsibility for furnishing such information to
Applicant and expressly disclaim any such duty or liability of any nature whatsoever
ǯǤ
13. This approval applies only to that portion of the proposed sewer mains which are to be
dedicated to the public, however all other sewer line work must also comply with Little
Rock Water Reclamation Authority Standard Specifications.
Special Conditions
1. Applicant agrees to pay the following charges prior to start of construction of the
project:
N/A
ǯȋȌ
acceptance of and compliance with the above-referenced conditions. It shall be the
ǯ ȋȌ
items mentioned above. Failure to notify the Applicant of any of the items mentioned
above does not relieve the Applicant from constructing the project in accordance with
Little Rock Water Reclamation Authority Standard Specifications and the terms of this
Approval Letter.
If you have any questions concerning this matter, I may be reached by telephone at the numbers
listed below.
Sincerely,
LITTLE ROCK WATER RECLAMATION AUTHORITY
John E. Holloway, P.E.
Director of Engineering
Office 501-688-1416
Cell 501-352-0380
Email john.holloway@lrwra.com