HomeMy WebLinkAboutZ-3792-B Staff AnalysisFILE NO.: Z -3792-B
NAME: Sysco Foods - Revised PD -I
LOCATION: 5800 Frozen Road
DEVELOPER: SURVEYOR:
Sysco Food Services of McGetrick and McGetrick
Arkansas, Inc. 319 E. Markham St., Ste. 202
5800 Frozen Road Little Rock, AR 72201
Little Rock, AR 72209
AREA: 28.7 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0
ZONING: PD -I ALLOWED USES: Office and Warehouse
and R-2
PROPOSED USE: Office and Warehouse
VARIANCES/WAIVERS REQUESTED: None requested.
BACKGROUND:
The Planning Commission approved the Sysco - Long -Form PD -I on
July 23, 1998 with a vote of 11 ayes and 0 nays. On August 11,
1998, the Board of Directors passed Ordinance No. 17,787
approving the PD -I.
The PD -I was approved to allow the phased expansion of the
existing Sysco Foods warehouse and office development. Phase I,
which is currently under construction, consists of a 80,000
square foot building expansion. Phase II will consist of a
11,750 square foot building expansion and Phase III will include
a 103,600 square foot building expansion and additional parking
near West 65th Street. The building expansions will be primarily
warehouse and dock space with a small amount of additional
office space. The applicant noted that a future revised plan
would include a parking area on the east side of Battle Road.
FILE NO.: Z -3792-B (Cont.)
The Board also passed Ordinance No. 17,788 on August 11, 1998;
deferring boundary street improvements to Battle Road for five
(5) years or until Phase II construction whichever occurs first.
During Phase II construction, a cul-de-sac will be constructed
on Battle Road and a portion of Battle Road will be abandoned.
The applicant noted that no access (except construction access)
to the site will be taken from Battle Road until the street
improvements are in place.
A. PROPOSAWREQUEST:
The applicant is proposing to revise the previously
approved PD -I by adding two (2) areas to the site plan.
The first area to be added is the 1.42 acre vacant church
site which is immediately south of Phase I construction,
along the west side of Battle Road. This area contains
three (3) existing buildings which will be used as office
space with some storage. The small building near the
northwest corner of the church property will be used as an
office for May Construction Company during the phased
construction.
The second area to be added to the site plan is 6.16 acres
of land along the east side of Battle Road. The applicant
proposes to construct a parking area in this area for
passenger vehicles (44 spaces) and large trucks (60 spaces)
with Phase III construction. The applicant is also
proposing to leave a 100 foot undisturbed buffer area along
the east property line of this area. Several single-family
residences which existed along the east side of Battle Road
have been removed. The applicant has also filed a Land Use
Plan Amendment for this portion of the property (see item
2.1. on this agenda).
Otherwise, the portions of the site plan which were
previously approved will not change.
B. EXISTING CONDITIONS:
As noted earlier, construction has begun on Phase I and the
single-family residences have been removed along the east
side of Battle Road.
There is one single-family residence immediately south of
the old church ..site on the west side of Battle Road. There
is a mixture of commercial and industrial uses and a mobile
home park along West 65th Street to the south. Railroad
right-of-way is located immediately north of the site.
The southern portion of the proposed 100 foot buffer area
is heavily wooded. There are some mature trees within the
northern portion of the proposed buffer.
2
FILE NO.: Z -3792-B (Cont.)
C. NEIGHBORHOOD COMMENTS:
The Geyer Springs and Wakefield Neighborhood Associations
were notified of the public hearing. As of this writing,
staff has received two (2) phone calls from persons
requesting information on this project.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Add cul-de-sac on Ballinger or abandon right-of-way.
2. Geyer Springs Road traffic count is 9,800 vehicles per
day.
E. UTILITIES AND FIRE DEPARTMENT/ COUNTY PLANNING:
Wastewater: Sewer mains located on site. Sewer main
relocation required prior to construction.
AP&L: No Comment.
Arkla: No Comment received.
Southwestern Bell: Retain utility easement for telephone
cable when Battle Road is closed.
Water: No Comment.
Fire Department: Contact Dennis Free at 918-3752 regarding
access to property.
County Planning: No Comment received.
CATA: CATA Routes #17 and 17A are very near this site.
Approved as submitted.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division:
This request is in the 65th Street East Planning District.
It is shown as Mixed Commercial Industrial to the west of
Battle and Single Family to the east of Battle. There is
an existing PD -I on the property and the expansion of the
current use is consistent with the MCI. This is the
subject of a Land Use Plan Amendment, LU99-13-01 to be
heard on this same agenda.
Landscape Issues:
Area set aside for buffers and landscaping meet with
ordinance requirements.
3
FILE NO.: Z -3792-B (Cont.)
Any portion of the eastern 100 foot wide undisturbed buffer
zone that does not provide year-round screening must be
supplemented with additional screening. This screen may be
evergreen plantings.
G. ANALYSIS:
The applicant submitted a revised site plan to staff on
May 11, 1999. The revised plan addresses most of the
issues as raised by the Subdivision Committee.
The revised site plan shows 199 parking spaces for
passenger vehicles (100 existing, 99 with Phase III) and
161 parking spaces for large trucks (71 existing, 90 with
Phase III). Typical ordinance parking requirements based
on the amount of office and warehouse space proposed would
be approximately 120 spaces (passenger vehicles). Staff
feels that the parking plan proposed should be adequate to
serve this site.
The revised plan does not show fence locations as requested
by staff. The applicant needs to submit a revised plan
noting fence locations and height.
Otherwise, to staff's knowledge, there are no unresolved
issues associated with this site plan. With additional
evergreen plantings within the 100 foot buffer area along
the property's east boundary, the proposed revised site
plan should have no adverse effect on the property to the
east or the general area.
H. STAFF RECO102NDATIONS:
Staff recommends approval of the revised PD -I subject to
the following conditions:
I. Compliance with the requirements as noted in paragraphs
D, E and F of this report.
2. A portion of Battle Road must be abandoned with a cul-
de-sac constructed with Phase II construction.
3. The portion of Ballinger Road adjacent to this property
must be abandoned.
4. Any site lighting shall be low-level and directed away
from adjacent property.
5. A revised site plan must be submitted showing fence
locations and height.
4
FILE NO.: Z -3792-B (Cont.)
SUBDIVISION COMMITTEE COMMENTS: (MAY 6, 1999)
Pat McGetrick was present, representing the application. Staff
gave a brief description of the revised PD -I, noting several
items which needed to be shown on a revised plan.
Mr. McGetrick noted that a right-of-way abandonment application
would be filed at a later date for the portion of Ballinger Road
which is adjacent to this property.
The 100 foot undisturbed buffer area along the east property
line was briefly discussed. Staff noted that additional
evergreen plantings would be required within areas of the buffer
which do not provide year-round screening.
After the presentation, the Committee forwarded the PD -I to the
full Commission for resolution.
PLANNING COMMISSION ACTION: (MAY 27, 1999)
The staff presented a positive recommendation on this
application, as there were no further issues for resolution.
There were no objectors to this matter.
The Chairman placed the item before the Commission for inclusion
within the Consent Agenda for approval as recommended by staff.
A motion to that effect was made. The motion passed by a vote
of 8 ayes, 0 nays and 3 absent.
5
May 27, 1999
ITEM NO.: 2
NAME: Sysco Foods - Revised PD -I
LOCATION: 5800 Frozen Road
DEVELOPER: SURVEYOR:
FILE NO.: Z -3792-B
Sysco Food Services of McGetrick and McGetrick
Arkansas, Inc. 319 E. Markham St., Ste. 202
5800 Frozen Road Little Rock, AR 72201
Little Rock, AR 72209
AREA: 28.7 acres
ZONING: PD -I
and R-2
NUMBER OF LOTS: 1 FT. NEW STREET: 0
ALLOWED USES: Office and Warehouse
PROPOSED USE: Office and Warehouse
VARIANCES/WAIVERS REQUESTED: None requested.
BACKGROUND:
The Planning Commission approved the Sysco - Long -Form PD -I on
July 23, 1998 with a vote of 11 ayes and 0 nays. On August 11,
1998, the Board of Directors passed Ordinance No. 17,787
approving the PD -I.
The PD -I was approved to allow the phased expansion of the
existing Sysco Foods warehouse and office development. Phase I.
which is currently under construction, consists of a 80,000
square foot building expansion. Phase II will consist of a
11,750 square foot building expansion and Phase III will include
a 103,600 square foot building expansion and additional parking
near West 65th Street. The building expansions will be primarily
warehouse and dock space with a small amount of additional
office space. The applicant noted that a future revised plan
would include a parking area on the east side of Battle Road.
May 27, 1999
SUBDIVISION
ITEM NO.: 2 (Cont.) FILE NO.: Z -3792-B
The Board also passed Ordinance No. 17,788 on August 11, 1998,
deferring boundary street improvements to Battle Road for five
(5) years or until Phase II construction whichever occurs first.
During Phase II construction, a cul-de-sac will be constructed
on Battle Road and a portion of Battle Road will be abandoned.
The applicant noted that no access (except construction access)
to the site will be taken from Battle Road until the street
improvements are in place.
A. PROPOSAL/REQUEST:
The applicant is proposing to revise the previously
approved PD -I by adding two (2) areas to the site plan.
The first area to be added is the 1.42 acre vacant church
site which is immediately south of Phase I construction,
along the west side of Battle Road. This area contains
three (3) existing buildings which will be used as office
space with some storage. The small building near the
northwest corner of the church property will be used as an
office for May Construction Company during the phased
construction.
The second area to be added to the site plan is 6.16 acres
of land along the east side of Battle Road. The applicant
proposes to construct a parking area in this area for
passenger vehicles (44 spaces) and large trucks (60 spaces)
with Phase III construction. The applicant is also
proposing to leave a 100 foot undisturbed buffer area along
the east property line of this area. Several single-family
residences which existed along the east side of Battle Road
have been removed. The applicant has also filed a Land Use
Plan Amendment for this portion of the property (see item
2.1. on this agenda).
Otherwise, the portions of the site plan which were
previously approved will not change.
B. EXISTING CONDITIONS:
As noted earlier, construction has begun on Phase I and the
single-family residences have been removed along the east
side of Battle Road.
There is one single-family residence immediately south of
the old church site on the west side of Battle Road. There
is a mixture of commercial and industrial uses and a mobile
home park along West 65th Street to the south. Railroad
right-of-way is located immediately north of the site.
E
May 27, 1999
SUBDIVISION
ITEM NO.: 2 (Cont.)
FILE NO.: Z -3792-B
The southern portion of the proposed 100 foot buffer area
is heavily wooded. There are some mature trees within the
northern portion of the proposed buffer.
C. NEIGHBORHOOD COMMENTS:
(03
E.
F.
The Geyer Springs and Wakefield Neighborhood Associations
were notified of the public hearing. As of this writing,
staff has received two (2) phone calls from persons
requesting information on this project.
ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Add cul-de-sac on Ballinger or abandon right-of-way.
2. Geyer Springs Road traffic count is 9,800 vehicles per
day.
UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer mains located on site. Sewer main
relocation required prior to construction.
AP&L: No Comment.
Arkla: No Comment received.
Southwestern Bell: Retain utility easement for telephone
cable when Battle Road is closed.
Water: No Comment.
Fire Department: Contact Dennis Free at 918-3752 regarding
access to property.
County Planning: No Comment received.
CATA: CATA Routes #17 and 17A are very near this site.
Approved as submitted.
ISSUES/TECHNICAL/DESIGN:
Planning Division:
This request is in the 65th Street East Planning District.
It is shown as Mixed Commercial Industrial to the west of
Battle and Single Family to the east of Battle. There is
an existing PD -I on the property and the expansion of the
3
May 27, 1999
SUBDIVISION
ITEM NO.: 2 (Cont.)
FILE NO.: Z -3792-B
current use is consistent with the MCI. This is the
subject of a Land Use Plan Amendment, LU99-13-01 to be
heard on this same agenda.
Landscape Issues:
Area set aside for buffers and landscaping meet with
ordinance requirements.
Any portion of the eastern 100 foot wide undisturbed buffer
zone that does not provide year-round screening must be
supplemented with additional screening. This screen may be
evergreen plantings.
G. ANALYSIS:
The applicant submitted a revised site plan to staff on
May 11, 1999. The revised plan addresses most of the
issues as raised by the Subdivision Committee.
The revised site plan shows 199 parking spaces for
passenger vehicles (100 existing, 99 with Phase III) and
161 parking spaces for large trucks (71 existing, 90 with
Phase III). Typical ordinance parking requirements based
on the amount of office and warehouse space proposed would
be approximately 120 spaces (passenger vehicles). Staff
feels that the parking plan proposed should be adequate to
serve this site.
The revised plan does not show fence locations as requested
by staff. The applicant needs to submit a revised plan
noting fence locations and height.
Otherwise, to staff's knowledge, there are no unresolved
issues associated with this site plan. With additional
evergreen plantings within the 100 foot buffer area along
the property's east boundary, the proposed revised site
plan should have no adverse effect on the property to the
east or the general area.
H. STAFF RECOMMENDATIONS:
Staff recommends approval of the revised PD -I subject to
the following conditions:
1. Compliance with the requirements as noted in paragraphs
D, E and F of this report.
4
May 27, 1999
SUBDIVISION
ITEM NO.: 2 (Cont.) FILE NO.: Z -3792-B
2. A portion of Battle Road must be abandoned with a cul-
de-sac constructed with Phase II construction.
3. The portion of Ballinger Road adjacent to this property
must be abandoned.
4. Any site lighting shall be low-level and directed away
from adjacent property.
5_ A revised site plan must be submitted showing fence
locations and height.
SUBDIVISION COMMITTEE COMMENTS: (MAY 6, 1999)
Pat McGetrick was present, representing the application. Staff
gave a brief description of the revised PD -I, noting several
items which needed to be shown on a revised plan.
Mr. McGetrick noted that a right-of-way abandonment application
would be filed at a later date for the portion of Ballinger Road
which is adjacent to this property.
The 100 foot undisturbed buffer area along the east property
line was briefly discussed. Staff noted that additional
evergreen plantings would be required within areas of the buffer
which do not provide year-round screening.
After the presentation, the Committee forwarded the PD -I to the
full Commission for resolution.
PLANNING COMMISSION ACTION:
(MAY 27, 1999)
The staff presented a positive recommendation on this
application, as there were no further issues for resolution.
There were no objectors to this matter.
The Chairman placed the item before the Commission for inclusion
within the Consent Agenda for approval as recommended by staff.
A motion to that effect was made. The motion passed by a vote
of 8 ayes, 0 nays and 3 absent.