Loading...
HomeMy WebLinkAboutZ-3766-A Staff AnalysisApril 3, 1997 ITEM NO.; 12 FILE NO.: 2-375fi-A NAME• LOCATION• OWNER/APPLICANT: PROPOSAL: ORDINANCE DESIGN STANDARDS: 1. Site Location: Asbury United Methodist Church - Conditional Use Permit 1700 Napa Valley Road Asbury United Methodist Church/The Mehlburger Firm by Greg Sullivan A conditional use permit is requested to allow for the construction of a 133 space parking lot addition to the existing church site. The property is zoned R-2. The site is located on the west side of Napa Valley Road, approximately one block south of Hinson Road. 2. CoMpatibility with Neighborhood: The proposed site is located immediately north of the existing Asbury United Methodist Church site, between Asbury and Fellowship Bible Church. Pulaski Academy School is located immediately west, with the Marlow Manor Subdivision to the southwest. Single-family residences are located across Napa Valley Road to the east. The proposed parking lot expansion should not have an adverse effect on the surrounding property. The Marlow Manor, Rainwood Cove and Pleasant Valley Neighborhood Associations have been notified of the public hearing. 3. On -Site Drives and Parkin .- Access Access to Phase I of the proposed parking lot addition will be gained by utilizing the existing drives on the church site. Phase II of the proposed parking lot addition will include a new drive to Napa Valley Road. There are 197 parking spaces on the existing church site. The proposed parking lot addition will include April 3, 1997 SUBDIVISION ITEM NO.: 12 (Cant. FILE NO.: �-3766-A 133 parking spaces (53 - phase I, 80 - phase II) for a total of 330 parking spaces. 4. Screeninct and Buffers: Areas set aside for landscaping and buffer meet with ordinance requirements. The buffer width along Napa Valley Road meets the ordinance requirement of 20 feet when average out though a portion of the proposal drops to a width of 14 feet. 5. Public works Comments: 1. Grading permit will be required on this new development, if it disturbs more than one acre. 2. All driveways shall be concrete aprons per City Ordinance. 3. Stormwater detention ordinance applies to this property. 4.A dedication of right-of-way will be required to 45 feet from centerline for this 5 lane minor arterial. 5. Property frontage needs to have the sidewalks and ramps brought up to the current ADA standards with any planned construction of Phase 2. 6. Consult with Traffic Engineer concerning additional drive to the north with respect to Napa Valley improvement project which is to be designed this year and should be constructed within 2 years. 7. Napa Valley Road has a 1995 average daily traffic count of 9,800. 6. Utilit and Fire De artment Comments; No Comments. 7. Staff Analysis: The applicant, Asbury United Methodist Church, is requesting a conditional use permit to allow for the expansion of their parking lot to the vacant lot immediately north of the church site, between the church site and the Fellowship Bible Church site. Phase I of the parking lot expansion will include 53 parking spaces. Access to phase I parking will be gained by utilizing existing drives from the church site. E April 3, 1997 SUBDIVISION ITEM NO.: 12 Cont. FILE NO.: Z -3766-A Eighty (80) parking spaces will be added with phase II. Phase II will also include an additional access driveway to Napa Valley Road. Any site lighting will be low-level and directed away from adjacent property. With compliance to the conditions noted in the next paragraph, the proposed parking lot expansion should not have an adverse effect on the surrounding property. 8. Staff Recommendation: Staff recommends approval of the conditional use permit with the following conditions: 1. Compliance with the Public Works Comments 2. Compliance with the Screening and Buffers Comments 3. Any site lighting will be low-level and directed away from adjacent property. SUBDIVISION COMMITTEE COMMENT: (MARCH 13, 1997) Greg Sullivan and Frank Riggins were present, representing the application. Staff gave a brief description of the proposal. David Scherer, of Public Works, reviewed Public Works Comments with the Committee. Monte Moore, of Planning Staff, stated that a revised plan needs to be submitted to show the two phases of construction. After a brief discussion, the Committee accepted the presentation and forwarded the issue to the full Commission for final action. PLANNING COMMISSION ACTION: (APRIL 3, 1997) The staff presented a positive recommendation on this application, as there were no further issues for resolution. There were no objectors to this matter. The Chairman placed the item before the Commission for inclusion within the Consent Agenda for approval as recommended by staff. A motion to that effect was made. 3 April 3, 1997 SUBDIVISION ITEM NO.: 12 Cont. FILE NO.: Z -3 766-A The motion was passed by a vote of 10 ayes, 0 nays and 1 absent. 4