HomeMy WebLinkAboutZ-3689-G Staff AnalysisMarch 14, 1996
ITEM NO.: 9 FILE NO.: 7-16-2-G
NAME: HEALTH SOURCE, CORPORATE HILL SUBDIVISION -- ZONING
SITE PLAN REVIEW
LOCATION: On the south side of Corporate Hill Dr. cul-de-sac,
approximately 0.3 mile south of W. Markham St.
DEVELOPER:
ENGINEER:
Daryl Coker Pat McGetrick
HEALTH SOURCE, INC. MCGETRICR ENGINEERING
333 Executive'Ct. 11225 Huron Ln., Suite 200
Little Rock, AR 72211 Little Rock, AR 72211
227-7222 223-9900
AREA: 1.9 ACRES =BER OF LOTS: 1 FT. NEW STREET: 0
ZONIN • 0-2
PLANNING DISTRICT:
CENSUS TRACT: 22.05
VARIANCES REQUESTED:
Rodney Parham (2)
STATEMENT OF PROPOSAL:
None
PROPOSED ❑SES: Parking
Proposed is a 105 -space parking lot, occupying approximately 1
acre of a 1.9 acre lot in the Corporate Hill Subdivision. No
building development is associated with the request; the parking
lot is to provide additional parking for the Health Source
offices located on the abutting lot to the east in the Executive
Park Addition. Access to the new parking area to be provided by
a 27 foot wide drive extending from the current Health Source
drive off Executive Court onto the Corporate Hill Subdivision
lot. No access from the Corporate Hill Subdivision parking lot
is proposed to Corporate Hill Dr.
A. PROPOSALIREOQEST:
Planning Commission approval is requested for a site plan
for a parking lot on an 0-2 zoned lot.
March 14, 1996
SUBDIVISIpN HEARING
ITEM(Cont.)FILE NO.: Z -
B. EXISTING NDITION :
The lot in the Corporate Hill Subdivision is vacant and
undeveloped. Both abutting lots in the Corporate Hill
Subdivision are developed. The abutting lot to the west, in
the Executive Park Addition, is the location of the
applicant's current offices and existing parking area.
The site is zoned 0-2, as is all other property in the
Corporate Hill Subdivision to the south, east, and north.
The property in the Executive Park Addition to the west is
zoned O-3.
C. ENGINEERING UTILITY COMMENTS:
The Pubic Works staff comments include:
An APDC&E permit and a site grading and excavation
permit form the City will be required to be obtained
prior to beginning work.
An SFHA development permit is required.
Stormwater detention analysis is required.
Access, to the parking lot must be by way of a minimum
27 foot wide drive, with a sidewalk to be constructed
along at least one side of the drive.
The center aisle must be a minimum of 24 feet in width.
The planned turn -out for a future extension must be a
minimum of 27 feet in width.
Little Rock Municipal Water Works commented that there was
no objection to the proposed project from the Utility, but
notes that there is an acreage charge of $150 per acre which
is applicable in this area, should water service be needed.
Little Rock Waste Water Utility comments that sewer service
is available to the site.
Arkansas Power and Light Co. commented that a 15 foot
easement is needed around the entire perimeter of the
property.
Southwestern Bell Telephone Co. will require a 5 foot
easement around the entire perimeter (except for the street
frontage).
Arkansas Louisiana Gas Co. approved the submittal.
2
March 14, 1996
SUBDIVISION HEARINS
ITEM(ContFILE NO.• Z - 3689-G
The Fire Department approved the submittal.
D. ISSUE LEGAL TECHNICAL DE -GN:
Neighborhoods and Planing staff comments include:
Sec. 36-126 thru Sec. 36-127 require Planning
Commission review and approval for development of sites
in, among others, 0-2 zoned properties. The
development of the parking facility on the 0-2 zoned
lot, is, therefore, required by the Zoning Ordinance.
The Plans Review Specialist notes that the areas set
aside for buffers and landscaping meet Ordinance
requirements.
E. ANALYSIS•
There are no issues to be resolved. The parking lot design
is in conformance with all applicable requirements.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of the site plan.
SUBDIVISION COMMITTEE C MMENT: (FEBRIIARY 2, 1995)
Mr. Pat McGetrick, the project engineer, was present. Staff
outlined the proposal and reviewed with the Committee members the
proposed site plan. The Public Works staff person, David
Scherer, reviewed the Public works comments. The Neighborhoods.
and Planning staff presented the discussion outline and discussed
the concerns raised. The Neighborhoods and Planning staff
reported that, eventually, a new office building was anticipated
to be built on the subject lot, and that the parking lot being
built would serve the future building. Staff pointed out that,
when access to the future building is gained from Corporate Hill
Dr., tying the subject parking lot into Corporate Hill Dr.,
Corporate Hill Dr. would be tied into Executive Court by way of
the drive-thru. Staff pointed out that this was a similar
situation to the drive-thru created when the abutting lots to the
north were developed. The Committee members and the
Neighborhoods and Planning staff persons asked that the applicant
make provisions to limit access across the vacant portion of the
lot onto Corporate Hill Dr., not permitting vehicle access on the
unpaved "trail" or across the lot. Mr. McGetrick responded that
this concern would be addressed. The Committee forwarded the
item to the full Commission for the public hearing.
3
March 14, 1996
,gUBDIVISION HEARING
ITEM NO.: 9 (Cont.) FILE NO.: Z-3689
PLANNING COMMISSION ACTION: (MARCH 14, 1996)
Staff reported that the applicant had submitted a revised site
plan which addresses the concerns and issues raised and discussed
at the Subdivision Committee meeting. Staff reported that there
are no land use issues in this application and that staff had
received no communications from area property owners or residents
concerning this issue. Staff recommends approval of the site
plan. The approval of the site plan was included on the Consent
Agenda for Approval, and was approved with the vote of 9 ayes,
0 nays, 1 absent, 0 abstentions, and 1 open position.
4