HomeMy WebLinkAboutZ-3608-A Staff AnalysisDecember 15, 1980
Item No. 3 - Z -3608-A
Owner: St. Paul Baptist Church
By: Luther Jeffery, Pastor
Address: 2603 Commerce Street
Description: Lots 1, 2 and 3, Block 4, Pettifer's
Addition
Zoned: "C-3" General Commercial
Variance
Requested: Relief from Section 7-103.3d to
permit a 14 foot encroachment into
a required side yard and a six foot
encroachment into the other required
side yard.
Present Use of
Property: Church
Proposed Use of
Property: Church (new construction)
Staff Recommendation:
The proposal is to construct a new church on this property
as shown on the sketch leaving in place the existing church
• sanctuary until completion of the new facility. Upon
completion of the new church, the old structure is scheduled
for razing to provide space for off-street parking.
The church is a neighborhood facility and staff has in the
file a petition signed by all neighboring property owners
stating their support of the variance requested and citing
the desire to retain the present place of worship throughout
the construction period.
Staff finds no public interest in forcing a literal
application of the ordinance on this project and recommends
approval of the variance.
Board Action:
The applicant was present and there were no objectors.
After a brief discussion, the Board moved to approve the
application as filed. The motion was passed: 6 ayes,
0 noes, 1 absent.
December 15, 1980
Item No. 3 - Z -3608-A
Owner: St. Paul Baptist Church
By: Luther Jeffery, Pastor
Address: 2603 Commerce Street
Description: Lots 1, 2 and 3, Block 4, Pettifer's
Addition
Zoned: "C-3" General Commercial
Variance
Requested: Relief from Section 7-103.3d to
permit a 14 foot encroachment into
a required side yard and a six foot
encroachment into the other required
side yard.
Present Use of
Property: Church
Proposed Use of
Property: Church (new construction]
Staff Recommendation:
The proposal is to construct a new church on this property
as shown on the sketch leaving in place the existing church
sanctuary until completion of the new facility. Upon
completion of the new church, the old structure is scheduled
for razing to provide space for off. -street parking.
The church is a neighborhood facility and staff has in the
file a petition signed by all neighboring property owners
stating their support of the variance requested and citing
the desire to retain the present place of worship throughout
the construction period.
Staff finds no public interest in forcing a literal
application of the ordinance on this project and recommends
approval of the variance.