Loading...
HomeMy WebLinkAboutZ-3602-B Map 4DARNELL CONSTRUCTION WE BUILD SOLUTIONS'" KAUFMAN LUMBER LITTLE ROCK , AR ~' PROJECT DESCRIPTION: STEEL CANOPY BUILDING DRAWINGA8HREVIATiONS TYP. TYPICAL O.A.L. OVERALL LENGTH SIM. SIMILAR SL STEEL LINE CLCENTERLINE z a_ W T.O.B TOP OF BEAM B.O.B BOTTOM OF BEAM T.O.A TOP OF ARM T.F.F TOP OF FINISH FLOOR C/C CENTER TO CENTER 0/C OUT TO CENTER SYMBOL DESIGNATIONS SECTION/DETAIL NUMBER ��,��� SSESHEET NUMBER t CROSS SECTION DETAIL VERSION NUMBER SHEEP FILE NUMBER STRUCTURE NUMBER QUOTE NUMBER QUOTE YEAR PRINT SCALE SHEETSIZE FULL SCALE 36x24 (ARCH D) FULL SCALE 34x22 (ANSI D) 1/2 SCALE 17x11 (ANSI C) NO SCALE 11 x8.5 (ANSI A) EXAMPLE FILE NAME: D13-12345-00-00-0O.dw9(17x11) PAG PDF PRINT INSTRUCTIONS: (TO PRINT PDF TO NOTED SCALES ABOVE) 1. SET PAGE SCALING TO 'NONE'. 2. CHECK "CHOOSE PAPER SOURCE BY PDF PAGE SIZE". IF "FIT TO PRINTABLE AREA" IS SELECTED, THEN DRAWINGS WILL NOT PRINT TO SCALE- CS CALE CS COVER SHEET a n 4v O E c Z r; 0 z aL z0 J O` LL - a 0 z ®9 E z Y 0 1N) U L LL o v� a 0m= w °(a7� tan z om2C W�� -0: t /Zyso =a�E E iiy� _ W . w Qzm 0pc �c:) Z In 0 ❑ r N a N a 3 a d of O W 00 < Q U) W U Y z a_ W o O Lu i Z 0 a Q a= v O za) 12W tn� LN rj LL J o LU i w a� Q wm Q w r a J= w U N = 0 to STRC #: I SHEET NO: CS SCALE: AS NOTED E z Y 0.0 L oa o m N LU U) JZi ow J—o ata3 Z�Om o nLL E mo x¢ o QZ m N p N O C3, �V 3 O N N Z Lo C m Y N H oNx�a� ¢nNi� 3 Q d 0� O O LLI CD U = Y 4 0 w z 0 a Z O O Q z2Lu CL z O Lo LLIN LL J 3LU w F- Ez w � f S o a =(� m r � m STRC #: SHEET N0: C1 SCALE: AS NOTED 3'-6- (9) #10 BARS VERTICAL (3" COVER) (3) #3 STIRRUPS 3" O.0 ® TOP (3" COVER) 1 STIRRUPS 12" O.0 " COVER) (3) #3 STIRRUPS 3" O.0 ® BOTTOM (3" COVER) F1 FOOTING DETAIL -TYPICAL ALL LOCATIONS SCALE: NOT TO SCALE -Rs: M -al Anchor Bctll D -F mr !se t i.Dee In N Anchor III -kch. m1ft to be A -W7 (w "d --b 1. w STANDARDANCHOR BOLT DETAIL LEN nur �r Hak Put[ BOLT DIA BOLT DIA LENGTH A THREAD PROJ 1/2" V-6' 1J2' 1'-6' 1 1 4 316 x 1 1/2 x t 1J2 5/16 2' 9 1/2", 5/8' 1'-6 1 1/2' 1/2 x 1 3 4 x 1 3/4 5/16 2' 2' 3 4' 2'»6' 1 3j* 1/2 x 2 1J4 x 2 1/4 5/16 2 1/2" 2 1/2' 7/8' 2'-6" 2' 5/8 x 2 18 x 2 1 L2 16 3 tJ2 3 1/2- 1- 2'-6" 2 1 43 4 x 3; 3 5/16 3 1/2 3 1/2' 1 1/4 2'-6' 2 1J4 1; 5 x 5 5/16 3 11Z 31/2 -Rs: M -al Anchor Bctll D -F mr !se t i.Dee In N Anchor III -kch. m1ft to be A -W7 (w "d --b 1. w «Rw Nmufac. Mch r 13A DrwP Tar S'm s ux:mwn m NICMJr exxn Mdar 1111 to 1a A-307 I. eylwlwR). NOTES ABOUT CONCRETE: 1. SOILS REPORT WAS NOT AVAILABLE. THE SUPPORTING SOIL IS ASSUMED TO BE I GANIC WITCAPIII CI QF ON P ARE FOOT ZOOO 1a. SOIL CAPACITY TO BE VERIFIED BY OWNER OR GENERAL CONTRACTOR 2. PROPER INSTALLATION OF CONCRETE IS IMPORTANT 0 MINIMIZE CRACKS AND OBTAIN DESIRED CONCRETE STRENGTH. CURING: A MINIMUM AMOUNT OF CURING IS RECOMMENDED TO OBTAIN A DURABLE HARD CONCRETE. THIS CAN BE OBTAINED BY COVERING THE SURFACE WITH VISQUEEN PLASTIC IMME01ATELY AFTER THE CONCRETE HAS HARDENED. LEAVE PLASTIC IN PLACE FOR A MINIMUM OF 7 DAYS. COLD WEATHER INSTALLATION: DO NOT ALLOW CONCRETE TO FREEZE FOR AT LEAST 7 DAYS AFTER CONCRETE HAS SET, FOLLOW RECOMMENDATION OF ACI DOCUMENT 3❑6 TITLED "COLD WEATHER CONCRETING% HOT WEATHER INSTALLATION: DO NOT ALLOW SURFACE TO DRY BEFORE APPLYING VISQUEEN PLASTIC OR OTHER CURING MEDIUM. FOLLOW RECOMMENDATION OF ACI DOCUMENT 305 TITLED "HOT WEATHER CONCRETING% 3. MATERIALS: CONCRETE TO BE 3000 PSI IN 28 DAYS WITH 6X AIR ENTRAINMENT. REBAR - Fy = 60 ksi (GRADE 60) wwf - Fy = 65 ksi w (NOTE: 6X6-W1.4XW1.4 (10 GA.) MAY BE SUBSTITUTED WITH 1 LB. PER CUBIC YARD OF z 171101170_urou CONCRETE) Z U U U U ALTERNATEANCHOR BOLT DETAIL LENGTH 70 AREA Of ANCHOR PLATE BOLT DIA LENGTH A DOUBLE NUT B WASHER WELD SIZE THREAD PROJ 1/2" V-6' t 114' 5/16 2' 11 1/2"1 5/8' V—V' 1 1/2' 5/16 2' 2- 3/4' 2'-6' 1 V4w 5/16 2 1/?' t 1/2' 7/6' 2'-6' 2' 5/16 3 1/2" 3 1/Y 1" 2'-6' 2 1/4' W16 3 1/2 3 1J2 1 1/4 2Z-6' 2 114" 5/16 3 1/2" 3 1/2 «Rw Nmufac. Mch r 13A DrwP Tar S'm s ux:mwn m NICMJr exxn Mdar 1111 to 1a A-307 I. eylwlwR). NOTES ABOUT CONCRETE: 1. SOILS REPORT WAS NOT AVAILABLE. THE SUPPORTING SOIL IS ASSUMED TO BE I GANIC WITCAPIII CI QF ON P ARE FOOT ZOOO 1a. SOIL CAPACITY TO BE VERIFIED BY OWNER OR GENERAL CONTRACTOR 2. PROPER INSTALLATION OF CONCRETE IS IMPORTANT 0 MINIMIZE CRACKS AND OBTAIN DESIRED CONCRETE STRENGTH. CURING: A MINIMUM AMOUNT OF CURING IS RECOMMENDED TO OBTAIN A DURABLE HARD CONCRETE. THIS CAN BE OBTAINED BY COVERING THE SURFACE WITH VISQUEEN PLASTIC IMME01ATELY AFTER THE CONCRETE HAS HARDENED. LEAVE PLASTIC IN PLACE FOR A MINIMUM OF 7 DAYS. COLD WEATHER INSTALLATION: DO NOT ALLOW CONCRETE TO FREEZE FOR AT LEAST 7 DAYS AFTER CONCRETE HAS SET, FOLLOW RECOMMENDATION OF ACI DOCUMENT 3❑6 TITLED "COLD WEATHER CONCRETING% HOT WEATHER INSTALLATION: DO NOT ALLOW SURFACE TO DRY BEFORE APPLYING VISQUEEN PLASTIC OR OTHER CURING MEDIUM. FOLLOW RECOMMENDATION OF ACI DOCUMENT 305 TITLED "HOT WEATHER CONCRETING% 3. MATERIALS: CONCRETE TO BE 3000 PSI IN 28 DAYS WITH 6X AIR ENTRAINMENT. REBAR - Fy = 60 ksi (GRADE 60) wwf - Fy = 65 ksi w (NOTE: 6X6-W1.4XW1.4 (10 GA.) MAY BE SUBSTITUTED WITH 1 LB. PER CUBIC YARD OF z 171101170_urou CONCRETE) Z U U U U V) Ii F- 0 z STEEL UNE chd F7 FOOTING V) 1 � TYP. (30) PLCS J I l I O 0 O O � O 10 H N I I I NOTE: ALL DIMENSIONS ARE TO CENTER LINE(S) OF FOOTING D I I ROOF STEEL LINE SHOWN FOR REFERENCE O I I I M¢ STEEL LINE u_ 25'- 0" 25'-0" 25'-0' 25'-0" 25'-0" o FOUNDATION PLAN SCALE: 3/32" = l'-0" niQ z - Lu Lu - D Q a i z Y � n n w _ L a-' - m a r~ m > 3a Y �a z ati O Z U3 O z� Q z ¢` z 0 u LIS Lu O " L - a O -- z E z Y �0 Y O6AiK y D. O rn - LL, U CDN rn O ca I 3 fimC m T� W_ ���3 Z-^ 6 a� E ac =Q 0 �y= ❑—m ? m m- �x f g 0 v_ ♦` M C z LO scat c M ❑3 z Ui 0 N 0 FL 0mU W r p0 = O ,< a a SCALE: AS NOTED R V) LU F- 0 z chd V) J H w D Z O LU g M¢ EL u_ Y z Z o 0 0 ui Z 0 a HO ZULU rvn0 u+N LL rLLJ w oZ w 0 - w c`LJ ILL =LL m i D ut STRC #: SHEET N0: F01 SCALE: AS NOTED R