HomeMy WebLinkAboutZ-3592-I Staff AnalysisJanuary 30, 1996
ITEM NO.: 7 FILE Z-3592 -I
NAME: FAIRFIELD OFFICE COMPLEX -- ZONING SITE PLAN REVIEW
LOCATION: On the south side of the proposed extension of
Executive Center Dr. to S. Bowman Rd., approximately 0.21 mile
west of Centerview Dr. and 0.2 mile east of S. Bowman Rd.,
approximately 0.4 mile south of Kanis Rd.
DEVELOPER:
ENGINEER:
Pat McGetrick
FAIRFIELD COMMUNITIES, INC. MCGETRICK ENGINEERING
2800 Cantrell Rd. 11225 Huron Ln., Suite 200
Little Rock, AR 72202 Little Rock, AR 72211
664-6000 223-9900
AREA: 10.5 ACRES UMBER OF LOTS: 1 FT. NEW STREET: 723
ZONING: 0-1; OS
PLANNING DISTRICT: 11
CENSUS TRACT: 24.04
VARIANCESRE ESTED:
PROPOSED USES: Office
1). Approval of a variance to encroach into a portion of
the OS -zoned area to recontour land and re -plant the
area; and,
2). Approval -of a variance from the requirement of the
Excavation Ordinance to permit recontouring of the
slope in the OS strip with a 3:1 slope, without a
"bench" in a slope which exceeds 15 feet in height.
STATEMENT OF PR POSAL:
Review of the proposed site plan for the new Fairfield Office
Complex is requested in order to meet the requirement for
Planning Coiranission review and approval of plans which involve a
proposal to encroach into OS (Open Space) zoned land.
The applicant proposes the development of a 10.5 acre lot, to
include construction of a building which will contain the
corporate offices and a service center for Fairfield, access
drives, and parking for 266 vehicles. The development is on one
lot in a recently approved subdivision, which includes the
extension of Executive Center Dr. from its present termination,
just east of the Fairfield site, along the north boundary of the
January 30, 1996
SUBDIVISIO
ITEM NO.: 7 Continued FILE N 17-3592-5
Fairfield property, and terminating at an intersection with
Bowman Rd. The project entails a maximum 45 foot w by 404.9 foot
long intrusion into the 200 foot wide "OS" zoned strip which lies
along the southern boundary of the Fairfield tract.
In order to make the grade transition from the yard around the
office building to the grades within the OS area, a strip of the
OS land needs to be graded and recontoured. The applicant
proposes to reshape the land to provide a 3:1 slope (a slope that
rises one foot for each 3 feet of length), then to heavily
replant the area with appropriate plants and trees. The total
height of the embankment will be just over 15 feet, and, because
the Excavation Ordinance requires "benches" (terraces) when the
embankment exceeds 15 feet, and the applicant's design does not
include benching of the embankment, a variance form the
requirements of the Excavation Ordinance is requested. The
applicant explains that if a bench is created in the embankment,
to be able to get the same amount of total rise within, the same
amount of horizontal distance, the slope of the embankment will
have to be increased. The steeper slope will make it harder to
landscape the sloped area and to maintain it.
A. PRO 'OS ALIR�:
Review and approval by the Planning Commission is requested
for a variance to encroach into a portion of the OS -zoned
area to recontour land and re -plant the area.
Approval of a variance is requested from the requirement of
the Excavation Ordinance to permit recontouring of the slope
in the OS strip with a 3:1 slope, without a "bench" in a
slope which exceeds 15 feet in height.
B. RXISTI G CONDITIONS:
The site is undeveloped and heavily wooded. The terrain is
fairly rugged, with slopes generally at or above 12%, with
some areas as steep as 30% in grade.
The existing zoning of the site is 0-1 and OS. Within the
past month, zoning of the subdivision was changed from that
shown on the area zoning map of the site. The MF -12 zoning
was eliminated, and the entire subdivision was zoned 0-1
south of the Executive Center Dr. extension, and 0-3 north
of Executive Center Dr. The OS strip remained unchanged.
Zoning south of the 200 foot deep OS strip is R-2. To the
east and to the west of the building site is zoned 0-1.
Across Executive Center Dr., all land is zoned 0-3.
2
January 30, 1996
SUBDIVISION
ITEM NO.: 7 Cant. F'II,E a.: Z -3592-z
C. ENGINEERING/UTILITY COMMENTS:
The Public Works staff comments include:
The proposed grading in the OS strip violates the
Excavation Ordinance. The plan should be modified to
accommodate benching of the slope, as required by the
Ordinance, or a variance should be sought from the
Planning Commission.
Right-of-way for and construction of the extension of
Executive Center Dr. to collector standards, pursuant
to the Master Street Plan, must be provided for. A
sidewalk along Executive Center Dr. is required. The
sidewalk along the street must be connected to the walk
along the entrance drive.
The westerly drive should be 27 feet in width. A 36
foot minimum width for the driveway at the center of
the site must be provided. The northeast parking lot
should be rotated 900 in order to relocate the drive a
minim of 120 feet south of its intersection with
Executive Center Dr.
Grading permits must be obtained, and erosion control
plans must be provided prior to construction. All
disturbed areas are to be seeded and mulched for
erosion control prior to final platting of the lots.
Stormwater detention analysis is required. The impact
of drainage on adjacent properties should be considered
in the design of the system.
Little Rock Municipal Water Works commented that a water
main extension and on-site fire protection will be required.
Little Rock Wastewater utility commented that a sewer main
extension, with easements, will be required.
Arkansas Louisiana Gas Co. approved the submittal.
Southwestern Bell Telephone Co. approved the submittal.
The Fire Department noted that in the future, proper fire
hydrant placement will be needed.
r
January 30, 1996
SUB]7IVISIO
ITEM NO.*. 7(Cont.)FILE O.: Z-3592-1
D. I SUESILEGALITECHNICALIDESIGN:
Sec. 36-340, the requirements for OS, Open Space, zoning
District land, states that the area is used as a buffer zone
between uses which are not compatible with each other. It
states: In this case, no building or structure... may be
erected, no trees may be removed, and no paving for wheeled
vehicles will be allowed." It continues: "...all such
areas shall remain in their natural state, unless otherwise
authorized by the City." It says: "Enhancement of the
buffer area, such as additional screening or planting, may
be required...."
The Site Plan Review Specialist comments:
The proposed on-site buffer along Executive Center Dr.
meets and exceeds the 28 foot width requirement, when
averaged out, but drops to a width of 15 feet in some
areas.
If dumpsters are to be used, they must be located on
the plan and screened on three sides an 8 foot high
opaque wall or wood fence.
Areas set aside for perimeter, interior, and building
landscaping meet Landscape Ordinance requirements Curb
and gutter will be required to protect landscaped areas
from vehicular traffic.
The method to be implemented to protect the land use
buffers from being cleared beyond that area approved
must be identified.
The cross section of the portion of the OS area
proposed to be cleared and filled has been submitted,
and is acceptable. The plan for the proposed treatment
of the OS area meets or exceeds the Ordinance
requirements. Ground cover, shrubs, and trees exceed
density and minimum size requirements.
E. ANALYSIS•
The only reason for the site plan review is because of the
encroachment into the OS zoned strip, and the requirement for
approval of such an encroachment. The site is zoned 0-1, and
0-1 zoned property does not require site plan review by the
Planning Commission.
The landscape plan shows heavy landscaping in the area of
the OS strip which is being regraded and sloped. The
density and quantity of the ground cover, scrubs, and trees
exceed the Ordinance standards.
4
January 30, 1996
SUBDIVISION
ITEM NO.: 7 C nt. FILE NO.: Z- 5 2-T
The decision on whether a bench or benches should or should
not be required needs to be based on both engineering
considerations and on whether benching does or does not
provide the better means of assuring proper treatment of the
encroachment into the open space. whether trees can or
cannot be successfully planted and maintained on the slope
without the benching needs to be addressed.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of a variance to permit the
encroachment into the portion of the OS -zoned area to
recontour land and re -plant the area.
The staff recommendation on whether to require benching of
the slope will be developed and reported that at the
Planning Commission meeting.
SUBDIVT TON COMMITTEE COMMENT: (JANUARY 4, 1996)
Mr. Pat McGetrick, the project engineer, was present. Staff
explained the reason for the site plan review, noting that the
proposal includes an encroachment into the OS strip, and any such
encroachment requires Planning Commission approval. Staff
presented the discussion outline, and David Scherer, with the
Public Works staff, went into detail on the Public Works
concerns. Public Works, he said, was primarily concerned about
the proximity of the entrance drive to the northeast parking lot
from the main central driveway being so close to Executive Center
Dr.. He said that not enough vehicle stacking space was being
provided in that situation. He reported that the Traffic
Engineer recommend rotating the parking lot to move the entrance
to the parking lot further away from Executive Center Dr. Mr.
McGetrick responded that he would take the Public Works comments
under advisement. Mr. McGetrick reviewed the plans for the
treatment of the encroachment, and Bob Brown, with the
Neighborhoods and Planning staff, reported that the slope and
proposed plantings were acceptable. The Committee forwarded the
item to the full Commission for the public hearing.
PLANNING COMMISSION ACTION: (JANUARY 30, 1996)
Staff explained that, when an encroachment into a zoned "OS" area
is proposed, the Zoning Ordinance requires review and approval by
the Planning Commission of any such encroachment and the means to
be undertaken to mitigate the effects of the encroachment. Staff
explained that the encroachment into the OS zone and the means
proposed to recontour and replant the land are the only issues to
be dealt with in the hearing; that other site plan review issues
are not included in the scope of review. Staff reported that
5
January 30, 1996
SUBDIVISION
ITEM NO.: 7 Cont. FILE NO.: Z-35 2-T
there were no remaining issues to resolve; that the proposal to
replant the encroachment meets and exceeds Ordinance requirements
and that, as long as the applicant met the Public Works
requirement to properly "bench" (or terrace) the embankment in
conformance with the Excavation Ordinance, Public Works
recommended approval of the encroachment.
Staff recommended that the approval, with the condition noted by
Public Works, be included in the Consent Agenda for approval.
The item was included on the Consent Agenda for approval, and
was approved with the vote of 10 ayes, 0 nays, 2 absent, and
0 abstentions.
11