HomeMy WebLinkAboutZ-3500-D Staff AnalysisFILE NO.: Z -3500-D
NAME: Pereira - Short -Form PD -0
LOCATION: 212 N. McKinley Street
DEVELOPER:
Firstar Bank
#1 Riverfront Place
North Little Rock, AR 72114
AREA: 0.52 acre
ZONING: R-2
ENGINEER:
McGetrick and McGetrick
319 East Markham St., Ste. 202
Little Rock, AR 72201
NUMBER OF LOTS: 1 FT. NEW STREET: 0
ALLOWED USES: Single -Family Residential
PROPOSED USE: Acupuncture Clinic
VARIANCES/WAIVERS REQUESTED:
1. Deferral of required sidewalk construction for four (4) years
or until adjacent walk is constructed.
BACKGROUND:
The property at 212 N. McKinley is zoned R-2 and contains a
2,950 square foot, two-story building. The building is
currently vacant, but once housed a daycare center that operated
under an approved conditional use permit.
On May 11, 2000 the Planning Commission approved a rezoning of
this property from R-2 to PD -0 for a "birth center", and an
accompanying land use plan amendment. However, the applicant
decided not to pursue the rezoning and withdrew it from the
Board of Director's agenda. The applicant did follow through
with the land use plan amendment, and on June 20, 2000 the Board
of Directors passed ordinance No. 18,296. This ordinance
changed the land use plan for this property and the two (2)
properties immediately north from SF (single family) to SO
(Suburban Office).
FILE NO.: Z -3500-D (Cont.)
A. PROPOSAL/REQUEST:
The applicant proposes to rezone the property at 212 N.
McKinley Street from R-2 to PD -O to utilize the existing
building as an acupuncture clinic. The applicant is
requesting 0-1 (Quiet Office District) permitted uses as an
alternate/future use of the building.
The proposed acupuncture clinic will have one (1) doctor
and two (2) additional staff members. The clinic will also
have an accessory herb dispensary, which will be for the
clinic's patients only. The proposed hours of operation
will be from 9:00 a.m. to 5:00 p.m., Monday through Friday.
The proposed site plan shows a ground -mounted sign location
near the southeast corner of the property. The applicant
notes that the sign will conform to City standards for
office zoning (maximum height - 6 feet, maximum area - 64
square feet).
The property contains an existing 2,950 square foot, two-
story building, with parking along the building's north and
south sides. The applicant notes that there will be no
physical changes made to the property except for the
addition of the ground -mounted sign and reduction of the
paved areas to allow for the required buffer areas along
the north and south property lines. The applicant also
notes that there will be no dumpster on the site.
As part of the PD -O request, the applicant is requesting a
deferral of sidewalk construction along N. McKinley Street.
The requested deferral would be for four (4) years or until
adjacent development occurs.
B. EXISTING CONDITIONS:
There is an existing two-story stucco building on the site,
with a circular drive. There are small areas of existing
paved parking on the building's north and south sides.
There is an existing six-foot wood screening fence along
the south, west and a portion of the north property lines.
There are single family residences immediately north, south
and west of the site. The Park Plaza Mall is located
across McKinley Street to the east.
C. NEIGHBORHOOD COMMENTS:
The Briarwood and Hillcrest Neighborhood Associations were
notified of the public hearing. Staff has received no
comment from the neighborhood as of this writing.
2
FILE NO.: Z -3500-D (Cont.)
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. McKinley Street is classified on the Master Street Plan
as a collector street. Dedicate right-of-way to 30 feet
from centerline.
2. Property frontage needs to have the sidewalks and ramps
brought up to the current ADA standards.
3. Repair or replace any curb and gutter or sidewalk that is
damaged in the public right-of-way prior to occupancy.
4. Plans of all work in right-of-way shall be submitted for
approval prior to start of work.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Location of sewer service unknown. No sewer
main is located in this area. Sewer main extension required
with easements to serve property if service is required.
Entergy: Provide easements for existing overhead facilities
(10 foot easement along west and south property lines and a
15 foot easement along the east property line).
ARKLA: No Comment.
Southwestern Bell: No Comment.
Water: No Comment.
Fire Department: No Comment.
County Planning: No Comment.
CATA: Site is on bus route #21 and has no effect on bus
radius, turnout and route.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division:
This request is located in the West Little Rock Planning
District. The Land Use Plan shows Suburban Office for this
property. The applicant has applied for a Planned
Development -Office for an acupuncture clinic. The property
is currently zoned R-2 Single Family. A Land Use Plan
amendment is not required.
3
FILE NO.: Z -3500-D (Cont.)
City Recognized Neighborhood Action Plan:
This property is located in an area that is not covered by
a city recognized neighborhood action plan.
Landscape Issues:
The plan submitted does not allow for the 9 -foot wide
minimum land use buffers along the northern and southern
perimeters of the site.
A water source within 75 feet of all landscaped areas is
required.
G. SUBDIVISION COMMITTEE COMMENT: (FEBRUARY 15, 2001)
Pat McGetrick was present, representing the application.
Staff briefly described the proposed PD -0 and noted that
additional information was needed regarding the proposed
use (hours, signage, number of employees, etc.).
The Public Works requirements were briefly discussed.
Mr. McGetrick noted that a deferral of sidewalk
construction was requested.
The landscaping requirements were also briefly discussed.
Bob Brown, of the Planning Staff, noted that additional
buffer width was needed between the north and south parking
areas and the side property lines.
After the brief discussion, the Committee forwarded the
PD -0 application to the full Commission for resolution.
H. ANALYSIS:
The applicant submitted a revised site plan to staff on
February 21, 2001. The revised plan addresses the issues
as raised by staff and the Subdivision Committee. The
revised plan provides for the required nine (9) foot wide
land use buffers along the north and south property lines.
The proposed site plan shows a total of eight (8) parking
spaces. The ordinance would typically require a minimum of
six (6) parking spaces for a clinic of this size. If the
building is ever converted to general/professional office
use, the typical ordinance minimum would be seven (7)
spaces. Staff supports the parking plan as proposed.
4
FILE NO.: Z -3500-D (Cont.)
As noted in paragraph A., the applicant is requesting a
deferral of sidewalk construction along N. McKinley Street.
Public Works supports the deferral for four (4) years or
until adjacent sidewalk construction, whichever occurs
first.
To staff's knowledge, there are no outstanding issues
associated with the proposed PD -O. Staff feels that the
proposed use of the property is appropriate and should have
no adverse impact on the general area.
I. STAFF RECOMMENDATIONS:
Staff recommends approval of the PD -O rezoning subject to
the following conditions:
1. Compliance with the requirements as noted in paragraphs
D, E and F of this report.
2. Staff supports 0-1 permitted uses as alternate uses for
the property.
3. Any site lighting must be low-level and directed away
from adjacent residential property.
4. The ground -mounted sign must conform to City standards
for office zoning (maximum height - 6 feet, maximum area
- 64 square feet) .
5. Staff supports the deferral of sidewalk construction
along N. McKinley Street for four (4) years or until
adjacent sidewalk construction, whichever occurs first.
PLANNING COMMISSION ACTION: (MARCH 8, 2001)
The staff presented a positive recommendation on this
application, as there were no further issues for resolution.
There were no objectors to this matter.
The Chairman placed the item before the Commission for inclusion
within the Consent Agenda for approval as recommended by staff.
A motion to that effect was made. The motion passed by a vote
of 9 ayes, 0 nays and 2 absent.
5
March 8, 2001
ITEM NO.: 3
NAME: Pereira - Short -Form PD -O
LOCATION: 212 N. McKinley Street
DEVELOPER:
ENGINEER:
FILE NO.: Z -3500-D
Firstar Bank McGetrick and McGetrick
#1 Riverfront Place 319 East Markham St., Ste. 202
North Little Rock, AR 72114 Little Rock, AR 72201
AREA: 0.52 acre NUMBER OF LOTS: 1 FT. NEW STREET: 0
ZONING: R-2 ALLOWED USES: Single -Family Residential
PROPOSED USE: Acupuncture Clinic
VARIANCES/WAIVERS REQUESTED:
1. Deferral of required sidewalk construction for four (4) years
or until adjacent walk is constructed.
BACKGROUND:
The property at 212 N. McKinley is zoned R-2 and contains a
2,950 square foot, two-story building. The building is
currently vacant, but once housed a daycare center that operated
under an approved conditional use permit.
On May 11, 2000 the Planning Commission approved a rezoning of
this property from R-2 to PD -O for a "birth center", and an
accompanying land use plan amendment. However, the applicant
decided not to pursue the rezoning and withdrew it from the
Board of Director's agenda. The applicant did follow through
with the land use plan amendment, and on June 20, 2000 the Board
of Directors passed ordinance No. 18,296. This ordinance
changed the land use plan for this property and the two (2)
properties immediately north from SF (single family) to SO
(Suburban Office).
March 8, 2001
SUBDIVISION
ITEM NO.: 3 (Cont.
A. PROPOSAL/REQUEST:
FILE NO.: Z -3500-D
The applicant proposes to rezone the property at 212 N.
McKinley Street from R-2 to PD -O to utilize the existing
building as an acupuncture clinic. The applicant is
requesting 0-1 (Quiet Office District) permitted uses as an
alternate/future use of the building.
The proposed acupuncture clinic will have one (1) doctor
and two (2) additional staff members. The clinic will also
have an accessory herb dispensary, which will be for the
clinic's patients only. The proposed hours of operation
will be from 9:00 a.m. to 5:00 p.m., Monday through Friday.
The proposed site plan shows a ground -mounted sign location
near the southeast corner of the property. The applicant
notes that the sign will conform to City standards for
office zoning (maximum height - 6 feet, maximum area - 64
square feet) .
The property contains an existing 2,950 square foot, two-
story building, with parking along the building's north and
south sides. The applicant notes that there will be no
physical changes made to the property except for the
addition of the ground -mounted sign and reduction of the
paved areas to allow for the required buffer areas along
the north and south property lines. The applicant also
notes that there will be no dumpster on the site.
As part of the PD -O request, the applicant is requesting a
deferral of sidewalk construction along N. McKinley Street.
The requested deferral would be for four (4) years or until
adjacent development occurs.
B. EXISTING CONDITIONS:
There is an existing two-story stucco building on the site,
with a circular drive. There are small areas of existing
paved parking on the building's north and south sides.
There is an existing six-foot wood screening fence along
the south, west and a portion of the north property lines.
There are single family residences immediately north, south
and west of the site. The Park Plaza Mall is located
across McKinley Street to the east.
C. NEIGHBORHOOD COMMENTS:
The Briarwood and Hillcrest Neighborhood Associations were
notified of the public hearing. Staff has received no
comment from the neighborhood as of this writing.
2
March 8, 2001
SUBDIVISION
ITEM NO.: 3 (Cont.) FILE NO.: Z -3500-D
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. McKinley Street is classified on the Master Street Plan
as a collector street. Dedicate right-of-way to 30 feet
from centerline.
2. Property frontage needs to have the sidewalks and ramps
brought up to the current ADA standards.
3. Repair or replace any curb and gutter or sidewalk that is
damaged in the public right-of-way prior to occupancy.
4. Plans of all work in right-of-way shall be submitted for
approval prior to start of work.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Location of sewer service unknown. No sewer
main is located in this area. Sewer main extension required
with easements to serve property if service is required.
Entergy: Provide easements for existing overhead facilities
(10 foot easement along west and south property lines and a
15 foot easement along the east property line).
ARKLA: No Comment.
Southwestern Bell: No Comment.
Water: No Comment.
Fire Department: No Comment.
County Planning: No Comment.
CATA: Site is on bus route #21 and has no effect on bus
radius, turnout and route.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division:
This request is located in the West Little Rock Planning
District. The Land Use Plan shows Suburban Office for this
property. The applicant has applied for a Planned
Development -Office for an acupuncture clinic. The property
3
March 8, 2001
SUBDIVISION
ITEM NO.: 3 (Cont.
G
H.
is currently zoned R-2 Single Family.
amendment is not required.
FILE NO.: Z -3500-D
A Land Use Plan
City Recognized Neighborhood Action Plan:
This property is located in an area that is not covered by
a city recognized neighborhood action plan.
Landscape Issues:
The plan submitted does not allow for the 9 -foot wide
minimum land use buffers along the northern and southern
perimeters of the site.
A water source within 75 feet of all landscaped areas is
required.
SUBDIVISION COMMITTEE COMMENT:
(FEBRUARY 15, 2001)
Pat McGetrick was present, representing the application.
Staff briefly described the proposed PD -0 and noted that
additional information was needed regarding the proposed
use (hours, signage, number of employees, etc.).
The Public Works requirements were briefly discussed.
Mr. McGetrick noted that a deferral of sidewalk
construction was requested.
The landscaping requirements were also briefly discussed.
Bob Brown, of the Planning Staff, noted that additional
buffer width was needed between the north and south parking
areas and the side property lines.
After the brief discussion, the Committee forwarded the
PD -0 application to the full Commission for resolution.
ANALYSIS:
The applicant submitted a revised site plan to staff on
February 21, 2001. The revised plan addresses the issues
as raised by staff and the Subdivision Committee. The
revised plan provides for the required nine (9) foot wide
land use buffers along the north and south property lines.
4
March 8, 2001
SUBDIVISION
ITEM NO.: 3 (Cont.)
FILE NO.: Z -3500-D
The proposed site plan shows a total of eight (8) parking
spaces. The ordinance would typically require a minimum of
six (6) parking spaces for a clinic of this size. If the
building is ever converted to general/professional office
use, the typical ordinance minimum would be seven (7)
spaces. Staff supports the parking plan as proposed.
As noted in paragraph A., the applicant is requesting a
deferral of sidewalk construction along N. McKinley Street.
Public Works supports the deferral for four (4) years or
until adjacent sidewalk construction, whichever occurs
first.
To staff's knowledge, there are no outstanding issues
associated with the proposed PD -O. Staff feels that the
proposed use of the property is appropriate and should have
no adverse impact on the general area.
I. STAFF RECOMMENDATIONS:
Staff recommends approval of the PD -0 rezoning subject to
the following conditions:
1. Compliance with the requirements as noted in paragraphs
D, E and F of this report.
2. Staff supports 0-1 permitted uses as alternate uses for
the property.
3. Any site lighting must be low-level and directed away
from adjacent residential property.
4. The ground -mounted sign must conform to City standards
for office zoning (maximum height - 6 feet, maximum area
- 64 square feet) .
5. Staff supports the deferral of sidewalk construction
along N. McKinley Street for four (4) years or until
adjacent sidewalk construction, whichever occurs first.
PLANNING COMMISSION ACTION: (MARCH 8, 2001)
The staff presented a positive recommendation on this
application, as there were no further issues for resolution.
There were no objectors to this matter.
The Chairman placed the item before the Commission for inclusion
within the Consent Agenda for approval as recommended by staff.
A motion to that effect was made. The motion passed by a vote
of 9 ayes, 0 nays and 2 absent.
5