HomeMy WebLinkAboutZ-3454-A Staff AnalysisFebruary 21, 1995
ITEM NO_: 8 FILE NO.: Z -3454-A
NAME: Wakefield Missionary Baptist Church
- Conditional Use Permit
LOCATION: 16100 Otter Creek Parkway
OWNER/APPLICANT: Wakefield Missionary Baptist Church
by Thomas Hodges of the Otter Creek
Land Company
PROPOSAL: A conditional use permit is
requested to allow construction of
a church on this MF -6 zoned, 2.5±
acre site. The sanctuary will have
a seating capacity of 291 people,
including the choir. No day-care
or private school programs are
proposed.
ORDINANCE DESIGN _STANDARDS:
1. Site Location
The proposed church site is located on the west side of
Otter Creek Parkway, between Fawn Tree Drive and Wimbledon
Loop; in the Otter Creek Community.
2. Compatibility with Neighborhood
This MF -6 zoned, 2.5 acre site is located in the heart of
Otter Creek, a large, single family residential
neighborhood. The property fronts on a collector street and
is located directly across from an elementary school. A 100
foot wide AP&L easement is located north of the site and the
150 foot wide Callagahan Creek easement is adjacent to the
south. The two, large easements separate the proposed
church site from the single family residential properties.
No ancillary uses such as a day-care program and private
school are proposed.
The proposed use of this property as a church should be
compatible with the neighborhood.
3. On -Site Drives and Parkincr
The proposed church will have a sanctuary capacity of 291
persons, including the choir. Based on a requirement of one
space for every 4 seats, the site requires 72 parking
spaces. The applicant proposes to provide 104 on-site
L
ity of Little Rock13
mepartent of Neighborhoods and Planning
723 West Markham -
Little Rock, Arkansas 72201-1334
(501) 371-4790
February 24, 1995
Thomas Hodges
Otter Creek Land Company
14,000 Otter Creek Parkway
Little Rock, AR 72209
RE: WAKEFIELD MISSIONARY BAPTIST CHURCH
C.U.P. (Z -3454-A)
Dear Mr. Hodges:
Planning
Zoning and
Subdivision
At its February 21, 1995 meeting, the Little Rock Planning
Commission approved your application for a conditional use permit
to allow for the construction of a church on the MF -6 zoned
property located at 16,100 Otter Creek Parkway. This approval
was granted subject to compliance with the following conditions:
1. Compliance with the City Engineer's Comments
2. Compliance with the Utility and Fire Department Comments
3. Compliance with the City's Landscape and Buffer Ordinances
with this exception. A reduced buffer of 5 feet was
approved on the north and south perimeters.
4. Signage is to be limited to that allowed in office and
institutional zones. -
5. Any parking lot lighting is to be low-level and directional,
aimed away from adjacent properties.
The Commission also approved a waiver of the screening
requirement on the north and south perimeters due to the nature
of the adjacent properties.
Based on this approval and your compliance with the conditions
noted above, you may obtain a building permit. Please be advised
that there is a 30 day appeal period and any permits obtained or
construction performed is at the applicant's own risk.
If you have any questions, please call me at 371-6817.
Sinyerely, 61
Dana Carney, Planner I
cc: File No. Z -3454-A
February 21, 1995
SUBDIVISION
ITEM NO.: 8 (Cont.) FILE NO.: Z-3454_
-A
parking spaces, four of which are designated for handicap
use.
4. Screeninc and Buffers
Compliance with the City's Landscape and Buffer Ordinances
is required. The land use buffers on the north and south
perimeters should be 6 feet in width and should contain
opaque screening. Due to the nature of the abutting
properties, the 100 foot AP&L easement and the 150 foot
Callagahan Creek easement, the screening may not be
necessary. The applicant is requesting a reduction in the
buffer width to 5 feet. The reduced buffer will be
landscaped as the Landscape Ordinance requires.
5. City Engineer Comments
Sidewalks per the Master Street Plan are required on the
Otter Creek Parkway frontage. Stormwater detention is
required. A sketch grading and drainage plan meeting the
requirements of Sec. 29-186 are required before
construction. A grading permit is required. A development
permit is required for the flood hazard area. A 25 foot
setback adjacent to the floodway of Callagahan Branch is
required.
6. utility and Fire Department Comments
The driveway between the building and the south property
line must be 20 feet in width. Fire lanes must be marked
with City regulation no parking/two zone signs. Additional
public and/or private fire hydrants may be needed.
7. Analysis
The applicant requests a conditional use permit to allow for
the construction of a church on this MF -6 zoned, 2.5± acre
site. Construction will consist of a single building
containing worship and educational space as well as space
for associated activities such as a fellowship hall and
office areas. No day-care center or private school
activities are proposed. Future expansion of the
educational space is shown on the site plan. Worship
services would be conducted on Sunday and mid -week, using a
normal church schedule. The property is located on a
collector street and is separated from adjacent residences
by a 100 foot AP&L easement and a 150 foot creek easement.
On-site parking, exceeding ordinance requirements, is
provided. Staff believes the proposed church to be a
reasonable use of this property and is supportive of the
request.
2
February 21, 1995
SUBDIVISION
ITEM NO.: 8 (Cont.) _ FILE NO.: Z -3454-A
8. Staff Recommendation
Staff recommends approval of the conditional use permit to
construct a church on this MF -6 zoned site subject to:
1. Compliance with the City Engineer's Comments
2. Compliance with the Utility and Fire Department
Comments
3. Compliance with the City's Landscape and Buffer
Ordinances with this exception. Staff recommends
approval of the reduced 5 foot buffer on the north and
south perimeters as shown on the proposed site plan.
Staff also recommends approval of a waiver of the screening
requirement on the north and south perimeters due to the
nature of the adjacent properties. Landscaping on these
perimeters will be installed in compliance with the City's
Landscape Ordinance.
SUBDIVISION COMMITTEE COMMENT:
(FEBRUARY 2, 1995)
The applicant, Thomas Hodges, was present. Staff presented the
item and outlined the landscaping, City Engineer, Utility and
Fire Department Comments noted above.
It was determined that a reduction in the buffer and screening
requirements on the north and south perimeters may be appropriate
considering the use on the adjacent properties.
In response to a question from staff, Mr. Hodges stated that the
building would not exceed 35 feet in height. He stated that an
ornamental feature, such as a cross, may extend above the
building.
Mr. Hodges was directed to provide details on signage and parking
lot lighting. He was advised that any parking lot lighting must
be low-level and directional, aimed away from adjacent
properties.
After a discussion of proposed landscaping, Mr. Hodges was urged
to provide more interior landscaping in the front parking lot to
break up the large, paved area.
Mr. Hodges stated that the building could be shifted to provide
the required 25 foot setback from Callagahan Branch and the
required 20 foot wide driveway.
3
February 21, 1995
SUBDIVISION
ITEM NO.: 8 (Cont.) FILE NO.: Z -3454 -
Staff advised Mr. Hodges to provide a revised site plan
incorporating the required changes and providing the requested
details on signage and lighting.
The Committee determined that there were no other outstanding
issues and forwarded the item to the full Commission.
PLANNING COMMISSION ACTION: (FEBRUARY 21, 1995)
The applicant was present. There were no objectors present.
Staff presented the item and informed the Commission that a
revised site plan had been submitted which addressed staff's
concerns and that there were no other outstanding issues.
The item was placed on the Consent Agenda and approved subject to
the following conditions:
1.
Compliance
with
the
City Engineer's Comments
2.
Compliance
with
the
Utility and Fire Department Comments
3.
Compliance
with
the
City's Landscape and Buffer Ordinances
with this exception. A reduced buffer of 5 feet was
approved on the north and south perimeters.
4. Signage is to be limited to that allowed in office and
institutional zones.
5. Any parking lot lighting is to be low-level and directional,
aimed away from adjacent properties.
The Commission also approved a waiver of the screening
requirement on the north and south perimeters due to the nature
of the adjacent properties.
The vote was 9 ayes, 0 noes and 2 absent.
4