HomeMy WebLinkAboutDrainage Report2 081922
10505 North College Avenue | Indianapolis, IN 46280 | .www.weihe.net | (317) 846-6611 | (800) 452-6408 | Fax: (317) 843-0546
Allan H. Weihe, P.E., L.S., - Founder
STORMWATER TECHNICAL REPORT
For:
Whataburger
Chenal Parkway and Sulu Road, Little Rock AR
Project #W220196
Prepared For:
TMG Construction Management
15420 Endeavor Dr
Noblesville IN 46060
Tele – (317) 282-0653
Contact Person: Mr. Mike Goins
Prepared By: Scott Rucker, P.E. (IN)
Certified By:
Date:
27 June, 2022
Revised:
26 July, 2022
PROJECT NARRATIVE
Whataburger Drainage Report Weihe Engineers, INC.
7/26/2022
Stormwater Technical Report
Whataburger
Little Rock, AR
Project #W220196
Project Narrative:
TMG Construction Management is proposing to build a new Whataburger restaurant on an
approximately 1.2 acre parcel located at the northeast corner of Chenal Pkwy and Sulu Rd. The
proposed construction is on a site at a Latitude of N 34° 45' 37" and Longitude W 92° 27' 13". The site is
located in Section 36, Township 2 North, Range 14 West, Pulaski County, Arkansas. Please refer to
Figure 1.1
Floodzone:
Based upon a scaled interpretation of the Flood Insurance Map No.05119C0314H for the City of Little
Rock, AR, dated June 7, 2019, the subject tract is located within Zone X Please refer to Figure 1.2.
Stormwater Design:
This development is being designed in conjunction with the neighboring property to the north, a
proposed Taco Bell restaurant. The site grading and stormwater systems for each property have been
designed simultaneously. The Whataburger property will capture stormwater runoff from approximately
1.07 acres including some areas on the north property not captured by the Taco Bell system. Some
perimeter areas of the site will discharge directly to the right-of-way.
The proposed development will include an underground detention basin with a flow restricting structure
that will store and release the site’s stormwater runoff per the requirements set forth by the City’s
ordinance. The site will discharge to the south, releasing into the right-of-way up-stream of an existing
culvert under Sulu Rd. The Taco Bell detention system will outlet directly into the Whataburger
detention system. The Whataburger system has been designed to convey this additional water as a “pass
through” flow.
Existing Conditions:
Currently parcel is mostly wooded with some grassy cover fronting the right-of-way. The project site is
adjoined by a commercial property to the north, Chenal Pkwy to the west, Sulu Rd to the south, and an
undeveloped wooded parcel to the east.
The property consists of the following soil types: Carnasaw-Urban land complex; Carnasaw-
Mountainburg undulating; and Carnasaw-Mountainburg steep. A soil map has been included with this
report. Curve numbers and runoff coefficients were assigned using existing land use in conjunction with
soils mapping from the Natural Resource Conservation (NRCS). An abbreviated NRCS Soils Report has
been included with this report.
The existing conditions of the controlled drainage area have been analyzed to determine the allowable
post-developed release rates. A software model was created using Hydraflow Hydrographs to determine
Whataburger Drainage Report Weihe Engineers, INC.
7/26/2022
the peak release rate for the 25-year event using the SCS method and a 6-hour distribution. A Curve
Number, CN, of 77 was used for the 1.07-acre area. Calculation summaries and software reports have
been included with this report. Please refer to Figure 2.1.
Proposed Conditions:
The proposed on-site storm sewer system will capture approximately 1.07 acres of the proposed
developed area. Runoff from the controlled drainage area will be captured and conveyed to an
underground detention system located on the south side of the site. The site will discharge to the
southeast, releasing into the right-of-way upstream of an existing storm sewer culvert. Please refer to
Figure 2.2.
A weighted Curve Number CN was developed for the proposed conditions of the controlled drainage
area. A software model was created using Hydraflow Hydrographs to determine the peak release rates
for the 25-year event using the SCS 6 hour distribution.
The Taco Bell detention system will outlet directly to the proposed Whataburger detention system. This
additional stormwater flow has been treated as a “pass through” flow. The hydrograph for the Taco Bell
detention system was added to the hydrograph for the proposed Whataburger site. The combined
hydrograph was then routed through the Whataburger detention system. The peak flow rate from the
Taco Bell detention was added to the Whataburger allowable outlet rate to determine the peak allowable
release rate for the combined system.
The model was used to design the underground detention system and outlet control structure in order to
meet the allowable release rate. Calculation summaries, software reports, and an outlet detail have been
included with this report. Please refer to Figure 3.1 for a detail of the outlet control structure. The
computed 25-year peak run-off rates for the existing and proposed conditions have been summarized
below.
Peak flow from Taco Bell 1.99 cfs
Whataburger 10-yr Existing Peak flow 2.38 cfs
Total Allowable Release Rate for Whataburger system 4.37 cfs
Total Proposed Release Rate from Whataburger system 4.34 cfs
Storm Sewers
The storm sewer system is designed to convey stormwater runoff at a minimum velocity of 2.5
feet/second through the HDPE conveyance pipes while maintaining a hydraulic grade line elevation
within the system during a 25-year storm event. For sizing of the storm sewer network, the controlled
drainage basin was broken down into a total of three (3) contributing sub-basins based on proposed
grading plans and structure locations. A weighted runoff coefficient, C, was calculated for each sub-
basin and the time of concentration was assumed to be 5 minutes. Rainfall intensity data was taken from
figure 2-5 of the ordinance. Please refer to Figure 2.3.
DETENTION
CALCULATIONS
Project:
Date:
Job No:
Prepared By:SSR
BASIN: Existing Conditions - Entire Site
Area (SF) Area (Ac.) CN
3655 0.08 98
0 0.00 98
4061 0.09 80
51332 1.18 77
TOTA L =59048 1.36 78.51
% Impervious 6.2
BASIN:Existing Conditions - Controlled Drainage Area
Area (SF) Area (Ac.) CN
0 0.00 98
0 0.00 98
46505 1.07 77
TOTA L =46505 1.07 77.00
% Impervious 0.0
BASIN:Proposed Conditions - Entire Site
Area (SF) Area (Ac.) CN
36575 0.84 98
4970 0.11 98
17503 0.40 80
TOTA L =59048 1.36 92.66
% Impervious 70.4
BASIN:Proposed Conditions - Controlled Drainage Area
Area (SF) Area (Ac.) CN
32231 0.74 98
4939 0.11 98
9335 0.21 80
TOTA L =46505 1.07 94.39
% Impervious 79.9
Roof
Wooded
Cover type
Pavement
Roof
Grass
Whataburger - Little Rock
July 25, 2022
W220196
Existing and Proposed Runoff
Calculations
Cover type
Pavement
Roof
Grass
Wooded
Cover type
Pavement
Grass
Cover type
Pavement
Roof
1
2
45
7
8
Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Project: WB Ex - Pr Det - perf pipe - SCS.gpw Tuesday, 07 / 26 / 2022
Hydrograph Return Period Recap
Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph
No. type hyd(s) Description
(origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr
1 SCS Runoff ------ ------- ------- ------- ------- ------- 3.049 ------- ------- Taco Bell - Proposed
2 Reservoir 1 ------- ------- ------- ------- ------- 1.997 ------- ------- Taco Bell Det Outlet
4 SCS Runoff ------ ------- ------- ------- ------- ------- 2.381 ------- ------- Whataburger Existing
5 SCS Runoff ------ ------- ------- ------- ------- ------- 3.654 ------- ------- Whataburger Proposed
7 Combine 2, 5, ------- ------- ------- ------- ------- 5.420 ------- ------- Total To WB Det
8 Reservoir 7 ------- ------- ------- ------- ------- 4.340 ------- ------- Whataburger Outlet
Proj. file: WB Ex - Pr Det - perf pipe - SCS.gpw Tuesday, 07 / 26 / 2022
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hydrograph Summary Report
Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
No. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cuft) (ft) (cuft)
1 SCS Runoff 3.049 2 144 12,502 ------ ------ ------ Taco Bell - Proposed
2 Reservoir 1.997 2 154 12,498 1 515.34 2,474 Taco Bell Det Outlet
4 SCS Runoff 2.381 2 150 10,105 ------ ------ ------ Whataburger Existing
5 SCS Runoff 3.654 2 144 15,417 ------ ------ ------ Whataburger Proposed
7 Combine 5.420 2 144 27,914 2, 5, ------ ------ Total To WB Det
8 Reservoir 4.340 2 154 27,911 7 512.03 3,197 Whataburger Outlet
WB Ex - Pr Det - perf pipe - SCS.gpw Return Period: 25 Year Tuesday, 07 / 26 / 2022
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 07 / 26 / 2022
Hyd. No. 1
Taco Bell - Proposed
Hydrograph type = SCS Runoff Peak discharge = 3.049 cfs
Storm frequency = 25 yrs Time to peak = 144 min
Time interval = 2 min Hyd. volume = 12,502 cuft
Drainage area = 0.940 ac Curve number = 91.4
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 4.88 in Distribution = SCS 6-Hr
Storm duration = 6.00 hrs Shape factor = 484
0 60 120 180 240 300 360 420
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
Q (cfs)
Time (min)
Taco Bell - Proposed
Hyd. No. 1 -- 25 Year
Hyd No. 1
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 07 / 26 / 2022
Hyd. No. 2
Taco Bell Det Outlet
Hydrograph type = Reservoir Peak discharge = 1.997 cfs
Storm frequency = 25 yrs Time to peak = 154 min
Time interval = 2 min Hyd. volume = 12,498 cuft
Inflow hyd. No. = 1 - Taco Bell - Proposed Max. Elevation = 515.34 ft
Reservoir name = Taco Bell - Det Max. Storage = 2,474 cuft
Storage Indication method used.
0 60 120 180 240 300 360 420
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
Q (cfs)
Time (min)
Taco Bell Det Outlet
Hyd. No. 2 -- 25 Year
Hyd No. 2 Hyd No. 1 Total storage used = 2,474 cuft
Pond Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 07 / 26 / 2022
Pond No. 1 - Taco Bell - Det
Pond Data
UG Chambers -Invert elev. = 512.65 ft, Rise x Span = 2.50 x 2.50 ft, Barrel Len = 155.00 ft, No. Barrels = 2, Slope = 0.10%, Headers = Yes
Encasement -Invert elev. = 512.15 ft, Width = 3.75 ft, Height = 3.25 ft, Voids = 40.00%
Stage / Storage Table
Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft)
0.00 512.15 n/a 0 0
0.34 512.49 n/a 128 128
0.68 512.83 n/a 181 309
1.02 513.17 n/a 267 576
1.36 513.51 n/a 308 884
1.70 513.85 n/a 327 1,210
2.04 514.19 n/a 331 1,542
2.38 514.53 n/a 323 1,865
2.72 514.87 n/a 300 2,165
3.06 515.21 n/a 247 2,411
3.40 515.56 n/a 168 2,580
Culvert / Orifice Structures Weir Structures
[A] [B] [C] [PrfRsr] [A] [B] [C] [D]
Rise (in)= 12.00 7.00 0.00 0.00
Span (in)= 12.00 7.00 0.00 0.00
No. Barrels = 1 1 0 0
Invert El. (ft)= 512.15 512.15 0.00 0.00
Length (ft)= 131.00 0.10 0.00 0.00
Slope (%)= 1.24 0.50 0.00 n/a
N-Value = .013 .013 .013 n/a
Orifice Coeff.= 0.60 0.60 0.60 0.60
Multi-Stage = n/a Yes No No
Crest Len (ft)= 0.00 0.00 0.00 0.00
Crest El. (ft)= 0.00 0.00 0.00 0.00
Weir Coeff.= 3.33 3.33 3.33 3.33
Weir Type = --- --- --- ---
Multi-Stage = No No No No
Exfil.(in/hr)= 0.000 (by Contour)
TW Elev. (ft)= 0.00
Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s).
0.00 0.50 1.00 1.50 2.00 2.50 3.00
Stage (ft)
0.00 512.15
1.00 513.15
2.00 514.15
3.00 515.15
4.00 516.15
Elev (ft)
Discharge (cfs)
Stage / Discharge
Total Q
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 07 / 26 / 2022
Hyd. No. 4
Whataburger Existing
Hydrograph type = SCS Runoff Peak discharge = 2.381 cfs
Storm frequency = 25 yrs Time to peak = 150 min
Time interval = 2 min Hyd. volume = 10,105 cuft
Drainage area = 1.070 ac Curve number = 77
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 10.00 min
Total precip. = 4.88 in Distribution = SCS 6-Hr
Storm duration = 6.00 hrs Shape factor = 484
0 60 120 180 240 300 360 420
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (min)
Whataburger Existing
Hyd. No. 4 -- 25 Year
Hyd No. 4
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 07 / 26 / 2022
Hyd. No. 5
Whataburger Proposed
Hydrograph type = SCS Runoff Peak discharge = 3.654 cfs
Storm frequency = 25 yrs Time to peak = 144 min
Time interval = 2 min Hyd. volume = 15,417 cuft
Drainage area = 1.070 ac Curve number = 94.4
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 5.00 min
Total precip. = 4.88 in Distribution = SCS 6-Hr
Storm duration = 6.00 hrs Shape factor = 484
0 60 120 180 240 300 360 420
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
Q (cfs)
Time (min)
Whataburger Proposed
Hyd. No. 5 -- 25 Year
Hyd No. 5
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 07 / 26 / 2022
Hyd. No. 7
Total To WB Det
Hydrograph type = Combine Peak discharge = 5.420 cfs
Storm frequency = 25 yrs Time to peak = 144 min
Time interval = 2 min Hyd. volume = 27,914 cuft
Inflow hyds. = 2, 5 Contrib. drain. area = 1.070 ac
0 60 120 180 240 300 360 420
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
5.00 5.00
6.00 6.00
Q (cfs)
Time (min)
Total To WB Det
Hyd. No. 7 -- 25 Year
Hyd No. 7 Hyd No. 2 Hyd No. 5
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 07 / 26 / 2022
Hyd. No. 8
Whataburger Outlet
Hydrograph type = Reservoir Peak discharge = 4.340 cfs
Storm frequency = 25 yrs Time to peak = 154 min
Time interval = 2 min Hyd. volume = 27,911 cuft
Inflow hyd. No. = 7 - Total To WB Det Max. Elevation = 512.03 ft
Reservoir name = Whataburger Det Max. Storage = 3,197 cuft
Storage Indication method used.
0 60 120 180 240 300 360 420
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
5.00 5.00
6.00 6.00
Q (cfs)
Time (min)
Whataburger Outlet
Hyd. No. 8 -- 25 Year
Hyd No. 8 Hyd No. 7 Total storage used = 3,197 cuft
Pond Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 07 / 26 / 2022
Pond No. 2 - Whataburger Det
Pond Data
UG Chambers -Invert elev. = 508.85 ft, Rise x Span = 3.00 x 3.00 ft, Barrel Len = 140.00 ft, No. Barrels = 2, Slope = 0.10%, Headers = Yes
Encasement -Invert elev. = 508.35 ft, Width = 4.50 ft, Height = 4.00 ft, Voids = 40.00%
Stage / Storage Table
Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft)
0.00 508.35 n/a 0 0
0.41 508.76 n/a 185 185
0.83 509.18 n/a 275 460
1.24 509.59 n/a 381 841
1.66 510.01 n/a 423 1,264
2.07 510.42 n/a 441 1,705
2.48 510.83 n/a 441 2,146
2.90 511.25 n/a 423 2,570
3.31 511.66 n/a 381 2,950
3.73 512.08 n/a 275 3,226
4.14 512.49 n/a 222 3,448
Culvert / Orifice Structures Weir Structures
[A] [B] [C] [PrfRsr] [A] [B] [C] [D]
Rise (in)= 12.00 11.00 0.00 0.00
Span (in)= 12.00 11.00 0.00 0.00
No. Barrels = 1 1 0 0
Invert El. (ft)= 508.35 508.35 0.00 0.00
Length (ft)= 36.00 0.10 0.00 0.00
Slope (%)= 2.56 0.50 0.00 n/a
N-Value = .013 .013 .013 n/a
Orifice Coeff.= 0.60 0.60 0.60 0.60
Multi-Stage = n/a Yes No No
Crest Len (ft)= 0.00 0.00 0.00 0.00
Crest El. (ft)= 0.00 0.00 0.00 0.00
Weir Coeff.= 3.33 3.33 3.33 3.33
Weir Type = --- --- --- ---
Multi-Stage = No No No No
Exfil.(in/hr)= 0.000 (by Wet area)
TW Elev. (ft)= 0.00
Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s).
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00
Stage (ft)
0.00 508.35
1.00 509.35
2.00 510.35
3.00 511.35
4.00 512.35
5.00 513.35
Elev (ft)
Discharge (cfs)
Stage / Discharge
Total Q
Hydraflow Rainfall Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 07 / 26 / 2022
Return Intensity-Duration-Frequency Equation Coefficients (FHA)
Period
(Yrs)B D E (N/A)
1 0.0000 0.0000 0.0000 --------
2 0.0000 0.0000 0.0000 --------
3 0.0000 0.0000 0.0000 --------
5 0.0000 0.0000 0.0000 --------
10 258.0115 37.2000 0.9963 --------
25 56.6689 11.2000 0.6812 --------
50 0.0000 0.0000 0.0000 --------
100 54.7483 10.0000 0.6279 --------
File name: Little Rock IDF.IDF
Intensity = B / (Tc + D)^E
Return Intensity Values (in/hr)
Period
(Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60
1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10 6.20 5.55 5.02 4.58 4.21 3.90 3.63 3.40 3.19 3.01 2.85 2.70
25 8.50 7.08 6.13 5.44 4.91 4.50 4.16 3.88 3.64 3.44 3.26 3.10
50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
100 10.00 8.34 7.25 6.47 5.87 5.40 5.02 4.69 4.42 4.19 3.98 3.80
Tc = time in minutes. Values may exceed 60.
Rainfall Precipitation Table (in)
Precip. file name: H:\2022\W220195\Engineering\design\drainage\pond modeling\Little Rock AR.pcp
Storm
Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr
SCS 24-hour 0.00 0.00 0.00 0.00 6.12 7.40 8.45 9.57
SCS 6-Hr 0.00 0.00 0.00 0.00 4.14 4.88 5.46 6.07
Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PIPE SIZING
CALCULATIONS
Project:
Date:
Job No:
Prepared By:SSR
BASIN:200
Area (SF) Area (Ac.) C - 10yr C - 25yr C - 100yr
10865 0.25 0.90 0.92 0.95
0 0.00 0.90 0.92 0.95
1744 0.04 0.22 0.28 0.35
TOTAL =12609 0.29 0.81 0.83 0.87
BASIN:202
Area (SF) Area (Ac.) C - 10yr C - 25yr C - 100yr
14593 0.34 0.90 0.92 0.95
425 0.01 0.90 0.92 0.95
6688 0.15 0.22 0.28 0.35
TOTAL =21706 0.50 0.69 0.72 0.77
BASIN:300
Area (SF) Area (Ac.) C - 10yr C - 25yr C - 100yr
6773 0.16 0.90 0.92 0.95
4514 0.10 0.90 0.92 0.95
903 0.02 0.22 0.28 0.35
TOTAL =12190 0.28 0.85 0.87 0.91
Impervious, Pavement
Impervious, Roof
Cover type
Impervious, Pavement
Impervious, Roof
Pervious, Grass
Whataburger - Little Rock
July 25, 2022
W220196
Cover type
Proposed Sub-Basin "C" Calculations
Cover type
Impervious, Pavement
Impervious, Roof
Pervious, Grass
Pervious, Grass
TRENCH DRAIN
UNDERGROUND DETENTION
STR 103 - OUTLET CONTROL
STR 202 - CATCH BASIN
STR 200 - CATCH BASIN
STR 300 - CATCH BASIN
STR 102 - MANHOLE
STR 100 - END SECTION
25-YEAR STORM
100-YEAR STORM
RAINFALL AND
SOIL DATA
Hydrologic Soil Group—Pulaski County, Arkansas
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
6/16/2022
Page 1 of 438465503846570384659038466103846630384665038466703846550384657038465903846610384663038466503846670549940549960549980550000550020550040550060550080550100550120550140
549940 549960 549980 550000 550020 550040 550060 550080 550100 550120 550140
34° 45' 39'' N 92° 27' 15'' W34° 45' 39'' N92° 27' 7'' W34° 45' 35'' N
92° 27' 15'' W34° 45' 35'' N
92° 27' 7'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 15N WGS84
0 45 90 180 270
Feet
0 10 20 40 60
Meters
Map Scale: 1:967 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:20,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Pulaski County, Arkansas
Survey Area Data: Version 18, Sep 13, 2021
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Jul 14, 2018—Aug 1,
2018
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Hydrologic Soil Group—Pulaski County, Arkansas
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
6/16/2022
Page 2 of 4
Hydrologic Soil Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
CbC Carnasaw-Urban land
complex, 3 to 8
percent slopes
C 1.5 58.0%
CMC Carnasaw-Mountainburg
association,
undulating
C 0.6 21.6%
CMF Carnasaw-Mountainburg
association, steep
C 0.5 20.4%
Totals for Area of Interest 2.7 100.0%
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are
assigned to one of four groups according to the rate of water infiltration when the
soils are not protected by vegetation, are thoroughly wet, and receive
precipitation from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when
thoroughly wet. These consist mainly of deep, well drained to excessively
drained sands or gravelly sands. These soils have a high rate of water
transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These
consist chiefly of moderately deep or deep, moderately well drained or well
drained soils that have moderately fine texture to moderately coarse texture.
These soils have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture or fine texture. These soils have a slow rate of
water transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when
thoroughly wet. These consist chiefly of clays that have a high shrink-swell
potential, soils that have a high water table, soils that have a claypan or clay
layer at or near the surface, and soils that are shallow over nearly impervious
material. These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is
for drained areas and the second is for undrained areas. Only the soils that in
their natural condition are in group D are assigned to dual classes.
Hydrologic Soil Group—Pulaski County, Arkansas
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
6/16/2022
Page 3 of 4
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Hydrologic Soil Group—Pulaski County, Arkansas
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
6/16/2022
Page 4 of 4
EXHIBITS
FIGURE 1.1
WEIHE weihe.net
Indianapolis, Indiana 46280
10505 N. College Avenue
317 | 846 - 6611E N G I N E E R S
W
S
N
E
LOCATION MAPWHATABURGER
06-27-2022
NOT TO SCALE
- PROJECT LOCATIONCHENAL PKWYKIRK RDRAHLING RDWELLINGTON HILLS RD
FIRMette MAP
FIGURE 1.2
WEIHE weihe.net
Indianapolis, Indiana 46280
10505 N. College Avenue
317 | 846 - 6611E N G I N E E R S 06-27-2022
WHATABURGER
EXISTING DRAINAGE AREA
FIGURE 2.1
WEIHE weihe.net
Indianapolis, Indiana 46280
10505 N. College Avenue
317 | 846 - 6611E N G I N E E R S
W
S
N
E
07-26-2022
WHATABURGER
SITE BOUDNARY
1.36 ACRES
CN=78.5
PICKUP HERE
ORDER
F
6"
1 1/2"
PROPOSED DRAINAGE AREA
FIGURE 2.2
WEIHE weihe.net
Indianapolis, Indiana 46280
10505 N. College Avenue
317 | 846 - 6611E N G I N E E R S
W
S
N
E
CONTROLLED DRAINAGE AREA
1.07 ACRES
CN=93.8
PROPOSED TACO BELL
DEVELOPMENT
06-27-2022
WHATABURGER
WHATABURGER BUILDING
FFE = 517.00
PICKUP HERE
ORDER
F
6"
1 1/2"
PROPOSED DRAINAGE SUB-BASINS
FIGURE 2.3
WEIHE weihe.net
Indianapolis, Indiana 46280
10505 N. College Avenue
317 | 846 - 6611E N G I N E E R S
W
S
N
E
07-26-2022
WHATABURGER
SUB-BASIN 202
0.50 AC
C = 0.72SUB-BASIN 300
0.28 AC
C = 0.87
SUB-BASIN 200
0.29AC
C = 0.83
WHATABURGER BUILDING
FFE = 517.00
F
6"
1 1/2"
FIGURE 2.4
WEIHE weihe.net
Indianapolis, Indiana 46280
10505 N. College Avenue
317 | 846 - 6611E N G I N E E R S
W
S
N
EWHATABURGER
DETENTION OVERFLOW
ELEVATION = 512.77
WHATABURGER BUILDING
FFE = 517.00
DIRECTION ARROWS FOR
DETENTION OVER FLOW ROUTING PROPOSED FLOOD ROUTING
(100-YR STORM EVENT)
07-26-2022
FIGURE 3.1
WEIHE weihe.net
Indianapolis, Indiana 46280
10505 N. College Avenue
317 | 846 - 6611E N G I N E E R S
DETAIL
NO SCALE
CASTING FRAME & COVER AS SPECIFIED (NEENAH R-1772)
RIM ELEV = 514.30 (MATCH PROPOSED GRADE)
STANDARD PRECAST MANHOLE CAP
16"
TOP OF RISER
ELEV = 512.10
12" OUTLET PIPE
INV = 508.35
12" X 12" X 12" TEE
STANDARD 48"
MANHOLE STRUCTURE
FULL HEIGHT MANHOLE
STEPS AS REQUIRED
12" INLET PIPE
INV = 508.85
BASE SET ON 6" OF #8 STONE
6"
24"
3"MIN.
11" ORIFICE
INV = 508.35
12" CAP
STR 103 - OUTLET CONTROL
SUPPORT RISER PIPE AS NEEDED
6" UNDERDRAIN
INV = 508.35
6" MIN
WHATABURGER
06-27-2022