HomeMy WebLinkAboutS-1471-C 082422 ITEM NO.: 2 FILE NO.: S-1471-C NAME: Lots 3-6, Chenal/Kanis Addition – Preliminary Plat LOCATION: 17100 Block of Chenal Parkway DEVELOPER: K-Mac Enterprises, Incorporated P.O. Box 6538 Fort Smith, AR 72906 OWNER/AUTHORIZED AGENT: Brian Dale (Agent) Joe White & Associates 25 Rahling Circle Little Rock, AR 72223 SURVEYOR/ENGINEER: Joe White & Associates 25 Rahling Circle Little Rock, AR 72223 AREA: 7.932 acres NUMBER OF LOTS: 4 FT. NEW STREET: 0 LF WARD: 5 PLANNING DISTRICT: 19 CENSUS TRACT: 42.16 CURRENT ZONING: C-3 VARIANCE/WAIVERS: Driveway location along Chenal Pkwy. Advance grading with infrastructure. ______________________________________________________________________ BACKGROUND On May 23, 2014, a final plat was approved and recorded for Lots 1 and 2, Chenal/Kanis Addition. Lots 1 and 2 are located immediately south of the subject property and have been developed. Lot 1 contains a carwash and Lot 2 contains a strip center. A. PROPOSAL/REQUEST/APPLICANT’S STATEMENT: The applicant is proposing to continue developing the Chenal/Kanis Subdivision by proposing a preliminary plat for Lots 3-6, Chenal/Kanis Addition. The subdivision will be completed in one (1) phase. The property is zoned C-3. B. EXISTING CONDITIONS: The site is undeveloped and wooded. There is existing cross access from Lots 1 and 2 from the south which will serve the proposed development. Existing utility easements run in an east/west direction between the existing development and the proposed site and north/south through Lot 3. Office and commercial uses and zoning border the site in all directions. The western third of the proposed site lies within the Chenal/Financial Center Overlay District. C. NEIGHBORHOOD NOTIFICATIONS: All owners of property within 200 feet of the site and all neighborhood associations registered with the City of Little Rock were notified of the public hearing. D. ENGINEERING COMMENTS: A drainage study showing all hydrologic and hydraulic calculations for the proposed storm sewer pipe system, detention ponds and structures, and inlets is required. For final drainage report, sign, date, and seal the report per AR State Board of Professional Engineers and Professional Surveyors rules Article 12, Section B (1) (a). Provide engineer's certification statement saying this drainage report was conducted by yourself or directly under your supervision and attesting to the accuracy of the information within this report. Chenal Parkway is classified as a principal arterial per City’s Master Street Plan. Therefore, dedicate additional right of way required to accommodate a minimum five (5) feet wide sidewalk plus a minimum one-foot buffer from the back of sidewalk to the right of way/property line. Per City Code 31-89 (5) for a preliminary plat, a storm drainage preliminary analysis is required showing drainage data for all watercourses entering and leaving the plat boundaries. The storm drainage analysis shall be prepared in sufficient detail to illustrate the proposed system’s capability of accommodating storm events as required by the stormwater management and drainage manual. The preliminary plat shall also show drainage arrows indicating how drainage arrives at the site and drainage arrows how it leaves the site post development. Indicate where the storm sewer pipes are located within the development also. Additionally, provide profile and cross-sectional views of the detention structure outlet/spillway. Delineation of the drainage areas pre and post construction with respective discharges via rational method shall also be shown. The preliminary plat shall also contain all information as outlined in City Code 31-89. A drainage study showing all hydrologic and hydraulic calculations for the proposed storm sewer pipe system, detention ponds and underground structures, and inlets is required. For final drainage report, sign, date, and seal the report per AR State Board of Professional Engineers and Professional Surveyors rules Article 12, Section B (1) (a). Provide engineer's certification statement saying this drainage report was conducted by yourself or directly under your supervision and attesting to the accuracy of the information within this report. E. UTILITIES/FIRE DEPARTMENT/PARKS/COUNTY PLANNING: Little Rock Water Reclamation Authority: No comments received. Entergy: No comments received. Summit Energy: No comments. AT & T: No comments received. Central Arkansas Water: No comments received. Fire Department: Maintain Access: Fire Hydrants. Maintain fire apparatus access roads at fire hydrant locations as per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.1 Access road width with a hydrant. Where a fire hydrant is located on a fire apparatus access road, the minimum road width shall be 26 feet, exclusive of shoulders. Grade Maintain fire apparatus access roads as per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.2 Grade. Fire apparatus access roads shall not exceed 10 percent in grade except as approved by the fire chief. If the grade exceeds 10 percent, approval will be denied and the applicant must submit request to be reviewed by Fire Chief for Approval. Loading Maintain fire apparatus access road design as per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and loading. Facilities, buildings or portions of buildings hereafter constructed shall be accessible to fire department apparatus by way of an approved fire apparatus access road with an asphalt, concrete or other approved driving surface capable of supporting the imposed load of fire apparatus weighing at least 75,000 pounds. One- or Two-Family Residential Developments. As per Appendix D, Section D107.1 of the Arkansas Fire Prevention Code Vol. 1, One- or Two-Family dwelling residential developments. Developments of one- or two-family dwellings where the number of dwelling units exceeds 30 shall be provided with two separate and approved fire apparatus access roads, and shall meet the requirements of Section D104.3. Exceptions: Where there are more than 30 dwelling units on a single public or private fire apparatus access road and al dwelling units are equipped throughout with an approved automatic sprinkler system in accordance with Section 903.3.1.1, 903.3.1.2 or 903.3.1.3 of the Arkansas Fire Code, access from two directions shall not be required. The number of dwelling units on a single fire apparatus access road shall not be increased unless fire apparatus access roads will connect with future development, as determined by the fire code official. Fire Hydrants Locate Fire Hydrants as per Appendix C of the 2012 Arkansas Fire Prevention Code. Section C101 – C105, in conjunction with Central Arkansas Water (Daniel Tull 501-377-1245) and the Little Rock Fire Marshal’s Office (Capt. Tony Rhodes 501-918-3757, or Fire Marshal Derek N Ingram 501-918-3756 Number and Distribution of Fire Hydrants as per Table C105.1. Parks and Recreation: No comments received. County Planning: No comments received. F. BUILDING CODES/LANDSCAPE: Building Code: No comments received. Landscape: No comments. G. TRANSPORTATION/PLANNING: No comments received. Rock Region Metro: No comments received. Planning Division: No comments. H. ANALYSIS: On May 23, 2014, a final plat was approved and recorded for Lots 1 and 2, Chenal /Kanis Addition. Lots 1 and 2 are located immediately south of the subject property and have been developed. Lot 1 contains a carwash and Lot 2 contains a strip center. The applicant is proposing to continue developing the Chenal/Kanis Subdivision by proposing a preliminary plat for Lots 3-6, Chenal/Kanis Addition. The subdivision will be completed in one (1) phase. The property is zoned C-3. The proposed site is undeveloped and wooded. There is existing cross access from Lots 1 and 2 from the south which will serve the proposed development to the north. Existing utility easements run in an east/west direction between the existing development and the proposed site and north/south through Lot 3. Office and commercial uses and zoning border the site in all directions. The proposed site, Lots 3 and 4, lie within the Chenal/Financial Center Overlay District. The applicant proposes to subdivide the overall 7.932 acres into four (4) lots as follows: Lot 3 – 1.355 acres Lot 4 – 1.201 acres Lot 5 – 2.464 acres Lot 6 – 2.912 acres Section 31-210(e) of the City’s Subdivision Ordinance requires that driveways along this section of Chenal Parkway be set back at least one-hundred fifty feet (150) from side property lines. The applicant is proposing a shared driveway between the proposed Lots 3 and 4. The driveway will be a right in/right out drive, and will be located approximately one-hundred thirty (130) feet back from the north side property line of Lot 4 and approximately one-hundred fifty (150) feet from the south side property line of Lot 3. Staff supports the requested driveway setback variance, as it is very minor in nature. The applicant is also requesting a variance from the Land Alteration Requirements in order to advance grade the property when the infrastructure is developed. Staff supports the variance to advance grade the site, as it is currently zoned C-3 and ready to be developed. Staff is supportive of the requested preliminary plat for the continuation of the Chenal/Kanis Addition. Staff views the request as reasonable. Staff also supports the requested variances. The proposed lots will not be out of character in size with other commercially zoned lots in this immediate area. Staff feels the proposed four (4) lots of this development will have no adverse impact on the surrounding properties. STAFF RECOMMENDATION: Staff recommends approval of the requested preliminary plat, subject to compliance with the comments and conditions outlined in paragraphs D and E, and the staff analysis, of the agenda staff report.