PROJECT DESCRIPTION
The proposed development is a luxury single family project in Little Rock, AR. Total development site
area is 4.97 acres.
DRAINAGE ANALYSIS
On Site Drainage- Rational method was used to determine the existing and proposed flows from
proposed site. Detailed drainage calculations considering the future expected development has been
conducted to determine the required detention pond and culvert dimensions. Summary of the calculations
are below:
Detention Pond
• Pond is situated on the north side of the property.
• Pre-development area : 5.02 acres.
• Post-development area : 5.02 acres.
• Pre-development runoff coefficient : 0.44.
• Post-development runoff coefficient : 0.65.
• Pond has a bottom area of 2000 SF with bottom elevation of 417.00’.
• Pond is 4 ft deep and two 12'' RCP have been proposed for outflow structures.
Peak flows for Pre and post development phase of onsite area have been tabulated below-
Pre-development
Post-dev. Without
detention Post-dev. With detention
Peak Flow (cfs) Peak Flow (cfs) Peak Flow (cfs)
2-Year 7.74 13.14 7.10
5-Year 8.53 14.54 7.64
10-Year 10.2 17.06 8.50
25-Year 11.74 19.56 9.64
CONCLUSION
From the onsite drainage calculation, it is seen that there is decrease in flow for all storm events due to the
proposed detention pond.
CERTIFICATION
I, William McFadden, Registered Professional Engineer No. 14048 in the State of Arkansas,
hereby certify the drainage designs, and specifications contained in this report have been pre-
pared in accordance with the regulations of the City of Little Rock, Arkansas, the Professional
Engineers Registration Act of the State of Arkansas, and reflect the application of generally ac-
cepted standard of engineering practice. I further certify that the improvements outlined in this
report will not have any adverse effects to life or downstream properties. I understand that re-
view of these plans is limited to general compliance with the City codes and regulations and does
not warrant the engineer’s design or imply and liability to the City of Little Rock for designs
contained herein.
____________________________________
William McFadden, P.E. CFM
Multi-Hydrograph Plot
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020
Hyd. No. 1
Pre development Area-1
Hydrograph type = Rational
Peak discharge = 7.736 cfs
Time to peak = 20 min
Hyd. Volume = 9,283 cuft
Hyd. No. 3
Post Dev with Pond
Hydrograph type = Reservoir
Peak discharge = 7.10 cfs
Time to peak = 22 min
Hyd. Volume = 11,813 cuft
0 5 10 15 20 25 30 35 40
Q (cfs)
0.00 0.00
2.00 2.00
4.00 4.00
6.00 6.00
8.00 8.00
Q (cfs)
Time (min)
Pre development Area-1 and Post Dev with Pond
2-yr frequency
Hyd No. 1 Hyd No. 3
Multi-Hydrograph Plot
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020
Hyd. No. 1
Pre development Area-1
Hydrograph type = Rational
Peak discharge = 8.532 cfs
Time to peak = 20 min
Hyd. Volume = 10,238 cuft
Hyd. No. 3
Post Dev with Pond
Hydrograph type = Reservoir
Peak discharge = 7.63 cfs
Time to peak = 22 min
Hyd. Volume = 13,068 cuft
0 5 10 15 20 25 30 35 40
Q (cfs)
0.00 0.00
2.00 2.00
4.00 4.00
6.00 6.00
8.00 8.00
10.00 10.00
Q (cfs)
Time (min)
Pre development Area-1 and Post Dev with Pond
5-yr frequency
Hyd No. 1 Hyd No. 3
Multi-Hydrograph Plot
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020
Hyd. No. 1
Pre development Area-1
Hydrograph type = Rational
Peak discharge = 10.21 cfs
Time to peak = 20 min
Hyd. Volume = 12,248 cuft
Hyd. No. 3
Post Dev with Pond
Hydrograph type = Reservoir
Peak discharge = 8.50 cfs
Time to peak = 23 min
Hyd. Volume = 15,342 cuft
0 5 10 15 20 25 30 35 40
Q (cfs)
0.00 0.00
2.00 2.00
4.00 4.00
6.00 6.00
8.00 8.00
10.00 10.00
12.00 12.00
Q (cfs)
Time (min)
Pre development Area-1 and Post Dev with Pond
10-yr frequency
Hyd No. 1 Hyd No. 3
Multi-Hydrograph Plot
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020
Hyd. No. 1
Pre development Area-1
Hydrograph type = Rational
Peak discharge = 11.74 cfs
Time to peak = 20 min
Hyd. Volume = 14,092 cuft
Hyd. No. 3
Post Dev with Pond
Hydrograph type = Reservoir
Peak discharge = 9.64 cfs
Time to peak = 23 min
Hyd. Volume = 17,587 cuft
0 5 10 15 20 25 30 35 40
Q (cfs)
0.00 0.00
2.00 2.00
4.00 4.00
6.00 6.00
8.00 8.00
10.00 10.00
12.00 12.00
Q (cfs)
Time (min)
Pre development Area-1 and Post Dev with Pond
25-yr frequency
Hyd No. 1 Hyd No. 3