Loading...
HomeMy WebLinkAboutResponse to Comments 070622 11912 KANIS ROAD, SUITE F-8 LITTLE ROCK, ARKANSAS 72211 501-376-3676 FAX 376-3766 design, planning and interiors July 5, 2022 Mr. Torrence Thrower Development Specialist Department of Planning & Development City of Little Rock 723 W. Markham Little Rock, AR 72201 Re: PUD – Newcap Development 12110 Stagecoach Road Little Rock, Arkansas Application File # Z-8235-D Dear Mr. Thrower: Following is our response to your planning comments (by email dated 6.28.22) on the above referenced project: Development Comments: 1. The Senior Housing Complex will be limited to occupants 55 years and older. 2. The correct count for the commercial lots is 8. 3. Dimensions have been added to the attached revised drawings. 4. Building heights have been added to the attached revised drawings. 5. Information on exterior building materials have been added to the revised drawings. 6. Dumpsters are located on the attached revised drawings. 7. Signage will comply with Section 36-555 of the Little Rock Subdivision & Zoning Ordinance. 8. It is noted on the revised drawings that all site lighting will be low-level and directed away for adjacent properties. 9. Concur. Parking shown on the site plan is sufficient for the proposed uses. 10. It is noted on the revised drawings that property located in the floodway will be zoned “FP” Floodplain District. Continued on next page Civil Engineering Comments: 1. The final construction drawings will provide FFE for all buildings as required. 2. The proposed access street and cul-de-sac from Stagecoach Road will be constructed as a dedicated public street meeting all construction requirements, ROW’s and required utility easements. 3. Flood plain boundaries and flood zones are shown on preliminary plat and plans. 4. Concur. A grading permit will be obtained prior to initiation of work. 5. Concur. A State of Arkansas NPDES permit will be obtained prior to initiation of work. 6. Concur. Approval will be obtained for hauling of fill material on or off project site. 7. Damage to public/private property will be repaired by responsible party prior to issuance of Certificate of Occupancy. 8. As-built plans and data entry template of newly installed or modified public/private stormwater drainage system will be provided prior to Certificate of Occupancy. 9. A maintenance bond will be provided as required. 10. A drainage study will be provided as required. 11. Traffic Control permits will be acquired as required. 12. Stormwater detention will be provided. 13. SEC plans will be provided as required. 14. SEC plans will show information as outlined in ADEQ Permit requirements. 15. Accessible entry route from the public ROW will be provided as required. 16. Per item 12, stormwater detention will be provided. 17. A Special Flood Hazard Development Permit will be obtained as required. 18. Elevation Certificates of FFE’s will be provided as required. 19. Access driveway permits will be obtained from ARDOT as required. 20. Permits will be obtained as required for work in the ARDOT right-of-way. We appreciate your consideration on this review. If there are any questions or additional information is needed, please call. We can also be reached by email at tbadesignplanning@sbcglobal.net. Yours very truly, Terry G. Burruss, AIA