Loading...
HomeMy WebLinkAboutHDC2011-029 CORRESPONDENCEElevation of Building 100 at Fowler Page 1 of 1 Minyard, Brian From: Tim Heiple [tim@hwarch.com] Sent: Friday, August 05, 2011 12:43 PM To: Minyard, Brian Subject: Elevation of Building 100 at Fowler See attached. Tim 8/5/2011 149 mom o MME PR M 0 r; - n OOOOOOOIGOOO e g z z i z a rt i Fn s o �P_asao o o Fp nD o Z E h Or Z s s m � n ask Fowler Square Little Rock, Arkansas _ s i s 5 z, 9 - 00 a m Minyard, Brian From: Minyard, Brian Sent: Friday, August 05, 2011 3:54 PM To: Tim Heiple (E-mail) Subject: COC fowler sq bldg 100 R� COC for posting 080511 bldg 10... please tell me again who is the entity that owns the property. Let me know if this is correct and I will send you an original. The building signs are not to be included in this COC, even though they are stated on the sheet you sent me. Please take this off the sheet, if this is your submittal for the COC. How many psi are you planning on using on the power washing of the brick. Mortar should not be damaged while doing this. This needs supervision by you or someone you trust. Brian Minyard, AICP bminyard@littlerock.org (501) 371-4789 fax (501) 399-3435 Please consider the environment before printing this e-mail. 'r LITTLE ROCK HISTORIC DISTRICT =,, COMMISSION f� e,O Property Owner: Address of Property: DEPARTMENT OF PLANNING AND DEVELOPMENT Fowler Square 503 East 6th Street 723 West Markham Street Little Rock, Arkansas 72201-1334 Phone: (501) 371-4790 Fax: (501) 399-3435 HDC 11-020 Project Description with Conditions listed: 1) Soffit, Fascia, Trim Boards, Siding, and Window Shutter Repair a) Remove damaged trim boards and siding pieces and replace with boards of same dimension, shape, and profile. b) Repair window shutters using same techniques, materials of same dimension, shape, profile, and materials as original. c) Caulk, prime, and paint. 2) Prep and paint gutters and downspouts. a) Repair as required. b) If replacement parts are used, replace with same size, shape, and materials as original. 3) Painting a) Scrape, prime, and paint all wood surfaces on building. b) DO NOT paint any brick or concrete surface. 4) Metal Rail and Stairs a) Scrape, sand, and remove all rust from stairs and handrails. b) If replacing sections of metal, use metal of same dimension, shape, profile, and materials as original. c) Prime and paint. Staff Signature The original is printed on pale orange paper. Date