Loading...
HomeMy WebLinkAboutPW Agenda Comments Public Works Review Comments Board of Adjustment Planning Commission Agenda Date: 9/24/2020 Z File Number LA-0088 15122 Cantrell Road Advanced Grading Variance NEC Cantrell Rd and Rummel Road 1 A grading permit in accordance with section 29-186 (c) & (d) will be required prior to any land clearing or grading activities at the site. Other than residential subdivisions, site grading and drainage plans must be submitted and approved prior to the start of construction. 2 Storm water detention ordinance applies to this property. Show the proposed location for temporary stormwater detention facilities on the grading plan. 3 If disturbed area is 1 or more acres, obtain a NPDES storm water permit from the Arkansas Department of Environmental Quality prior to the start of construction. 4 Damage to public and private property due to hauling operations or operation of construction related equipment from a nearby construction site shall be repaired by the responsible party prior to issuance of a certificate of occupancy. 5 Per Sec. 29-197(2), the grading shall be expeditously completed in a time frame not to exceed one (1) year in duration from the time work commences to installation of all final erosion control measures and vegetation. 6 Provide visual screening of the completed area by providing undisturbed buffer strip of trees or earthen berms. Per Sec. 29-197(3) provide line of sight illustrations from adjacent street(s) and properties showing the constructed berm as an elevation to obstruct view of the advance graded area for review by the Planning Commission. 7 Per Sec. 29-197(11), a permanent vegetative cover of suitable perennial grass shall be established over all disturbed areas. Where indicated by soil tests, pH adjustments and addition of fertilizer may be required. 8 Per Sec. 29-197(12), all erosion and stabilization controls, including permanent vegetation and plantings and stormwater detention systems are to be maintained by the responsible part for a period of 2 years following completion of site grading. 9 Per Sec. 29-197(12), periodic mowing, generally 2 times per year or more often if required by CLR shall be provided to encourage perennial grass growth. 10 Per Sec. 29-197(13), maintenance for the 2 year period shall be guaranteed through posting of cash, surety bond or letter of credit as referenced in Sec. 31-431(2) at the time of final inspection of the grading activities. 11 Is the retaining wall proposed to be constructed with the advance grading? 12 Obtain a sign from Vince Floriani to post at the site viewable by the public. 13 The application fee of $65 is due for payment to CLR Public Works Dept. Deliver payment to Vince Floriani. Friday, August 28, 2020 Page 1 of 1