General Notes:
r A minimum of forty eight (48) hours prior to any excavation or grading, Contractor shall contact the State
One-Call system at 811to locate all underground utilities. The Contractor shall notify the Engineer of Record
immediately in the event that underground utilities are not shown on plan and / or conflict with proposed civil
works.
r The Engineer of record shall not be held responsible for survey inaccuracies, survey omissions, or for design errors
or omissions resulting from an inaccurate survey.
r Construction Contractor and his Subcontractors agree that in accordance with generally accepted construction
practices and OSHA safety standards, Construction Contractor and his Subcontractors will be required to assume
sole and complete responsibility for job site conditions during the course of construction of the project, including
safety of all persons and property; that this requirement shall be made to apply continuously and not limited to
normal working hours, and construction Contractor and his Subcontractors further agree to defend, indemnify and
hold Design Professional harmless from any and all liability, real or alleged, in connection with the performance of
work on this project, except liability arising from the sole negligence of design professional.
r It is the responsibility of the Contractor to maintain all erosion and sediment control devices through all phases of
construction. Erosion and sediment control devices may only be removed upon 70% stabilization of the site as
defined by the State's Department of Environmental Quality's General Permit for Construction.
r The Contractor is to be solely responsible for any damage to neighboring properties during construction of this
project.
r This project was designed in accordance with currently accepted industry design standards. The Engineer of
Record does not warrant any work completed on site unless direct inspection by the Engineer of Record & proper
testing by a state certified qualified inspection lab occurs during all phases of construction.
r The Contractor shall review the construction documents prior to any construction, and notify the Engineer of
Record immediately upon discovery of any discrepancies that may occur on the drawings. All work shall
discontinue until such time that the Engineer of Record has resolved said discrepancy.
r The Contractor shall be responsible for disposal of construction waste materials including but not limited to
demolition materials, debris, contaminated soils / materials, etc. in a lawful manner, at state and federally accepted
disposal sites.
r The Contractor is responsible for obtaining and constructing in accordance with the stricter of: these construction
documents and any associated details & specifications; and all municipalities / governing agencies' standards and
specifications for construction.
r This drawing set and associated site, grading, utility, etc. plans are representations of the construction design and
shall not be scaled to determine dimensions.
N.T.S.
VICINITY MAP
N.T.S.
VICINITY MAP
N.T.S.
Contact Information:
Typical Abbreviation List:
Abbrev. Description
Sheet Index
Sheet №Title Date
Abbrev. Description
SHEET NUMBER:
JOB NUMBER:
DRAWING NAME:
DRAWN BY:
21-8761 Sketch Grade 001.dwg
SEAL:
FIRM:
CERTIFICATE OF AUTHORIZATION:
DATE:
RCP Reinforced Concrete Pipe TC Top of Back of Curb (Spot Elevation)
CMP Corrugated Metal Pipe G Gutter / Bottom of Sidewalk (Spot Elevation)
HDPE High Density Polyethylene Pipe TW Top of Wall (Spot Elevation)
SLMP Smooth Line Metal Pipe BW Bottom of Wall at Grade (Spot Elevation)
PVC Polyvinyl Chloride Pipe HP High Point (Spot Elevation)
DI Ductile Iron Pipe LP Low Point (Spot Elevation)
J-Box Junction Box TB Top of Box (Spot Elevation)
FES Flared End Section BC Back of Curb
RW Retaining Wall FC Face of Curb
HW Head Wall FH Fire Hydrant Assembly
WW Wing Wall GV Gate Valve
AE Access Easement MJ Mechanical Joint
DE Drainage Easement N North
TCE Temporary Construction Easement E East
UE Utility Easement W West
BS Building Setback S South * Engineers Notice *The existence and location of any underground utility pipes or structures shown on thesedrawings are obtained by a search of the available records To the best of our knowledgethere are no existing utilities except as shown on these drawings and we assume noresponsibility as to the accuracy of their depicted location(s) on these drawings. TheContractor is required to take due precautionary measures to protect the utility linesshown, and all other lines not of record or not shown on these drawings by verificationof their location in the field prior to the initiation of the actual portion of the their work.* Document Ownership *This document, and the ideas and designs incorporated herein asand instrument of professional services, is the property of Blew &Associates, P.A. and is not to be used, in whole or part, forany other project without the written authorization ofBlew & Associates, P.A.BLE W & A SSOCIATES , PA
CIVIL ENGINEERS & LAND SURVEYORS
3825 NORTH SHILOH DRIVE
FAYETTEVILLE, ARKANSAS 72703
OFFICE: 479.443.4506
FAX: 479.582.1883
www.BLEWINC.comCERTIFICATE OF AUT
H
O
RI
ZATION BLEW &
ASSOCIATES, PA
BLEW &
ASSOCIATES, PA
BLEW &
ASSOCIATES, PA
Certificate of Authorization № 1534
No. 1534
A
R
K A N S A S
REVIEWED BY:Cover Sheet-2021-11-10
Dollar General of Little Rock (Fair Park)
1101 Fair Park Blvd.
Little Rock, AR 72204
Sketch Plans For:Dollar General of Little Rock (Fair Park)1101 Fair Park Blvd. Little Rock, AR 72204PB General Holdings, LLC5110 Talley RoadLittle Rock, AR 72204(501) 219-8899A. Pope
21-8761
C1
p:\21-8761 dg little rock (fair park)\civil drawings\21-8761 sketch grade 001.dwg - Plotted on 11/10/2021 10:33:15 AM @ a scale of 1:1 to autocad pdf (smallest file).pc3 by Catey AtchleySurvey Description
SKETCH PLANS For:
W. Cody Sexton
PART OF THE SOUTHWEST QUARTER OF THE SOUTHEAST QUARTER OF THE SOUTHEAST QUARTER OF
THE SOUTHWEST QUARTER OF SECTION 6, TOWNSHIP 1 NORTH, RANGE 12 WEST, LITTLE ROCK,
PULASKI COUNTY, ARKANSAS. BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: COMMENCING
AT A POINT THAT IS 20.00 FEET OF AND 174.70 FEET NORTH OF THE SOUTHWEST CORNER OF SAID
SOTUHWEST QUARTER OF THE SOUTHEAST QUARTER OF THE SOUTHEAST QUARTER OF THE
SOUTHWEST QUARTER OF SECTION 6, THENCE SOUTH 88 DEGREES 02 MINUTES 17 SECONDS EAST 14.84
FEET TO A POINT ON THE EAST RIGHT OF WAY LINE OF FAIR PARK BOULEVARD AND THE POINT OF
BEGINNING, THENCE ALONG SAID RIGHT OF WAY LINE NORTH 01 DEGREES 00 MINUTES 30 SECONDS
EAST 83.09 FEET, THENCE ALONG SAID RIGHT OF WAY LINE NORTH 43 DEGREES 42 MINUTES 28
SECONDS WEST 2.84 FEET, THENCE CONTINUING ALONG SAID RIGHT OF WAY LINE NORTH 01
DEGREES 00 MINUTES 30 SECONDS EAST 42.10 FEET, THENCE CONTINUING ALONG SAID RIGHT OF WAY
LINE NORTH 46 DEGREES 04 MINUTES 48 SECONDS EAST, 7.11 FEET, THENCE CONTINUING ALONG SAID
RIGHT OF WAY LINE NORTH 00 DEGREES 08 MINUTES 50 SECONDS WEST 2.03 FEET TO A POINT ON THE
SOUTHERLY RIGHT OF WAY LINE OF WEST 11TH STREET, THENCE ALONG SAID RIGHT OF WAY LINE
NORTH 81 DEGREES 27 MINUTES 06 SECONDS EAST 45.88 FEET, THENCE CONTINUING ALONG SAID
RIGHT OF WAY LINE NORTH 04 DEGREES 06 MINUTES 33 SECONDS EAST 3.61 FEET, THENCE
CONTINUING ALONG SAID RIGHT OF WAY LINE SOUTH 87 DEGREES 54 MINUTES 48 SECONDS EAST
254.47 FEET TO A POINT ON THE WEST RIGHT OF WAY LINE OF TYLER STREET, THENCE ALONG SAID
RIGHT OF WAY LINE SOUTH 02 DEGREES 05 MINUTES 12 SECONDS WEST, 145.71 FEET, THENCE NORTH 88
DEGREES 02 MINUTES 17 SECONDS WEST 300.16 FEET TO THE POINT OF BEGINNING.
CIVIL PLANS
C1 Cover Sheet 11/10/2021
C2 Demolition and Erosion Control Plan Ph 1 11/10/2021
C2-1 Erosion Control Plan Ph 2 11/10/2021
C3 Grading and Drainage Plan 11/10/2021
C4 Utility Plan 11/10/2021
ALTA SURVEY
1 Survey (by Blew & Associates, P.A.)09/16/2021
OWNER/DEVELOPER
PB General Holdings, LLC
5110 Talley Road
Little Rock, AR 72204
Ph: (501) 219-8899
LAND SURVEYOR:
Blew & Assoicates, PA
3825 N Shiloh Drive
Fayetteville, AR 72703
Ph: (479) 443-4506
Fax: (479) 58/2-1883
CIVIL ENGINEER
Blew & Associates, PA
5104 S Pinnalce Hills Pkwy, Ste 1-C
Rogers, AR 72758
Ph: (479) 443-4506
Fax: (479) 58/2-1883
ARCHITECT
Bartlett Architecture, Inc.
603 Highway 5 North
Benton, AR 72019
Ph: (501) 794-4448
Fax: (501) 794-4449
CITY OF LITTLE ROCK:
Planning Department
Jamie Collins, Director
723 West Markham Street
Little Rock, AR 72201
Ph: (501) 371-4790
gcollins@littlerock.gov
Civil Engineering/Division Manager
701 West MArkham Street
Little Rock, AR 72201
Ph: (501) 371-4811
Building Codes
Stephen Crain - Plans Examiner
723 West Markham Street
Little Rock, AR 72201
Ph: (501) 371-4875
Fire Department
Delphone D. Hubbard - Fire Chief
624 South Chester Street
Little Rock, AR 72201
Ph: (501) 918-3700
CENTRAL ARKANSAS WATER
221 E Capitol Ave
Little Rock, AR 72202
Ph: (501) 372-5161
LITTLE ROCK WATER RECLAMATION AUTHORITY
Vince Hotho
11 Clearwater Dr.
Little Rock, AR 72204
Ph: (501) 688-1452
WINDSTREAM TELECOMMUNICATIONS
4001 N Rodney Parham Rd.
Little Rock, AR 72212
Ph: (501) 404-7947
CENTERPOINT ENERGY
Megan Reynolds
Ph: (501) 404-7947
AT&T ARKANSAS
17000 Cantrell Rd, Room B-17
Little Rock, AR 72223
Ph: (501) 615-5823
ENTERGY ARKANSAS
John Jones
425 W Capital Ave #27
Little Rock, AR 72201
(800) 368-3749
NOT
F
O
R
CON
S
T
R
U
C
TI
O
N
FOR
R
E
VI
E
W
ONL
Y!!!
NOT
F
O
R
CON
S
T
R
U
C
TI
O
N
FOR
R
E
VI
E
W
ONL
Y!!!
6" SS 6" SS 6" SS S
Relocate Existing
Overhead Power Line
Relocate Existing
Electric Structures
as Necessary
Proposed Sanitary
Sewer Relocation
Demo/Relocate Sanitary
Structures as Necessary
4" SS 4" SS 4" SS
AREA
8.24'9.34'6.91'7.43'8.16'Proposed
Underground
Detention
Proposed Outlet
Connection for Site
Detention HP 376.3237
6
37
6
3753
7
3
376
376376370365380377377378
Retaining Wall
with Ribbon Curb
(Max Height: 3.5')6.9'3786.9'℄℄℄℄℄℄℄℄XXXX X X X X X X X
XOHEOHEOHEOHE OHEOHE OHE OHE OHE OHE OHEOHEOHE
OHEOHEOHEOHEOHEOHEGAS
GAS GAS GAS
T
T
WV
WV
SS SS
SS SS SS
SS SS SS SS SS
XXXXOHEOHEXX
OHE OHE OHE
OHE OHE OHE
WWWWWWWWWW W W W W W W W W W W W W W W W
3643
6
5
3
6
6
3
6
7
368
369
370
371
372
373
3
7
4
375
376
370
368
369
365
366
367
362363364
361362364363365366367368369370372373374375376
374
3
7
5 376377379
377378378
3
75
3
7
6
37
7
FL: 370.38
T47
T46
T26T25
T8 T4 T3
XW 11th Street
50' Public Right-of-Way - Asphalt Pavement
City Owned & Maintained
25 MPH
Fair Park BoulevardVariable Public Right-of-Way - Variable Asphalt PavementCity Owned & Maintained40 MPH6 RCP 6 VCP
8" DIP2" PVC 2" PVC
S Tyler StreetPublic Right-of-Way - Asphalt PavementCity Owned & MaintainedDMH #4
Rim Elevation: 367.97'
SMH #2
Rim Elevation: 362.87'
SMH #4
SMH #5
Rim Elevation: 376.85'
DMH #6
Rim Elevation: 360.90'
GI #2
Rim Elevation: 360.17'
SMH #1
Rim Elevation: 360.70'
SMH #3
Rim Elevation: 365.17'
DMH #5
Rim Elevation: 368.24'
GI #1
Rim Elevation: 369.40'
FO
S1
S5
16.6' Street Buffer
4.33'4.33'
6.9' Street Buffer
Proposed Detention will conform to the
City of Little Rock Drainage Requirements
& will release at a rate less than or equal
to pre-development rates.
Retaining Wall
(Max Height: 11.8')
Proposed
Sanitary Sewer
Manhole
Relocate Existing
Electric Structures
as NecessaryRelocate Existing 6" Line
16.6' Street Buffer
Retaining Wall with Ribbon Curb
(Max Height: 2.3')
SPACES4 SPACES8
SPACES9
SPACES5SPACES5PROPOSED
RETAIL STORE
BUILDING
70'-0" X 130'-0"
"E" PLAN
W/ VESTIBULE
(HVAC UNITS ON ROOF)
FFE: 376.82
45'36'SHEET NUMBER:
DRAWING NAME:
21-8761 Sketch 003.dwg
SEAL:
FIRM:
VICINITY MAP
N.T.S.
BLE W & A SSOCIATES , PA
CIVIL ENGINEERS & LAND SURVEYORS
3825 NORTH SHILOH DRIVE
FAYETTEVILLE, ARKANSAS 72703
OFFICE: 479.443.4506
FAX: 479.582.1883
www.BLEWINC.com
Certificate of Authorization № 1534
JOB NUMBER:
DRAWN BY:
DATE:
REVIEWED BY:Site, Grading and Drainage Sketch Plan-C1Sketch Plans For:p:\21-8761 dg little rock (fair park)\civil drawings\21-8761 sketch 003.dwg - Plotted on 11/8/2021 3:45:16 PM @ a scale of 1:1 to autocad pdf (smallest file).pc3 by Catey AtchleyDollar General of Little Rock (Fair Park)1101 Fair Park Blvd. Little Rock, AR 72204PB General Holdings, LLC5110 Talley RoadLittle Rock, AR 72204(501) 219-88992021-10-15
A. Pope
21-8761
W. Cody Sexton
Proposed Features:
Feature Description
Note:
*Only Symbols That Appear On This Sheet Are Shown In This Legend.
*See Survey For Existing Features Legend.
*See Cover Sheet For Abbreviation List.
Property Line
Onsite Property Line
Offsite Property Line
Right-Of-Way Line
Setback Line
Easement Line
Zoning Limits
Street / Drive Centerline
Thickened Edge Of Pavement
Edge Of Gravel
Firelane Striping
General Fence Line
Chain Link Fence Line
Board Fence Line
Parking Counter
Storm Pipe (See Grading Plan
Retaining Wall
See Utility Plan For Line Sizes
Water Line
Tee, Cross, Bends, Gate Vale
& Reducer
Fire Hydrant & Assembly
Water Meter - Single
Water Meter - Double
Sanitary Sewer Force Main
Sanitary Sewer Line
Sanitary Sewer Service
Sanitary Sewer Manhole
Gas Line
Overhead Electric Line
Underground Electric Line
Cable Television Line
Fiber Optic Line
Overhead Telephone Line
Underground Telephone Line
Utility Pole
Light Pole
Curb And Gutter
(See Site Plan For Size)
Asphalt Pavement (See Detail
Sheet For Pavement Sections)
Concrete Pavement (See Detail
Sheet For Pavement Sections)
Concrete Sidewalk
(See Site Plan For Dimensions)
Storm Catch Basin(s)
00 SPACES
AREA
GRATED
CURB INLET
GRATED
INLET
JUNCTION
BOX
AREA
INLET
CURB
INLET
OUTFALL
STRUCTURE
MW
MW
S
X"FM
X"SS
GAS
OHE
UGE
C-TV
FO
OHT
UGT
X"W
FIRELANE
X (See Plan For Type)
For Type and Size)
Know what's below.
Call before you dig.nwswsen
e
EN
WS( IN FEET )
GRAPHIC SCALE
20'0 10'20'40'80'
1 inch = 20 ft
SITEW. 11th St.Fair Park Blvd.S. Tyler St.CERTIFICA T E OF AUT
H
O
RI
ZATION BLEW &
ASSOCIATES, PA
BLEW &
ASSOCIATES, PA
BLEW &
ASSOCIATES, PA
No. 1534
A
RK A N S A S
r Dimensions are measured from the Face of Curb, the Edge of Pavement,
the Edge of Sidewalk the Face/Corner of the Building(s) or the
Center/End of Stripe.
r All radii shall be 4 foot at Face of Curb unless otherwise specified.
r Layout of Site Plan is based on and limited to survey information.
r All Curb & Gutter shall be 24" wide per detail sheet.
r All Pavement Marking shall be applied in accordance with the
requirements outlined in the most current edition of the "Manual on
Uniform Traffic Control Devices" (MUTCD).
r All Signs, Traffic Control Devices, etc. shall follow the guidelines of the
MUTCD.
r The Contractor shall refer to the Architectural drawings for Building
Floor plans and Dimensions, Wall Sections, Door Openings, Building
Utility Entrance Points, etc. The Contractor shall immediately notify
the Architect and Engineer in the event that the Civil Site Plans
Building Layout does not match the Architectural drawings.
r All handicap spaces shall be striped / marked in accordance with the
handicap striping detail.
r All pavement indicated shall be standard duty bituminous pavement
unless otherwise noted on plan. The pavement shall be constructed in
accordance with the pavement section detail.
r It is the Contractor's responsibility to calculate construction staking
coordinates according to the dimensions shown on these plans. The
Contractor shall verify the accuracy of the coordinates shown on the
plans and notify the Engineer of any irregularities before construction
starts.
r All ramps shall have detectable truncated dome panels per A.D.A. and
city standards and the detail sheet
Site General Notes:
Property Description
PART OF THE SOUTHWEST QUARTER OF THE SOUTHEAST QUARTER OF THE
SOUTHEAST QUARTER OF THE SOUTHWEST QUARTER OF SECTION 6, TOWNSHIP 1
NORTH, RANGE 12 WEST, LITTLE ROCK, PULASKI COUNTY, ARKANSAS. BEING
MORE PARTICULARLY DESCRIBED AS FOLLOWS: COMMENCING AT A POINT THAT
IS 20.00 FEET OF AND 174.70 FEET NORTH OF THE SOUTHWEST CORNER OF SAID
SOTUHWEST QUARTER OF THE SOUTHEAST QUARTER OF THE SOUTHEAST
QUARTER OF THE SOUTHWEST QUARTER OF SECTION 6, THENCE SOUTH 88
DEGREES 02 MINUTES 17 SECONDS EAST 14.84 FEET TO A POINT ON THE EAST
RIGHT OF WAY LINE OF FAIR PARK BOULEVARD AND THE POINT OF
BEGINNING, THENCE ALONG SAID RIGHT OF WAY LINE NORTH 01 DEGREES 00
MINUTES 30 SECONDS EAST 83.09 FEET, THENCE ALONG SAID RIGHT OF WAY
LINE NORTH 43 DEGREES 42 MINUTES 28 SECONDS WEST 2.84 FEET, THENCE
CONTINUING ALONG SAID RIGHT OF WAY LINE NORTH 01 DEGREES 00 MINUTES
30 SECONDS EAST 42.10 FEET, THENCE CONTINUING ALONG SAID RIGHT OF WAY
LINE NORTH 46 DEGREES 04 MINUTES 48 SECONDS EAST, 7.11 FEET, THENCE
CONTINUING ALONG SAID RIGHT OF WAY LINE NORTH 00 DEGREES 08 MINUTES
50 SECONDS WEST 2.03 FEET TO A POINT ON THE SOUTHERLY RIGHT OF WAY
LINE OF WEST 11TH STREET, THENCE ALONG SAID RIGHT OF WAY LINE NORTH
81 DEGREES 27 MINUTES 06 SECONDS EAST 45.88 FEET, THENCE CONTINUING
ALONG SAID RIGHT OF WAY LINE NORTH 04 DEGREES 06 MINUTES 33 SECONDS
EAST 3.61 FEET, THENCE CONTINUING ALONG SAID RIGHT OF WAY LINE SOUTH
87 DEGREES 54 MINUTES 48 SECONDS EAST 254.47 FEET TO A POINT ON THE WEST
RIGHT OF WAY LINE OF TYLER STREET, THENCE ALONG SAID RIGHT OF WAY
LINE SOUTH 02 DEGREES 05 MINUTES 12 SECONDS WEST, 145.71 FEET, THENCE
NORTH 88 DEGREES 02 MINUTES 17 SECONDS WEST 300.16 FEET TO THE POINT OF
BEGINNING.
Flood Statement
BY GRAPHIC PLOTTING ONLY, THIS PROPERTY IS IN ZONE "X" (OTHER AREAS -
UNSHADED) OF THE FLOOD INSURANCE RATE MAP, COMMUNITY PANEL NO.
05119C0452J, WHICH BEARS AN EFFECTIVE DATE OF 02/26/2021 AND IS NOT IN A
SPECIAL FLOOD HAZARD AREA
ZONE "X" (OTHER AREAS - UNSHADED) - AREAS DETERMINED TO BE OUTSIDE
THE 0.2% CHANCE ANNUAL FLOODPLAIN.
**FLOOD STATEMENT DOES NTO GUARANTEE AGAINST LOCALIZED
FLOODING.
City of Little Rock Notes
·CONTRACTOR CHALL BE RESPONSIBLE FOR CONTACTING THE CITY OF
LITTLE ROCK PUBLIC WORKS DEPARTMENT FOR INSPECTIONS OF ANY WORK
IN THE PUBLIC RIGHT OF WAY PRIOR TO PLACEMENT OF CONCRETE OR
ASPHALT OR FOR ON SITE CLARIFICATION OF REQUIREMENTS PRIOR TO
COMMENCING WORK. FAILURE TO DO SO CAN RESULT IN REMOVAL OF ANY
IMPROPERLY PLACED CONCRETE OR ASPHALT AT THE EXPENSE OF THE
OWNER OR CONTRACTOR.
·DAMAGE TO PUBLIC AND PRIVATE PROPERTY DUE TO HAULING OPERATIONS
OR OPERATIONS OF CONSTRUCTION RELATED EQUIPMENT FROM A
CONSTRUCTION SITE SHALL BE REPAIRED BY THE RESPONSIBLE PARTY PRIOR
TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
·OBTAIN PERMITS PRIOR TO DOING ANY STREET CUTS OR CURB CUTS. OBTAIN
BARRICADE PERMIT PRIOR TO DOING ANY WORK IN THE RIGHT OF WAY.
CONTACT TRAFFIC ENGINEERING AT (501) 379-1800 FOR MORE INFORMATION.
·HAULING OF FILL MATERIAL ON OR OFF SITE OVER MUNICIPAL STREETS AND
ROADS REQUIRES APPROVAL PRIOR TO A GRADING PERMIT BEING ISSUED.
CONTACT PUBLIC WORKS TRAFFIC ENGINEERING AT 621 S. BROADWAY, (501)
379-1800 FOR MORE INFORMATION.
·ALL SIGNAGE, PAVEMENT MARKINGS, AND PARKING LOT STRIPING SHALL
CONFORM TO REQUIREMENTS GIVEN IN MANUAL OF UNIFORM TRAFFIC
CONTROL DEVICES (MUTCD). MUTCD REQUIRES THAT PARKING SPACES BE
MARKED IN WHITE. CONTACT TRAFFIC ENGINEERING AT (501) 379-1800 IF YOU
HAVE ANY QUESTIONS REGARDING STRIPING.
Property Zoning
THE SUBJECT PROPERTY WAS ZONED R-3 AT THE TIME OF SURVEY.
CONTACT: TIM HERNDON
PHONE:501-371-6817
APPLICATION TO RE-ZONE THE SUBJECT PROPERTY TO PZD, PLANNED ZONING DISTRICT, HAS
BEEN SUBMITTED TO THE CITY OF LITTLE ROCK PLANNING DEPARTMENT FOR REVIEW AND
ACCEPTANCE.
BUFFER REQUIREMENTS:
COMMERCIAL USES. THESE USES SHALL PROVIDE BUFFERS WHERE ABUTTING ANY USE OR
ZONING EXCEPT OFFICE, COMMERCIAL OR INDUSTRIAL. STREET BUFFERS SHALL BE REQUIRED
IN ALL INSTANCES.
LAND USE BUFFER. ALL SITES DEVELOPED, MODIFIED OR ENLARGED SHALL PROVIDE A LAND
USE BUFFER(S) AS FOLLOWS:
1. SIDE PROPERTY LINES AT SIX (6) PERCENT OF THE AVERAGE WIDTH OF THE LOT ON BOTH
SIDES;
2. REAR PROPERTY LINES AT SIX (6) PERCENT OF THE AVERAGE DEPTH OF THE LOT;
3.THE MINIMUM DIMENSION SHALL BE NINE (9) FEET IN ALL INSTANCES;
4.THE MAXIMUM DIMENSION REQUIRED SHALL BE FIFTY (50) FEET IN ALL INSTANCES.
STREET BUFFER. ALL SITES DEVELOPED, MODIFIED OR ENLARGED SHALL PROVIDE STREET
BUILDERS AS FOLLOWS:
1.ALL STREET PROPERTY LINES AT SIX (6) PERCENT OF THE AVERAGE DEPTH OF THE LOT.
2.STREET BUILDERS SHALL NOT BE REQUIRED FOR ALLEY FRONTAGE.
3.THE MINIMUM DIMENSION SHALL BE ONE-HALF THE FULL WIDTH REQUIREMENT BUT IN
NO CASE LESS THAN NINE (9) FEET.
4.THE MAXIMUM DIMENSION REQUIRED SHALL BE FIFTY (50) FEET.
*SEE ZONING ORDINANCE FOR ADDITIONAL RESTRICTIONS.
PROPERTY INFORMATION
Gross Site Area:43716 sf 1.00 acres
Proposed Dedicated R.O.W:7303 sf 0.17 acres
Net Site Area:36419 sf 0.84 acres
Zoning:REZONING TO PZD- PLANNED ZONING DISTRICT)
SITE INFORMATION
Total Paved / Gravel Area:14930 sf 0.84 acres
Total Sidewalk Area:11510 sf 0.84 acres
Total Building Area:Gross: 9246sf
/ Retail: 7621sf 0.84 acres
Total Impervious Area:26760 sf 0.84 acres
Total Pervious Area:9653 sf 0.84 acres
PARKING REGULATIONS
Required Spaces Ratio:1 Space/200 sf of Gross Floor Area
Required Spaces (Total):23
Provided Spaces (Total):30
Provided Accessible Spaces:2
BUILDING INFORMATION
Overall Building Height:18'-4" A.F.F. Top of Parapet)
LANDSCAPE INFORMATION
Vehicular Use Area: 14930 sf (8%= 1195 SF Interior Landscape Required)
Interior Landscape Shown: 1531 sf
Site Information Contacts
OWNER/DEVELOPER
PB General Holdings, LLC
5110 Talley Road
Little Rock, AR 72204
Ph: (501) 219-8899
LAND SURVEYOR:
Blew & Assoicates, PA
3825 N Shiloh Drive
Fayetteville, AR 72703
Ph: (479) 443-4506
Fax: (479) 58/2-1883
CIVIL ENGINEER
Blew & Associates, PA
5104 S Pinnalce Hills Pkwy, Ste 1-C
Rogers, AR 72758
Ph: (479) 443-4506
Fax: (479) 58/2-1883
ARCHITECT
Bartlett Architecture, Inc.
603 Highway 5 North
Benton, AR 72019
Ph: (501) 794-4448
Fax: (501) 794-4449
CITY OF LITTLE ROCK:
Planning Department
Jamie Collins, Director
723 West Markham Street
Little Rock, AR 72201
Ph: (501) 371-4790
gcollins@littlerock.gov
Civil Engineering/Division Manager
701 West MArkham Street
Little Rock, AR 72201
Ph: (501) 371-4811
Building Codes
Stephen Crain - Plans Examiner
723 West Markham Street
Little Rock, AR 72201
Ph: (501) 371-4875
CITY OF LITTLE ROCK CONTINUED:
Fire Department
Delphone D. Hubbard - Fire Chief
624 South Chester Street
Little Rock, AR 72201
Ph: (501) 918-3700
CENTRAL ARKANSAS WATER
221 E Capitol Ave
Little Rock, AR 72202
Ph: (501) 372-5161
LITTLE ROCK WATER
RECLAMATION AUTHORITY
Vince Hotho
11 Clearwater Dr.
Little Rock, AR 72204
Ph: (501) 688-1452
WINDSTREAM
TELECOMMUNICATIONS
4001 N Rodney Parham Rd.
Little Rock, AR 72212
Ph: (501) 404-7947
CENTERPOINT ENERGY
Megan Reynolds
Ph: (501) 404-7947
AT&T ARKANSAS
17000 Cantrell Rd, Room B-17
Little Rock, AR 72223
Ph: (501) 615-5823
ENTERGY ARKANSAS
John Jones
425 W Capital Ave #27
Little Rock, AR 72201
(800) 368-3749
PROPOSED
RETAIL STORE
BUILDING
70'-0" X 130'-0"
"E" PLAN
W/ VESTIBULE
(HVAC UNITS ON ROOF)
Truck Path
Scale: 1" = 40'
℄℄℄℄℄℄℄℄℄XXXX X X X X X X X
XXOHEOHEOHEOHE OHEOHE OHE OHE OHE OHE OHEOHEOHEOHE
OHEOHEOHEOHEOHEOHEGASGAS
GAS
GAS
GAS
GAS
GAS
GAS GAS GASW
T
T
WV
WV
SS SS
SS SS SS
SS SS SS SS SS
XXXXOHEOHEXX
OHE OHE OHE
OHE OHE OHE
Subject Property
Area
(Before ROW Dedication)
43716 Sq. Ft. (+/-)
1.004 Acres (+/-)
(After ROW Dedication)
36413 Sq. Ft. (+/-)
0.836 Acres (+/-)
WV
WV
WV
WWWWWWWWWWW W W W W W W W W W W W W W W W
3643
6
5
3
6
6
3
6
7
368
369
370
371
372
373
3
7
4
375
376
370
3
7
1
368
369
365
366
367
362363364
361362364363365366367368369370372373374375376374
3
7
5 376377379
377378378
3
75
3
7
6
37
7
375.22374.74375.26
375.26374.80
375.07 375.31
375.28375.21
375.70375.70
375.53 375.75
375.60375.19
375.96
375.49
376.22375.83
375.97
375.96
375.97
376.45
376.41
376.37
376.65
376.81376.18376.67
376.65376.20376.92
376.67376.27
376.09 376.50
376.46
376.03
375.96 376.03
375.82
376.27
375.
7
9
375.7
7
375.54
375.99
377.04
377.68
376.78378.81
379.18
379.86
380.13
379.56
379.74
378.05
378.52
375.88
376.62
375.10
375.57
374.47
374.40373.83373.40
373.44373.54373.17
373.04
372.57
372.52
3
7
2
.
7
1
372.04371.92
371.90 372.30
372.28371.82
371.85372.21
372.20 371.66371.65372.10
3
7
1
.
8
2 371.43370.96371.48
370.68
370.68
368.29 368.30368.23368.70
368.21
367.69367.64
367.15
372.26
371.46
368.44
364.58 364.10364.57
361.35
360.94361.03361.41361.37361.18360.89
360.73 360.76
361.12361.35361.61361.13
364.70
364.07
364.59
360.34360.39
359.98
360.26
360.38360.38359.91
360.77 360.77360.87360.87360.38
360.78 360.92362.05
363.84
362.38361.94 363.49363.11
364.67367.30367.54365.42365.53366.75367.49368.24
368.93
369.04
367.39368.46369.31
369.38
3
6
8
.
9
4
369.26
369.65
367.68367.15
368.11
368.61368.92368.54
369.32
369.77
369.71
369.71 370.67370.62 371.1237
1
.
5
3
372.15371.64373.14372.60372.96
373.08
FL: 370.38
3
7
2
.
3
5
372.22 372.49
371.30
373.01
374.41 375.23
375.11
373.84 373.85
375.06
375.45
375.79 375.87
378.02 379.28 379.60
379.48
378.79
378.34 378.04
378.38 377.73
377.05
376.92
376.68
376.58
376.25375.60
375.67
375.87
376.23
375.92375.53
375.62375.91375.81375.83
375.79375.65375.70
3
7
6
.
5
4
376.46376.00
375.65
375.69
375.38
375.36
3
7
5
.
8
7
3
7
5
.
8
0
375.38
375.33375.39375.69375.32
375.39 375.72
3
7
5
.
9
1
375.93
375.40
375.44
3
7
5
.
1
1
374.79
375.27
375.10
374.83
374.77
374.51
375.78
375.70
374.38
373.82 374.62
374.97
375.01
374.49
374.84375.20375.28
375.55
375.04
375.18
375.56375.70375.65
3
7
5
.
6
5
375.73
375.32
3
7
5
.
6
1
375.59375.13
375.82374.53
376.80
377.33
376.16
377.23
378.99
377.34
375.58
373.90
370.59
372.14
374.32372.30
368.51
367.09
363.73
367.21
370.28
367.46
365.72
374.83
374.82
374.84374.82
374.50
374.81
374.81374.79
374.11
374.79
374.23 373.84
374.22
373.82
373.65374.09
369.36 369.05
368.73
369.38
369.81 369.94370.37370.25369.66370.61
370.15
368.54
368.57 369.18
368.65
369.17
369.46
369.97
370.45
370.29
370.87
370.93
T47
T46
T45
T44
T43
T42
T41
T40
T39
T38
T37
T36T35
T34
T33
T32
T31T30
T29T28
T27
T26T25
T24
T23
T22
T21
T20
T19
T18
T17
T16
T15
T14
T13T12
T11
T10T9
T8
T7 T6
T5
T4 T3
T2
T1
XW 11th Street
50' Public Right-of-Way - Asphalt Pavement
City Owned & Maintained
25 MPH
S 02°13'30" W112.96' (M)C
2S 88°11'53" E
238.59' (M)C1N 01°45'43" E 110.49' (M)ROW Area to be dedicated to the city
(Per separate plat)Fair Park BoulevardVariable Public Right-of-Way - Variable Asphalt PavementCity Owned & Maintained40 MPH6 RCP 6 VCP
8" DIP2" PVC 2" PVC
S Tyler StreetPublic Right-of-Way - Asphalt PavementCity Owned & MaintainedDMH #4
Rim Elevation: 367.97'
SMH #2
Rim Elevation: 362.87'
SMH #4
SMH #5
Rim Elevation: 376.85'
DMH #6
Rim Elevation: 360.90'
GI #2
Rim Elevation: 360.17'
SMH #1
Rim Elevation: 360.70'
SMH #3
Rim Elevation: 365.17'
DMH #5
Rim Elevation: 368.24'
DMH #1
Rim Elevation: 371.87'DMH #2
Rim Elevation: 372.24'
DMH #3
Rim Elevation: 374.71'
GI #1
Rim Elevation: 369.40'
FO
S2
S3
S1
S5
ROW to the city of Little Rock
Per Warranty Deed Filed on
6/2/2004 as Instrument No. 2004
50' Min.
All trees, structures, and brush within
the hatched areas are to be removed,
anything located outside the hatched
areas are to remain unless otherwise
specified.SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF3,000 SF Laydown
& Storage Area
(Size as Needed)
Concrete Washout Area
Limit of Disturbance
SILT F
Relocate Sanitary
Structures & Lines
Relocate Sanitary
Structures & Lines
Relocate Electric
Lines & Structures
Relocate Electric
Lines & Structures
SAVE
SAVE
SAVE
DEMO
RELOC
RELOC
RELOC
SAVE
RELOC
SHEET NUMBER:
DRAWING NAME:
21-8761 Sketch Grade 001.dwg
SEAL:
FIRM:
VICINITY MAP
N.T.S.
BLE W & A SSOCIATES , PA
CIVIL ENGINEERS & LAND SURVEYORS
3825 NORTH SHILOH DRIVE
FAYETTEVILLE, ARKANSAS 72703
OFFICE: 479.443.4506
FAX: 479.582.1883
www.BLEWINC.com
Certificate of Authorization № 1534
JOB NUMBER:
DRAWN BY:
DATE:
REVIEWED BY:Demolition and Erosion Control Plan Ph 1-C2Sketch Plans For:p:\21-8761 dg little rock (fair park)\civil drawings\21-8761 sketch grade 001.dwg - Plotted on 11/10/2021 10:33:51 AM @ a scale of 1:1 to autocad pdf (smallest file).pc3 by Catey AtchleyDollar General of Little Rock (Fair Park)1101 Fair Park Blvd. Little Rock, AR 72204PB General Holdings, LLC5110 Talley RoadLittle Rock, AR 72204(501) 219-88992021-11-10
A. Pope
21-8761
W. Cody SextonREVISIONS:PRE-BIDPOST-BIDDESCRIPTIONDATE:№:---------------------NOT
F
O
R
CON
S
T
R
U
C
TI
O
N
FOR
R
E
VI
E
W
ONL
Y!!!
NOT
F
O
R
CON
S
T
R
U
C
TI
O
N
FOR
R
E
VI
E
W
ONL
Y!!!
Proposed Features:
Feature Description
Note:
*See Survey For Existing Features Legend.
*See Cover Sheet For Abbreviation List.
Property Line
Onsite Property Line
Offsite Property Line
Right-Of-Way Line
Know what's below.
Call before you dig.nwswsen
e
EN
WS( IN FEET )
GRAPHIC SCALE
20'0 10'20'40'80'
1 inch = 20 ft
r Contractor shall be responsible for removal of the Existing Structures,
Related Utilities, Paving, Underground Storage Tanks and any other
existing improvements as noted. Contractor is to remove and dispose of
all debris, rubbish, and other materials resulting from previous and
current demolition operations. Disposal shall be in accordance with all
Local, State and/or Federal Regulations Governing such operations.
r The General Contractor shall take all precautions necessary to avoid
property damage to adjacent properties during the construction phases
of this project. The contractor will be held solely responsible for any
damages to the adjacent properties occurring during the construction
phases of this project.
r The Contractor is specifically cautioned that the location and/or
elevation of existing utilities as shown on these plans is based on records
of the various utility companies, and where possible, measurements
taken in the field. The information is not to be relied upon as being exact
or complete. The contractor must call the appropriate utility company at
least 48 hours prior to any excavation to request exact field location of
utilities. It shall be the contractor's responsibility locate all existing
utilities which conflict with the proposed improvements shown on the
plans, whether shown or not shown at no additional cost to the owner.
r Contractor shall remove all buildings, pavement, curbs, trees, light poles,
utility poles and lines from the site up to the limits of construction or
the property line unless otherwise noted. Contractor shall cap/plug any
water, gas, sanitary sewer or storm sewer line at the property line.
Electric and Telephone lines whether overhead or underground shall be
terminated at the closest utility pole or pedestal to the property line or
per the Designated Utility Company's Requirements.
r It is the Contractor's responsibility to remove any and all asbestos or
any other hazardous materials from the site per government guidelines
and shall dispose of the hazardous materials in strict accordance to
the guidelines.
r Contractor shall ensure that adequate measures are taken prior to the
removal of any existing storm water / sanitary sewer systems so that
the discharge of water remains uninterrupted both on and off the site.
r Contractor shall ensure that any utility service to the site that shall be
removed will not interrupt service to the neighboring property owners. It
is the contractors responsibility to coordinate with the neighboring
property owners if service will be interrupted.
Demolition Notes:
r The Storm Water Pollution Prevention Plan (SWPPP) is comprised of the Erosion Phase I & II
construction drawings, the standard details and any related documents including City
ordinance.
r Contractor shall implement best management practices as required by the SWPPP.
Additional best management practices shall be implemented as dictated by conditions at no
additional cost of owner throughout all phases of construction.
r Best Management Practices (BMP's) and controls shall conform to federal, state, or local
requirements or manual of practice, as applicable, Contractor shall implement additional
controls as directed by permitting agency or owner.
r Site map must clearly delineate all state waters. Permits for any construction activity
impacting state waters or regulated wetlands must be maintained on site at all times.
r Contractor shall minimize clearing to the maximum extent practical or as required by the
general permit.
r General Contractor shall denote on plan the temporary parking and storage area which shall
also be used as the equipment maintenance and cleaning area, employee parking area, and
area for locating portable facilities, office trailers, and toilet facilities.
r All wash water (concrete trucks, vehicle cleaning, equipment cleaning, etc.) shall be detained
and properly treated or disposed.
r Sufficient oil and grease absorbing materials and flotation booms shall be maintained on site
or readily available to contain and clean-up fuel or chemical spills and leaks.
r Dust on the site shall be controlled. The use of motor oils and other petroleum based or
toxic liquids for dust suppression operations is prohibited.
r Rubbish, trash, garbage, litter, or other such materials shall be deposited into sealed
containers. Materials shall be prevented from leaving the premises through the action of
wind or storm water discharge into drainage ditches or Waters of the State or U.S.
r All storm water pollution prevention measures presented on this plan, and in the Storm
Water Pollution Prevention Plan, shall be initiated as soon as practicable.
r Disturbed portions of the site where construction activity has stopped shall be temporarily
seeded no later than 14 days after the last construction activity occurring in these areas.
r Disturbed portions of the site where construction activity has permanently stopped shall be
permanently seeded. These areas shall be seeded no later than 14 days after the last
construction activity occurring in these areas. Refer to the grading plan and/or landscape
plan.
r If the action of vehicles traveling over the gravel construction entrances is not sufficient to
remove the majority of dirt or mud, then the tires must be washed before the vehicles enter
a public road. If washing is used, provisions must be made to intercept the wash water and
trap the sediment before it is carried off the site.
r All materials spilled, dropped, washed, or tracked from vehicles onto roadways or into storm
drains must be removed immediately.
r Contractors or Subcontractors will be responsible for removing sediment in the detention
pond and any sediment that may have collected in the storm sewer drainage systems in
conjunction with the stabilization of the site.
r On-site & offsite soil stockpile and borrow areas shall be protected from erosion and
sedimentation through implementation of best management practices. Stockpile and borrow
area locations shall be noted on the site map and permitted in accordance with general
permit requirements.
r Slopes shall be left in a roughened condition during the grading phase to reduce runoff
velocities and erosion.
r Due to the grade changes during the development of the project, the Contractor shall be
responsible for adjusting the erosion control measures (silt fences, straw bales, etc.) to
prevent erosion.
r All construction shall be stabilized at the end of each working day, this includes backfilling of
trenches for utility construction and placement of gravel or bituminous paving for road
construction.
Erosion General Notes:
SWPPP Phase I:
1.Pre-construction meeting.
2.Install stabilized construction exit(s) and concrete wash area(s).
3.Prepare temporary parking and storage area. Upon implementation and
installation of the following areas:
a.Trailer
b.Parking & storage areas
c.Lay down
d.Porta potty
e.Wheel wash &/or concrete washout
f.Masons area
g.Fuel and material storage containers
h.Solid waste containers, etc.,
denote them on the site maps immediately and note any changes in the
locations as they occur throughout the construction process.
4.The following shall be shown on the erosion control site map upon
implementation and installation:
a.Construction trailer(s)
b.Parking & storage areas
c.Lay down
d.Porta-potty
e.Wheel wash &/or concrete washout
f.Fuel and material storage containers
g.Solid waste containers, etc.
5.Construct the silt fences on the site.
6.Contractor shall halt all ground disturbance activities and contact the
civil engineer of record to perform inspection and certification of bmps.
General contractor shall schedule and conduct storm water
pre-construction meeting with engineer and all ground-disturbing
contractors before proceeding with construction.
7.Construct the sediment basin(s) with outfall structure as shown on plan.
8.Clear and grub the site.
9.Start construction of building pad and structures, if any.
10.Begin grading the site.
SWPPP Phase II
1. Temporarily seed denuded areas.
2. Install utilities, underdrains, storm sewers, curbs and gutters.
3. Install rip rap around outlet structures where noted on plans.
4.Install inlet protection around all storm sewer structures.
5.Prepare site for paving.
6.Pave site.
7.Install inlet protection devices.
8.Complete grading and install permanent seeding and planting.
9.Remove all temporary erosion and sediment control devices (only if site
is stabilized).
Sequence of Construction:
All measures stated on this erosion and sediment control plan, and in the
storm water pollution prevention plan, shall be maintained in fully functional
condition until no longer required for a completed phase of work or final
stabilization of the site. All erosion and sedimentation control measures shall
be checked by a qualified person in accordance with the contract documents
or the applicable permit, whichever is more stringent, and repaired in
accordance with the following:
1. Inlet protection devices and barriers shall be repaired or replaced if they
show signs of undermining, or deterioration.
2. All seeded areas shall be checked regularly to see that a good stand is
maintained. Areas should be fertilized, watered, and reseeded as needed.
3. Silt fences shall be repaired to their original conditions if damaged.
Sediment shall be removed from the silt fences when it reaches one-half
the height of the silt fence.
4. The construction entrances shall be maintained in a condition which will
prevent tracking or flow of mud onto public rights-of-way. This may
require periodic top dressing of the construction entrances as conditions
demand.
5. The temporary parking and storage area shall be kept in good condition
(suitable for parking and storage). This may require periodic top dressing
of the temporary parking as conditions demand.
6. Outlet structures in the sedimentation basins shall be maintained in
operational conditions at all times. Sediment shall be removed from
sediment basins or traps when the design capacity has been reduced by
50%.
Maintenance:
Existing to Remain. In the case of vegetation, Contractor shall ensure
survival of plants
Existing to be Removed / Demolished
Existing to be Relocated.
Existing to Be Abandoned in Place. Refer to Governing Agency for
requirements to abandon in place.
Demolition Notes:
Key Description
DEMO
ABNDN
SAVE
RELOC
AVD
RCD
TREE
Temporary Gravel Construction
Entrance / Exit
Silt Fence
Inlet Protection
Temporary Diversion Dike
Rock Check Dams
Existing Grass
(See Plan For Width)
Rip-rap (see Plan For Size)
Note:
*Only symbols that appear on this sheet are shown in this legend.
Tree Preservation And Protection
Anti-vortex Device
TDD >>
TPF
SF
DIVDIKE
TYPE
RIPRAP
INLET
GRASS
SILT F
EXIT
Temp & Perm Controls:
Feature Key Description
WattleWTLWATTLE
SITEW. 11th St.Fair Park Blvd.S. Tyler St.
℄℄℄℄℄℄℄℄℄XXXX X X X X X X X
XXOHEOHEOHEOHE OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEGASGAS
GAS
GAS
GAS
GAS
GAS
GAS GAS GASW
T
T
WV
WV
SS SS
SS SS SS XXXXOHEOHEXX
WV
WV
WV
WWWWWWWWWWW W W W W W W W W W W W W W W W
3643
6
5
3
6
6
3
6
7
368
369
370
371
372
373
3
7
4
375
376
370
3
7
1
368
369
365
366
367
362363364
361362364363365366367368369370372373374375376374
3
7
5 376377379
377378378
3
75
3
7
6
37
7
T47
T46
T26T25
T8 T4 T3
XW 11th Street
50' Public Right-of-Way - Asphalt Pavement
City Owned & Maintained
25 MPH
Fair Park BoulevardVariable Public Right-of-Way - Variable Asphalt PavementCity Owned & Maintained40 MPHS Tyler StreetPublic Right-of-Way - Asphalt PavementCity Owned & MaintainedFO
S1
S5
50' Min.SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF3,000 SF Laydown
& Storage Area
(Size as Needed)
6" SS 6" SS 6" SS S
4" SS 4" SS 4" SS
AREA
Proposed
Underground
Detention
37
6
37
6
3753
7
3
376
376376370365380377377378378
4.33'4.33'
PROPOSED
RETAIL STORE
BUILDING
70'-0" X 130'-0"
"E" PLAN
W/ VESTIBULE
(HVAC UNITS ON ROOF)
FFE: 376.82
INLET INLET
INLET
Concrete Washout Area
Limit of Disturbance
SILT F
SHEET NUMBER:
DRAWING NAME:
21-8761 Sketch Grade 001.dwg
SEAL:
FIRM:
VICINITY MAP
N.T.S.
BLE W & A SSOCIATES , PA
CIVIL ENGINEERS & LAND SURVEYORS
3825 NORTH SHILOH DRIVE
FAYETTEVILLE, ARKANSAS 72703
OFFICE: 479.443.4506
FAX: 479.582.1883
www.BLEWINC.com
Certificate of Authorization № 1534
JOB NUMBER:
DRAWN BY:
DATE:
REVIEWED BY:Erosion Control Plan Ph 2-C2-1Sketch Plans For:p:\21-8761 dg little rock (fair park)\civil drawings\21-8761 sketch grade 001.dwg - Plotted on 11/10/2021 10:34:06 AM @ a scale of 1:1 to autocad pdf (smallest file).pc3 by Catey AtchleyDollar General of Little Rock (Fair Park)1101 Fair Park Blvd. Little Rock, AR 72204PB General Holdings, LLC5110 Talley RoadLittle Rock, AR 72204(501) 219-88992021-11-10
A. Pope
21-8761
W. Cody SextonREVISIONS:PRE-BIDPOST-BIDDESCRIPTIONDATE:№:---------------------NOT
F
O
R
CON
S
T
R
U
C
TI
O
N
FOR
R
E
VI
E
W
ONL
Y!!!
NOT
F
O
R
CON
S
T
R
U
C
TI
O
N
FOR
R
E
VI
E
W
ONL
Y!!!
Proposed Features:
Feature Description
Note:
*Only Symbols That Appear On This Sheet Are Shown In This Legend.
*See Survey For Existing Features Legend.
*See Cover Sheet For Abbreviation List.
Property Line
Onsite Property Line
Offsite Property Line
Right-Of-Way Line
Easement Line
Street / Drive Centerline
Thickened Edge Of Pavement
Edge Of Gravel
General Fence Line
Chain Link Fence Line
Board Fence Line
Storm Pipe (See Grading Plan
Retaining Wall
See Utility Plan For Line Sizes
Water Line
Tee, Cross, Bends, Gate Vale
& Reducer
Fire Hydrant & Assembly
Water Meter - Single
Water Meter - Double
Sanitary Sewer Force Main
Sanitary Sewer Line
Sanitary Sewer Service
Sanitary Sewer Manhole
Gas Line
Overhead Electric Line
Underground Electric Line
Cable Television Line
Fiber Optic Line
Overhead Telephone Line
Underground Telephone Line
Utility Pole
Light Pole
Curb And Gutter
(See Site Plan For Size)
Asphalt Pavement (See Detail
Sheet For Pavement Sections)
Concrete Pavement (See Detail
Sheet For Pavement Sections)
Concrete Sidewalk
(See Site Plan For Dimensions)
Storm Catch Basin(s)
AREA
GRATED
CURB INLET
GRATED
INLET
JUNCTION
BOX
AREA
INLET
CURB
INLET
OUTFALL
STRUCTURE
MW
MW
S
X"FM
X"SS
GAS
OHE
UGE
C-TV
FO
OHT
UGT
X"W
X (See Plan For Type)
For Type and Size)
Ditch Line
Fault Line / Grade Change
Know what's below.
Call before you dig.nwswsen
e
EN
WS( IN FEET )
GRAPHIC SCALE
20'0 10'20'40'80'
1 inch = 20 ft
r The Storm Water Pollution Prevention Plan (SWPPP) is comprised of the Erosion Phase I & II
construction drawings, the standard details and any related documents including City
ordinance.
r Contractor shall implement best management practices as required by the SWPPP.
Additional best management practices shall be implemented as dictated by conditions at no
additional cost of owner throughout all phases of construction.
r Best Management Practices (BMP's) and controls shall conform to federal, state, or local
requirements or manual of practice, as applicable, Contractor shall implement additional
controls as directed by permitting agency or owner.
r Site map must clearly delineate all state waters. Permits for any construction activity
impacting state waters or regulated wetlands must be maintained on site at all times.
r Contractor shall minimize clearing to the maximum extent practical or as required by the
general permit.
r General Contractor shall denote on plan the temporary parking and storage area which shall
also be used as the equipment maintenance and cleaning area, employee parking area, and
area for locating portable facilities, office trailers, and toilet facilities.
r All wash water (concrete trucks, vehicle cleaning, equipment cleaning, etc.) shall be detained
and properly treated or disposed.
r Sufficient oil and grease absorbing materials and flotation booms shall be maintained on site
or readily available to contain and clean-up fuel or chemical spills and leaks.
r Dust on the site shall be controlled. The use of motor oils and other petroleum based or
toxic liquids for dust suppression operations is prohibited.
r Rubbish, trash, garbage, litter, or other such materials shall be deposited into sealed
containers. Materials shall be prevented from leaving the premises through the action of
wind or storm water discharge into drainage ditches or Waters of the State or U.S.
r All storm water pollution prevention measures presented on this plan, and in the Storm
Water Pollution Prevention Plan, shall be initiated as soon as practicable.
r Disturbed portions of the site where construction activity has stopped shall be temporarily
seeded no later than 14 days after the last construction activity occurring in these areas.
r Disturbed portions of the site where construction activity has permanently stopped shall be
permanently seeded. These areas shall be seeded no later than 14 days after the last
construction activity occurring in these areas. Refer to the grading plan and/or landscape
plan.
r If the action of vehicles traveling over the gravel construction entrances is not sufficient to
remove the majority of dirt or mud, then the tires must be washed before the vehicles enter
a public road. If washing is used, provisions must be made to intercept the wash water and
trap the sediment before it is carried off the site.
r All materials spilled, dropped, washed, or tracked from vehicles onto roadways or into storm
drains must be removed immediately.
r Contractors or Subcontractors will be responsible for removing sediment in the detention
pond and any sediment that may have collected in the storm sewer drainage systems in
conjunction with the stabilization of the site.
r On-site & offsite soil stockpile and borrow areas shall be protected from erosion and
sedimentation through implementation of best management practices. Stockpile and borrow
area locations shall be noted on the site map and permitted in accordance with general
permit requirements.
r Slopes shall be left in a roughened condition during the grading phase to reduce runoff
velocities and erosion.
r Due to the grade changes during the development of the project, the Contractor shall be
responsible for adjusting the erosion control measures (silt fences, straw bales, etc.) to
prevent erosion.
r All construction shall be stabilized at the end of each working day, this includes backfilling of
trenches for utility construction and placement of gravel or bituminous paving for road
construction.
Erosion General Notes:
Sequence of Construction:
5.Construct the silt fences on the site.
6.Contractor shall halt all ground disturbance activities and contact the
civil engineer of record to perform inspection and certification of bmps.
General contractor shall schedule and conduct storm water
pre-construction meeting with engineer and all ground-disturbing
contractors before proceeding with construction.
7.Construct the sediment basin(s) with outfall structure as shown on plan.
8.Clear and grub the site.
9.Start construction of building pad and structures, if any.
10.Begin grading the site.
SWPPP Phase II
1.Temporarily seed denuded areas.
2.Install utilities, underdrains, storm sewers, curbs and gutters.
3.Install rip rap around outlet structures where noted on plans.
4.Install inlet protection around all storm sewer structures.
5.Prepare site for paving.
6.Pave site.
7.Install inlet protection devices.
8.Complete grading and install permanent seeding and planting.
9.Remove all temporary erosion and sediment control devices (only if site
is stabilized).
SWPPP Phase I:
1.Pre-construction meeting.
2.Install stabilized construction exit(s) and concrete wash area(s).
3.Prepare temporary parking and storage area. Upon implementation and
installation of the following areas:
a.Trailer
b.Parking & storage areas
c.Lay down
d.Porta potty
e.Wheel wash &/or concrete washout
f.Masons area
g.Fuel and material storage containers
h.Solid waste containers, etc., denote them on the site maps
immediately and note any changes in the locations as they occur
throughout the construction process.
4.The following shall be shown on the erosion control site map upon
implementation and installation:
a.Construction trailer(s)
b.Parking & storage areas
c.Lay down
d.Porta-potty
e.Wheel wash &/or concrete washout
f.Fuel and material storage containers
g.Solid waste containers, etc.
All measures stated on this erosion and sediment control plan, and in the
storm water pollution prevention plan, shall be maintained in fully functional
condition until no longer required for a completed phase of work or final
stabilization of the site. All erosion and sedimentation control measures shall
be checked by a qualified person in accordance with the contract documents
or the applicable permit, whichever is more stringent, and repaired in
accordance with the following:
1. Inlet protection devices and barriers shall be repaired or replaced if they
show signs of undermining, or deterioration.
2. All seeded areas shall be checked regularly to see that a good stand is
maintained. Areas should be fertilized, watered, and reseeded as needed.
3. Silt fences shall be repaired to their original conditions if damaged.
Sediment shall be removed from the silt fences when it reaches one-half
the height of the silt fence.
4. The construction entrances shall be maintained in a condition which will
prevent tracking or flow of mud onto public rights-of-way. This may
require periodic top dressing of the construction entrances as conditions
demand.
5. The temporary parking and storage area shall be kept in good condition
(suitable for parking and storage). This may require periodic top dressing
of the temporary parking as conditions demand.
6. Outlet structures in the sedimentation basins shall be maintained in
operational conditions at all times. Sediment shall be removed from
sediment basins or traps when the design capacity has been reduced by
50%.
Maintenance:
AVD
RCD
TREE
Temporary Gravel Construction
Entrance / Exit
Silt Fence
Inlet Protection
Temporary Diversion Dike
Rock Check Dams
Existing Grass
(See Plan For Width)
Rip-rap (see Plan For Size)
Note:
*Only symbols that appear on this sheet are shown in this legend.
Tree Preservation And Protection
Anti-vortex Device
TDD >>
TPF
SF
DIVDIKE
TYPE
RIPRAP
INLET
GRASS
SILT F
EXIT
Temp & Perm Controls:
Feature Key Description
WattleWTLWATTLE
PRE-CONSTRUCTION:
r Prior to start of site grading, erosion control measures shall be installed in
accordance to the erosion control plan. These erosion control measures,
as a minimum, shall include all silt fencing, temporary sediment ponds,
temporary construction entrance, and any other measures necessary to
ensure that sediment does not leave the site.
r Contractor shall notify the appropriate Utility Companies and the State
One-Call System a minimum of 48 hours prior to any excavation for the
location of all underground utility lines that will be affected by this
development. Please note that existing utilities noted on plan have been
located with all available information and that exact location of utility lines
may not be accurate.
r A pre-construction meeting shall be held on site once ALL Erosion Control
Measures have been installed and prior to any site grading / construction /
demolition.
GENERAL:
r Contractor shall install/use all required equipment so as to comply with all
safety standards dictated by OSHA, Federal, State, and Local
Regulations.
r Contractor shall coordinate with appropriate Utility Company as listed on
the cover sheet for adjustment of utility lines affected by cut and fill.
r Areas to be graded shall be cleared and grubbed so as to remove all
organic material including but not limited to vegetation, trees, roots,
debris or other materials that would affect the stability of the fill. If
uncertainty exists as to the suitability of any material, the contractor
shall have a Registered Geotechnical Engineer make the final
determination.
r Contractor shall ensure that the fill material be free of organic materials,
frozen materials, muck, highly compressible materials, rocks, rubbish,
timber, brush, stumps, building debris, and other materials that would
negatively affect the fill material.
r Contractor shall stock pile and maintain all good top soil removed from
areas to be graded and filled for use in final grading all critical / unpaved
areas.
r Contractor shall proof roll subgrade of all areas to be paved prior to
installation of paving materials. Any soft areas shall be removed and
replaced with select fill and compacted as noted in the pavement section
shown on the detail sheet.
r Contractor shall employ a Geotechnical Engineering / Inspection Firm
registered with the State of Arkansas for inspection and testing of
subgrade for proper compaction (95% standard proctor).
STORM SYSTEM:
r All drainage structures under paved areas and / or areas expecting heavy
duty traffic loading shall be designed to meet AASHTO Heavy Duty (H20)
traffic loading.
r Storm pipe / box shall be bedded in accordance with the bedding detail and
in accordance with the specifications of ASTM D2321 (latest edition
available at http://www.ASTM.org).
r Storm system is measured from the center of the box and from the end of
the flared end sections.
r Drainage structures shall be constructed so that the appropriate section
of the box, such as the gutter for curb inlets, the grate for drop inlets, is
at an elevation that will allow for the maximum drainage into the box in
accordance with proposed grades and spot elevation shown on the plan.
The contractor shall notify the engineer of record in the event of a
discrepancy.
r All drainage structures located within the State or Local Right of Way
shall be constructed in accordance with the specifications and details of
the Appropriate Governing Agency.
POST-CONSTRUCTION:
r Contractor shall scarify any area to receive top soil to a min. depth of 3".
r All unpaved disturbed areas shall be graded smooth and receive a minimum
of 4" of topsoil. The area shall be seeded and / or sodded in accordance
with the landscape plan. The area shall be watered until a hardy cover of
grass has been established and 80% of the site has been stabilized in
accordance with ADEQ's Construction General Permit (ARR150000).
r Once the site has reached final stabilization in accordance to the
requirements set forth in ADEQ's Construction General Permit, the
contractor shall file a notice of termination.
Grading Notes:
SITEW. 11th St.Fair Park Blvd.S. Tyler St.
℄℄℄℄℄℄℄℄℄XXXX X X X X X X X
XXOHEOHEOHEOHE OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEGASGAS
GAS
GAS
GAS
GAS
GAS
GAS GAS GASW
T
T
WV
WV
SS SS
SS SS SS XXXXOHEOHEXX
WV
WV
WV
WWWWWWWWWWW W W W W W W W W W W W W W W W
3643
6
5
3
6
6
3
6
7
368
369
370
371
372
373
3
7
4
375
376
370
3
7
1
368
369
365
366
367
362363364
361362364363365366367368369370372373374375376374
3
7
5 376377379
377378378
3
75
3
7
6
37
7
FL: 370.38
XW 11th Street
50' Public Right-of-Way - Asphalt Pavement
City Owned & Maintained
25 MPH
Fair Park BoulevardVariable Public Right-of-Way - Variable Asphalt PavementCity Owned & Maintained40 MPHS Tyler StreetPublic Right-of-Way - Asphalt PavementCity Owned & MaintainedDMH #4
Rim Elevation: 367.97'
DMH #6
Rim Elevation: 360.90'
GI #2
Rim Elevation: 360.17'
DMH #5
Rim Elevation: 368.24'
DMH #1
Rim Elevation: 371.87'DMH #2
Rim Elevation: 372.24'
DMH #3
Rim Elevation: 374.71'
GI #1
Rim Elevation: 369.40'
FO
S1
S5
6" SS 6" SS 6" SS S
4" SS 4" SS 4" SS
AREA
Proposed
Underground
Detention
Proposed Outlet
Connection for Site
Detention HP 376.3237
6
37
6
3753
7
3
376
376376370365380377377378
Retaining Wall
with Ribbon Curb
(Max Height: 3.5')3784.33'4.33'
Proposed Detention will conform to the
City of Little Rock Drainage Requirements
& will release at a rate less than or equal
to pre-development rates.
Retaining Wall
(Max Height: 11.8')
Retaining Wall with Ribbon Curb
(Max Height: 2.3')
PROPOSED
RETAIL STORE
BUILDING
70'-0" X 130'-0"
"E" PLAN
W/ VESTIBULE
(HVAC UNITS ON ROOF)
FFE: 376.82 FlowFlow
Flow Flow
SHEET NUMBER:
DRAWING NAME:
21-8761 Sketch Grade 001.dwg
SEAL:
FIRM:
VICINITY MAP
N.T.S.
BLE W & A SSOCIATES , PA
CIVIL ENGINEERS & LAND SURVEYORS
3825 NORTH SHILOH DRIVE
FAYETTEVILLE, ARKANSAS 72703
OFFICE: 479.443.4506
FAX: 479.582.1883
www.BLEWINC.com
Certificate of Authorization № 1534
JOB NUMBER:
DRAWN BY:
DATE:
REVIEWED BY:Grading and Drainage Plan-C3Sketch Plans For:p:\21-8761 dg little rock (fair park)\civil drawings\21-8761 sketch grade 001.dwg - Plotted on 11/10/2021 10:34:18 AM @ a scale of 1:1 to autocad pdf (smallest file).pc3 by Catey AtchleyDollar General of Little Rock (Fair Park)1101 Fair Park Blvd. Little Rock, AR 72204PB General Holdings, LLC5110 Talley RoadLittle Rock, AR 72204(501) 219-88992021-11-10
A. Pope
21-8761
W. Cody SextonREVISIONS:PRE-BIDPOST-BIDDESCRIPTIONDATE:№:---------------------NOT
F
O
R
CON
S
T
R
U
C
TI
O
N
FOR
R
E
VI
E
W
ONL
Y!!!
NOT
F
O
R
CON
S
T
R
U
C
TI
O
N
FOR
R
E
VI
E
W
ONL
Y!!!
Proposed Features:
Feature Description
Note:
*Only Symbols That Appear On This Sheet Are Shown In This Legend.
*See Survey For Existing Features Legend.
*See Cover Sheet For Abbreviation List.
Property Line
Onsite Property Line
Offsite Property Line
Right-Of-Way Line
Easement Line
Street / Drive Centerline
Thickened Edge Of Pavement
Edge Of Gravel
General Fence Line
Chain Link Fence Line
Board Fence Line
Storm Pipe (See Grading Plan
Retaining Wall
See Utility Plan For Line Sizes
Water Line
Tee, Cross, Bends, Gate Vale
& Reducer
Fire Hydrant & Assembly
Water Meter - Single
Water Meter - Double
Sanitary Sewer Force Main
Sanitary Sewer Line
Sanitary Sewer Service
Sanitary Sewer Manhole
Gas Line
Overhead Electric Line
Underground Electric Line
Cable Television Line
Fiber Optic Line
Overhead Telephone Line
Underground Telephone Line
Utility Pole
Light Pole
Curb And Gutter
(See Site Plan For Size)
Asphalt Pavement (See Detail
Sheet For Pavement Sections)
Concrete Pavement (See Detail
Sheet For Pavement Sections)
Concrete Sidewalk
(See Site Plan For Dimensions)
Storm Catch Basin(s)
AREA
GRATED
CURB INLET
GRATED
INLET
JUNCTION
BOX
AREA
INLET
CURB
INLET
OUTFALL
STRUCTURE
MW
MW
S
X"FM
X"SS
GAS
OHE
UGE
C-TV
FO
OHT
UGT
X"W
X (See Plan For Type)
For Type and Size)
Ditch Line
Fault Line / Grade Change
Know what's below.
Call before you dig.nwswsen
e
EN
WS( IN FEET )
GRAPHIC SCALE
20'0 10'20'40'80'
1 inch = 20 ft
PRE-CONSTRUCTION:
r Prior to start of site grading, erosion control measures shall be installed in
accordance to the erosion control plan. These erosion control measures,
as a minimum, shall include all silt fencing, temporary sediment ponds,
temporary construction entrance, and any other measures necessary to
ensure that sediment does not leave the site.
r Contractor shall notify the appropriate Utility Companies and the State
One-Call System a minimum of 48 hours prior to any excavation for the
location of all underground utility lines that will be affected by this
development. Please note that existing utilities noted on plan have been
located with all available information and that exact location of utility lines
may not be accurate.
r A pre-construction meeting shall be held on site once ALL Erosion Control
Measures have been installed and prior to any site grading / construction /
demolition.
GENERAL:
r Contractor shall install/use all required equipment so as to comply with all
safety standards dictated by OSHA, Federal, State, and Local
Regulations.
r Contractor shall coordinate with appropriate Utility Company as listed on
the cover sheet for adjustment of utility lines affected by cut and fill.
r Areas to be graded shall be cleared and grubbed so as to remove all
organic material including but not limited to vegetation, trees, roots,
debris or other materials that would affect the stability of the fill. If
uncertainty exists as to the suitability of any material, the contractor
shall have a Registered Geotechnical Engineer make the final
determination.
r Contractor shall ensure that the fill material be free of organic materials,
frozen materials, muck, highly compressible materials, rocks, rubbish,
timber, brush, stumps, building debris, and other materials that would
negatively affect the fill material.
r Contractor shall stock pile and maintain all good top soil removed from
areas to be graded and filled for use in final grading all critical / unpaved
areas.
r Contractor shall proof roll subgrade of all areas to be paved prior to
installation of paving materials. Any soft areas shall be removed and
replaced with select fill and compacted as noted in the pavement section
shown on the detail sheet.
r Contractor shall employ a Geotechnical Engineering / Inspection Firm
registered with the State of Arkansas for inspection and testing of
subgrade for proper compaction (95% standard proctor).
STORM SYSTEM:
r All drainage structures under paved areas and / or areas expecting heavy
duty traffic loading shall be designed to meet AASHTO Heavy Duty (H20)
traffic loading.
r Storm pipe / box shall be bedded in accordance with the bedding detail and
in accordance with the specifications of ASTM D2321 (latest edition
available at http://www.ASTM.org).
r Storm system is measured from the center of the box and from the end of
the flared end sections.
r Drainage structures shall be constructed so that the appropriate section
of the box, such as the gutter for curb inlets, the grate for drop inlets, is
at an elevation that will allow for the maximum drainage into the box in
accordance with proposed grades and spot elevation shown on the plan.
The contractor shall notify the engineer of record in the event of a
discrepancy.
r All drainage structures located within the State or Local Right of Way
shall be constructed in accordance with the specifications and details of
the Appropriate Governing Agency.
POST-CONSTRUCTION:
r Contractor shall scarify any area to receive top soil to a min. depth of 3".
r All unpaved disturbed areas shall be graded smooth and receive a minimum
of 4" of topsoil. The area shall be seeded and / or sodded in accordance
with the landscape plan. The area shall be watered until a hardy cover of
grass has been established and 80% of the site has been stabilized in
accordance with ADEQ's Construction General Permit (ARR150000).
r Once the site has reached final stabilization in accordance to the
requirements set forth in ADEQ's Construction General Permit, the
contractor shall file a notice of termination.
Grading Notes:
SITEW. 11th St.Fair Park Blvd.S. Tyler St.
XXXX X X X X X X X
XXOHEOHEOHEOHE OHEOHE OHE OHE OHE OHE OHEOHEOHEOHE
OHEOHEOHEOHEOHEOHEGASGAS
GAS
GAS
GAS
GAS
GAS
GAS GAS GASW
T
T
WV
WV
SS SS
SS SS SS
SS SS SS SS SS
XXXXOHEOHEXX
OHE OHE OHE
OHE OHE OHE
WV
WV
WV
WWWWWWWWWWW W W W W W W W W W W W W W W W
XW 11th Street
50' Public Right-of-Way - Asphalt Pavement
City Owned & Maintained
25 MPH
Fair Park BoulevardVariable Public Right-of-Way - Variable Asphalt PavementCity Owned & Maintained40 MPH6 RCP 6 VCP
8" DIP2" PVC 2" PVC
S Tyler StreetPublic Right-of-Way - Asphalt PavementCity Owned & MaintainedSMH #2
Rim Elevation: 362.87'
SMH #4
SMH #5
Rim Elevation: 376.85'
SMH #1
Rim Elevation: 360.70'
SMH #3
Rim Elevation: 365.17'
FO
S1
S5
6" SS 6" SS 6" SS S
Relocate Existing
Overhead Power Line
Relocate Existing
Electric Structures
as Necessary
Proposed Sanitary
Sewer Relocation
Demo/Relocate Sanitary
Structures as Necessary
4" SS 4" SS 4" SS
AREA
8.24'9.34'6.91'7.43'8.16'Proposed
Underground
Detention
Proposed Outlet
Connection for Site
Detention
Retaining Wall
with Ribbon Curb
(Max Height: 3.5')
4.33'4.33'
Proposed Detention will conform to the
City of Little Rock Drainage Requirements
& will release at a rate less than or equal
to pre-development rates.
Retaining Wall
(Max Height: 11.8')
Proposed
Sanitary Sewer
Manhole
Relocate Existing
Electric Structures
as NecessaryRelocate Existing 6" Line
Retaining Wall with Ribbon Curb
(Max Height: 2.3')
PROPOSED
RETAIL STORE
BUILDING
70'-0" X 130'-0"
"E" PLAN
W/ VESTIBULE
(HVAC UNITS ON ROOF)
FFE: 376.82
SHEET NUMBER:
DRAWING NAME:
21-8761 Sketch Grade 001.dwg
SEAL:
FIRM:
VICINITY MAP
N.T.S.
BLE W & A SSOCIATES , PA
CIVIL ENGINEERS & LAND SURVEYORS
3825 NORTH SHILOH DRIVE
FAYETTEVILLE, ARKANSAS 72703
OFFICE: 479.443.4506
FAX: 479.582.1883
www.BLEWINC.com
Certificate of Authorization № 1534
JOB NUMBER:
DRAWN BY:
DATE:
REVIEWED BY:Utility Plan-C4Sketch Plans For:p:\21-8761 dg little rock (fair park)\civil drawings\21-8761 sketch grade 001.dwg - Plotted on 11/10/2021 10:35:07 AM @ a scale of 1:1 to autocad pdf (smallest file).pc3 by Catey AtchleyDollar General of Little Rock (Fair Park)1101 Fair Park Blvd. Little Rock, AR 72204PB General Holdings, LLC5110 Talley RoadLittle Rock, AR 72204(501) 219-88992021-11-10
A. Pope
21-8761
W. Cody SextonREVISIONS:PRE-BIDPOST-BIDDESCRIPTIONDATE:№:---------------------NOT
F
O
R
CON
S
T
R
U
C
TI
O
N
FOR
R
E
VI
E
W
ONL
Y!!!
NOT
F
O
R
CON
S
T
R
U
C
TI
O
N
FOR
R
E
VI
E
W
ONL
Y!!!
Proposed Features:
Feature Description
Note:
*Only Symbols That Appear On This Sheet Are Shown In This Legend.
*See Survey For Existing Features Legend.
*See Cover Sheet For Abbreviation List.
Property Line
Onsite Property Line
Offsite Property Line
Right-Of-Way Line
Easement Line
Thickened Edge Of Pavement
Edge Of Gravel
General Fence Line
Chain Link Fence Line
Board Fence Line
Storm Pipe (See Grading Plan
Retaining Wall
Water Line
Tee, Cross, Bends, Gate Vale
& Reducer
Fire Hydrant & Assembly
Water Meter - Single
Water Meter - Double
Sanitary Sewer Force Main
Sanitary Sewer Line
Sanitary Sewer Service
Sanitary Sewer Manhole
Gas Line
Overhead Electric Line
Underground Electric Line
Cable Television Line
Fiber Optic Line
Overhead Telephone Line
Underground Telephone Line
Utility Pole
Light Pole
Curb And Gutter
(See Site Plan For Size)
Asphalt Pavement (See Detail
Sheet For Pavement Sections)
Concrete Pavement (See Detail
Sheet For Pavement Sections)
Concrete Sidewalk
(See Site Plan For Dimensions)
Storm Catch Basin(s)
AREA
GRATED
CURB INLET
GRATED
INLET
JUNCTION
BOX
AREA
INLET
CURB
INLET
OUTFALL
STRUCTURE
MW
MW
S
X"FM
X"SS
GAS
OHE
UGE
C-TV
FO
OHT
UGT
X"W
X (See Plan For Type)
For Type and Size)
Know what's below.
Call before you dig.nwswsen
e
EN
WS( IN FEET )
GRAPHIC SCALE
20'0 10'20'40'80'
1 inch = 20 ft
r THE CONTRACTOR SHALL CONTACT "ARKANSAS ONE-CALL" AND/OR
THE APPROPRIATE UTILITY COMPANY A MINIMUM OF 48 HOURS
PRIOR TO EXCAVATION. THE CONTRACTOR IS RESPONSIBLE FOR ANY
DAMAGE TO ANY EXISTING UTILITY LINES AND SHALL COORDINATE
WITH THE APPROPRIATE UTILITY COMPANY FOR REPAIR OF THE
UTILITY.
r A PRE-CONSTRUCTION MEETING SHALL BE HELD PRIOR TO UTILITY
CONSTRUCTION. THE CONTRACTOR SHALL SCHEDULE THE
PRE-CONSTRUCTION MEETING WITH THE APPROPRIATE UTILITY AS
REQUIRED AND WITH THE ENGINEER OF RECORD FOR THE PROJECT.
r WATER AND SEWER LINES SHALL BE CONSTRUCTED IN
ACCORDANCE WITH ROGERS WATER UTILITIES (RWU) STANDARD
SPECIFICATIONS – LATEST EDITION.
r WATER AND STORM LINES SHALL HAVE A MINIMUM OF EIGHTEEN
(18) INCHES VERTICAL SEPARATION AND TEN (10) FOOT HORIZONTAL
SEPARATION FROM SANITARY SEWER LINES. ENCASEMENTS MAY
BE REQUIRED AS NOTED ON PLAN AND PROFILES.
r ALL PLUGS, CAPS, TEES, AND BENDS SHALL BE PROVIDED WITH
REACTION BACKING / THRUST BLOCKING OR SHALL BE RESTRAINED
JOINT PIPE. THE FITTING MUST BE BRACED AGAINST UNEXCAVATED
EARTH AT THE END THE TRENCH WITH 3000 psi PC CONCRETE.
RETAINER GLANDS MAY BE REQUIRED, AS DETERMINED BY RWU.
r CONTRACTOR SHALL REFER TO ARCHITECTURAL OR PLUMBING
DRAWINGS FOR UTILITY CONNECTION LOCATIONS FOR THE BUILDING.
r DIMENSIONS ARE TO THE FACE / CORNER OF THE BUILDING, FACE
OF CURB, AND CENTERLINE OF PIPE AND FITTING.
r CONTRACTOR SHALL COORDINATE DISRUPTION OF UTILITY
SERVICE(S) WITH ALL AFFECTED PROPERTY OWNERS.
r THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY
PIPES OR STRUCTURES SHOWN ON THE DRAWINGS ARE OBTAINED
BY A SEARCH OF THE AVAILABLE RECORDS. TO THE BEST OR OUR
KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN
ON THESE DRAWINGS AND WE ASSUME NO RESPONSIBLITY AS TO
THE ACCURACY OF THEIR DEPICTED LOCATION(S) ON THESE
DRAWINGS. THE CONTRACTOR IS REQUIRED TO TAKE DUE
PRECAUTIONARY MEASURES TO PROTECT THE UTILITY LINES SHOWN,
AND ALL OTHER LINES NOT OF RECORD OR NOT SHON ON THESE
DRAWINGS BY VERIFICATION OF THEIR LOCATION IN THE FIELD PRIOR
TO THE INITIATION OF THE ACTUAL PORTION OF THEIR WORK.
r CONTRACTOR SHALL OBTAIN AUTHROIZATION FROM (RWU) PRIOR TO
CONNECTION TO ANY EXISTING WATER LINE, SEWER LINE, OR SEWER
MANHOLE.
r PROPOSED UTILITIES THAT ARE TO BURIED WITHIN THE SAME
TRENCH SHALL BE COORDINATED WITH AND APPROVED BY THE
APPROPRIATE UTILITY COMPANIES.
r PROPOSED UTILITES SHALL BE CONSTRUCTED IN ACCORDANCE WITH
THE STANDARDS / SPECIFICATIONS OF THE GOVERNING AGENCY.
r CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE UTILITY
COMPANY FOR ADJUSTMENT OF UTILITY LINES AFFECTED BY CUT
AND FILL.
r CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE UTILITY
COMPANY FOR ROUTING OF GAS, TELEPHONE, CABLE, AND
ELECTRICITY AS REQUIRED.
r CONTRACTOR SHALL MAINTAIN A MIN. OF 5 FOOT SEPARATION FROM
WATER/SEWER AND STORM SEWER, GAS, ELECTRIC, STREET LIGHTS
AND TELEPHONE IS REQUIRED.