Loading...
HomeMy WebLinkAboutApplication 071421RICHARDSON ENGINEER 1 N G Planning - En9ingCring • O@vBlOp'nen1 Consu111ng This letter is intended to serve as the narrative letter required by the checklist included in the preliminary plat application 5. Name/address of landowner with source of title: Geoff Quo - Landowner PO Box 250927 Little Rock, Arkansas 72225 6. Name/address of landowner with source of title: Geoff Quo - Subdivider PO Box 250927 Little Rock, Arkansas 72225 7. Linear feet of internal streets. Deerhorn Drive — 546' 8. Average size of lots/Minim um lot size Average size of lots = 2.04 acres Minimum lot size = 2.00 acres 9. Number of lots Number of lots = 5 10. Applicable existing covenants and the proposed covenants on the land. There are no known existing covenants and no future proposed covenants at this point. 11. Proposed open space The only proposed open space that is expected as of this point is the mail pickup area. 12. Proposed source of water supply The proposed source of water for the development are water wells. 13. Proposed means of wastewater dis osal The proposed means of wastewater disposal is through septic tanks. 14. Request for variances, waivers, or deferrals No variances, waivers, or deferrals are requested 325 West South Street. Benton, AR 72015 Phone: 501-315-7225 richardson-engrs.com