HomeMy WebLinkAboutApplication 071421RICHARDSON
ENGINEER 1 N G
Planning - En9ingCring • O@vBlOp'nen1 Consu111ng
This letter is intended to serve as the narrative letter required by the checklist included in the
preliminary plat application
5. Name/address of landowner with source of title:
Geoff Quo - Landowner
PO Box 250927
Little Rock, Arkansas 72225
6. Name/address of landowner with source of title:
Geoff Quo - Subdivider
PO Box 250927
Little Rock, Arkansas 72225
7. Linear feet of internal streets.
Deerhorn Drive — 546'
8. Average size of lots/Minim um lot size
Average size of lots = 2.04 acres
Minimum lot size = 2.00 acres
9. Number of lots
Number of lots = 5
10. Applicable existing covenants and the proposed covenants on the land.
There are no known existing covenants and no future proposed covenants at this point.
11. Proposed open space
The only proposed open space that is expected as of this point is the mail pickup area.
12. Proposed source of water supply
The proposed source of water for the development are water wells.
13. Proposed means of wastewater dis osal
The proposed means of wastewater disposal is through septic tanks.
14. Request for variances, waivers, or deferrals
No variances, waivers, or deferrals are requested
325 West South Street. Benton, AR 72015 Phone: 501-315-7225 richardson-engrs.com