Loading...
HomeMy WebLinkAboutLetter of IntentWER ARCHITECTS(PLANNERS 112 West Center Street, Suite 410 Fayetteville, Arkansas 72701 479,966.4477 'I.:-,'qd !4-UPI ,•.Ai45'a 901 West Third Street Little Rock, Arkansas 72201 501.374.5300 W Prdi r;; r+ +:I )r n April 15, 2020 Mr. Monte Moore Department of Planning and Development 723 West Markham Little Rock, AR 72201 501-371-4790 Ref: Application for Conditional Use Permit for Friendship Aspire Academy, Chicot Rd, Little Rock Dear Mr. Moore, Please accept this cover letter with the attached documents to serve as our Conditional Use Permit application for the above reference project. We wish for our application to be accepted and approved at the Planning Commission meeting on June 4th 2020. Enclosed you will find the following digital documents: • Cover letter requesting review of the application • Application for Conditional Use Permit • Site survey to scale • Site / landscape plan to scale • Signed street right-of-way dedication agreement • Statement of subdivision bill of assurance • Filing Fee We are not requesting any variances with this application. Project Description: Friendship Aspire Academy, which currently has an elementary school at 3615 W 251h street, will serve 6th — 8th graders. The site is approximately 11.9 acres on Vernon Estates Drive, east of the 9100 block of Chicot Road. The site is the location of a former city housing project that has since been demolished. The site is directly to the north of the Fairfield residential subdivision and west of the Fairfield Cove residential subdivision. The site can be accessed from Chicot Road via Vernon Estates and the entrance is currently gated. Current zoning of the property is R-2 and R-3. We are seeking CUP approval for the site to allow for the proposed school building. The proposed improvements are as follow 1. Construction of a single story 36,430 sf middle school for 6'h _ 8'h grades with associated parking. The project will consist of a cafeteria, an administration wing, a gymnasium and two, classroom wings. The school is planned to serve 300 students. 2. There will be 12 classrooms in addition to lab, admin and parent services spaces, art and music rooms and special education breakout rooms. There will also be a cafeteria, a gymnasium, building service spaces and associated parking as well as a sand volleyball court, half -court basketball and outdoor classrooms. 3. Construction of an interior drive will serve as drop off and pickup of students for both parents & busses and will allow for car stacking to be on site. 4. The site will meet the current Landscape Ordinance requirements since the cost of the renovations will exceed 50% of the replacement value of the building. 5. A fence, security gate & guard shack will be incorporated around the perimeter. The main access will be at Vernon Estates drive. 6. Dumpster and loading services are on the north end of the site and will be screened as required by city ordinance. 7. Existing water mains and sewer lines as well as their easements from the previous subdivision will be abandoned and new utilities will be brought to the building. 8. A draft traffic study has been submitted for preliminary review. 9. The planned opening date is December of 2021 Please do not hesitate to contact me if you should have any questions. I look forward to receiving your plan review comments. Sincerely, WEIR Architects I Planners n Greer Jr. AIA LEED AP Enclosures