Loading...
HomeMy WebLinkAboutEmail Correspondence Engineering and Traffi Study 061720Moore, Monte From: Floriani, Vince Sent: Wednesday, June 17, 2020 4:27 PM To: Moore, Monte Subject: FW: 15122 Cantrell Rd.- Traffic Comments fyi Vince Floriani, P.E. Design Review Engineer Little Rock Public Works -Civil Engineering 723 W. Markham St. Little Rock, AR 72201 501-371-4817 vfloriani@littlerock.gov From: Banihatti, Nat <NBanihatti@littlerock.gov> Sent: Wednesday, June 17, 2020 4:15 PM To: Collins, Gilbert <gcollins@littlerock.gov>; Floriani, Vince <VFloriani@littlerock.gov> Subject: 15122 Cantrell Rd.- Traffic Comments JamieNince: Traffic Study indicates that the site can accommodate drive-thru traffic, However, t the following in case problems occur during peak hours.: t" 4c ►k 121.11 rive-thru queueing should be accommodated within the site. If queuing extends onto public roadways (i.e. Hwy 10) at any time, measures must be taken to prevent such queueing (measures such as restaurant staff taking orders inside the parking lot and delivering food to customers) ArDOT future roadway improvement plans may affect full driveway access. II striping shall conform to MUTCD guidelines. -Nat o AN sl'� f'4 X*V-4� ,n.w1'r I Moore, Monte From: Floriani, Vince Sent: Wednesday, June 17, 2020 4:27 PM To: Moore, Monte Subject: FW: 15122 Cantrell Rd.- Traffic Comments fyi Vince Floriani, P.E. Design Review Engineer Little Rock Public Works -Civil Engineering 723 W. Markham St. Little Rock, AR 72201 501-371-4817 vfloriani@littlerock.gov From: Banihatti, Nat <NBanihatti@littlerock.gov> Sent: Wednesday, June 17, 2020 4:15 PM To: Collins, Gilbert <gcollins@littlerock.gov>; Floriani, Vince <VFloriani@littlerock.gov> Subject: 15122 Cantrell Rd.- Traffic Comments JamieNince: Traffic Study indicates that the site can accommodate drive-thru traffic However, I would likew to place the following comments in case problems occur during peak hours.: 1. Drive-thru queueing should be accommodated within the site. If queuing extends onto public roadways (i.e. Hwy 10) at any time, measures must be taken to prevent such queueing (measures such as restaurant staff taking orders inside the parking lot and delivering food to customers) 2. ArDOT future roadway improvement plans may affect full driveway access. 3. All striping shall conform to MUTCD guidelines. -Nat 1