HomeMy WebLinkAboutPC Action Letter Approved with Conditions 120320December 3, 2020
ITEM NO.: 5 FILE NO.: Z-9543
NAME: Friendship Aspire Academy, Garland Campus – Conditional Use Permit
LOCATION: 3523 West 24th Street
DEVELOPER:
John Greer, WER Architects, Inc.
901 3rd Street
Little Rock, AR 72201
OWNER/AUTHORIZED AGENT:
KLS, Leasing, Inc.
P.O. Box 2030
Bentonville, AR 72712
SURVEYOR/ENGINEER:
McClelland Consulting Engineers, Inc.
7302 Kanis Road
Little Rock, AR 72204
AREA: 0.73 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF
WARD: 1 PLANNING DISTRICT: 9 CENSUS TRACT: 12
CURRENT ZONING: R-3, Single-Family District
VARIANCE/WAIVERS: None requested.
A. PROPOSAL/REQUEST/APPLICANT’S STATEMENT:
The applicant is requesting the approval of a Conditional Use Permit to allow the
development of a middle school campus for grades 4 and 5. The construction will
consist of eight (8) classrooms and will serve 200 students. The development will
also have one (1) administrative office and building service space.
December 3, 2020
ITEM NO.: 5 (Cont.) FILE NO.: Z-9543
2
B. EXISTING CONDITIONS:
The proposed school site located east of Maple Street between West 24th and
West 25th Streets is currently undeveloped. The property is located within a
single-family neighborhood which contains a variety of housing types and
sizes. Mixed uses are located south of the site along Asher Avenue. The
Friendship Aspire Charter School (grades K through 3) is located directly to
the west of the site. The development of this site is an extension this
development. In staff’s opinion, the new school campus will be compatible
with the surrounding uses.
C. NEIGHBORHOOD COMMENTS:
All owners of property located within 200 feet of the site and Stephens Area Faith,
Midtown, Love, and Goodwill Neighborhood Associations were notified of public
hearing.
D. ENGINEERING COMMENTS:
1. Due to the proposed use of the property, the Master Street Plan specifies that
West 24th Street for the frontage of this property must meet commercial street
standards. Dedicate right-of-way to 30 feet from centerline.
2. Due to the proposed use of the property, the Master Street Plan specifies that
West 25th Street for the frontage of this property must meet commercial street
standards. Dedicate right-of-way to 30 feet from centerline.
3. With site development, provide design of street conforming to the Master
Street Plan. Construct one-half street improvement to West 24th Street
including 5-foot sidewalks with planned development. The new curb should
connect with the existing curb to the west and maintain the same street width.
4. Repair or replace any curb, gutter, sidewalk and access ramps that are
damaged and not in compliance with ADA recommendations in the public
right-of-way prior to occupancy.
5. Close existing curb cuts not proposed to be used with proposed development.
6. Sidewalks with appropriate handicap ramps are required to be constructed
along 25th Street adjacent to the subject property in accordance with
Sec. 31-175 of the Little Rock Code and the Master Street Plan.
7. Plans of all work in right-of-way shall be submitted for approval prior to start
of work. Obtain barricade permit prior to doing any work in the right-of-way
from Traffic Engineering at (501) 379-1805 (Travis Herbner).
8. A grading permit in accordance with section 29-186 (c) & (d) will be required
prior to any land clearing or grading activities at the site. Other than residential
December 3, 2020
ITEM NO.: 5 (Cont.) FILE NO.: Z-9543
3
subdivisions, site grading and drainage plans must be submitted and
approved prior to the start of construction.
9. Provide a Sketch Grading and Drainage Plan per Sec. 29-186 (e).
10. Per Sec. 29-102 an evaluation should be conducted on the basis of existing
downstream development and any analysis of stormwater runoff with and
without the proposed development. If the proposed development will cause
or increase downstream flooding conditions, provisions to minimize such
flooding conditions should be included in the design of the storm
management improvements. Such provisions may include downstream
improvements and/or detention of stormwater runoff and its regulated
discharge to the downstream storm drainage system capacity.
11. Street Improvement plans shall include signage and striping. Public Works
must approve completed plans prior to construction.
12. A Traffic Study has been submitted and is under review.
13. Damage to public and private property due to hauling operations or operation
of construction related equipment from a nearby construction site shall be
repaired by the responsible party prior to issuance of a certificate of
occupancy.
E. UTILITIES/FIRE DEPARTMENT/PARKS/COUNTY PLANNING:
Little Rock Water Reclamation Authority: Sewer Available to this Site. FOG
Analysis required if food prep on Site.
Entergy: No comments received.
CenterPoint Energy: No comments.
AT & T: No comments received.
Central Arkansas Water: No comments received.
Fire Department:
Fire Hydrants.
Maintain fire apparatus access roads at fire hydrant locations as per Appendix D
of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.1 Access road
width with a hydrant. Where a fire hydrant is located on a fire apparatus access
road, the minimum road width shall be 26 feet, exclusive of shoulders.
December 3, 2020
ITEM NO.: 5 (Cont.) FILE NO.: Z-9543
4
Grade
Maintain fire apparatus access roads as per Appendix D of the 2012 Arkansas Fire
Prevention Code Vol. 1 Section D103.2 Grade. Fire apparatus access roads
shall not exceed 10 percent in grade except as approved by the fire chief. If
the grade exceeds 10 percent, approval will be denied and the applicant must
submit request to be reviewed by Fire Chief for Approval.
Loading
Maintain fire apparatus access road design as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and loading.
Facilities, buildings or portions of buildings hereafter constructed shall be
accessible to fire department apparatus by way of an approved fire apparatus
access road with an asphalt, concrete or other approved driving surface capable
of supporting the imposed load of fire apparatus weighing at least 75,000 pounds.
Dead Ends.
Maintain fire apparatus access roads at dead end locations as per Appendix
D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.4 Dead
Ends. Dead-end fire apparatus access roads in excess of 150 feet shall be
provided with width and turnaround provisions in accordance with Table D103.4.
Requirements for Dead-end fire apparatus access roads.
Fire Hydrants
Locate Fire Hydrants as per Appendix C of the 2012 Arkansas Fire
Prevention Code. Section C101 – C105, in conjunction with Central Arkansas
Water (Daniel Tull 501-377-1245) and the Little Rock Fire Marshal’s Office
(Capt. Tony Rhodes 501-918-3757 or Capt. John Hogue 501-918-3754). Number
and Distribution of Fire Hydrants as per Table C105.1.
Parks and Recreation: No comments received.
County Planning: No comments received.
F. BUILDING CODES/LANDSCAPE:
Building Code: No Comments Received.
Landscape:
1. Any new site development must comply with the City’s minimal landscape and
buffer ordinance requirements.
2. A perimeter planting strip is required along any side of a vehicular use area that
abuts adjoining property, or the right-of-way of any street. This strip shall be at
December 3, 2020
ITEM NO.: 5 (Cont.) FILE NO.: Z-9543
5
least nine (9) feet wide. One (1) tree and three (3) shrubs or vines shall be
planted for every thirty (30) linear feet of perimeter planting strip.
3. Screening requirements will need to be met for the vehicular use areas
adjacent to street right-of-way. Provide screening shrubs with an average linear
spacing of not less at three (3) feet within the required landscape area. Provide
trees with an average linear spacing of not less than thirty (30) feet.
4. Eight percent (8%) of the vehicular use area must be designated for green
space; this green space needs to be evenly distributed throughout the parking
area(s). The minimum size of an interior landscape area shall be one hundred
fifty (150) square feet for developments with one hundred fifty (150) or fewer
parking spaces. Interior islands must be a minimum of seven and one half (7
1/2) feet in width. Trees shall be included in the interior landscape areas at the
rate of one (1) tree for every twelve (12) parking spaces.
5. Landscape areas shall be provided between the vehicular use area used for
public parking and the general vicinity of the building, excluding truck loading
or service areas not opened to public parking. These shall be provided at the
rate equivalent to planter strip three (3) feet wide along the vehicular use area.
One (1) tree and four (4) shrubs shall be planted in the building landscape areas
for each forty (40) linear feet of vehicular use area abutting the building.
Landscape areas will need to be added for the commercial building.
6. An automatic irrigation system to water landscaped areas shall be required for
developments of one (1) acre or larger.
7. The City Beautiful Commission recommends preserving as many existing
trees as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper
or larger.
G. TRANSPORTATION/PLANNING:
Rock Region Metro: No comments.
H. ANALYSIS:
Friendship Aspire Academy proposes to develop a middle school campus on this
subject property located to the east of Maple Street between West 24th and West
25th Streets; two (2) blocks north of Asher Avenue. The proposed middle school
campus will be an extension of the Friendship Aspire Academy Garland campus
located immediately to the west. The project narrative from the applicant is as
follows:
December 3, 2020
ITEM NO.: 5 (Cont.) FILE NO.: Z-9543
6
alo
“The new Friendship Aspire Academy Middle school, which
currently has a K-3rd grade elementary school at 3615 West 25th
Street, will serve 4th-5th graders. The site is approximately 0.73
acres at West 24th Street, to the east of the existing Friendship
Elementary School. The site is bordered by West 24th Street to
the north and West 25th Street to the south and can be accessed
from West 24th Street. Current zoning of the property is R-3. We
are seeking CUP approval for the site to allow for the proposed
school building.
The proposed improvements are as follow:
1. Construction of a single story 8,740 sf middle school for 4th -
5th grades with associated parking. The project will consist of
8 classrooms and will serve 200 students.
2. There will be 8 classrooms, 1 admin office, building service
space and associated parking.
3. An interior drive will be extended from the existing east parking
lot and connect back to 24th Street. The drive will serve as drop
off and pickup of students for both parents & busses. The drive
will also include new parking spaces as required.
4. The site will meet the current Landscape Ordinance
requirements.
5. An existing fence at the current school will be extended around
the new site and a new security gate will be installed at the new
drive off West 24th Street.
6. Existing dumpster and loading services for the existing school
will be utilized for the new facility. Exterior ground mounted
mechanical equipment will be screened per requirements.
7. Existing water mains and sewer lines as well as their
easements from the previous subdivision will be abandoned
and new utilities will be brought to the building.
8. A draft traffic study has been submitted for preliminary review.
9. The planned opening date is August of 2021.”
December 3, 2020
ITEM NO.: 5 (Cont.) FILE NO.: Z-9543
7
The proposed school building will be brick veneer with aluminum storefront
windows measuring 6’ by 6’-4” tall. The building height will not exceed 20 feet.
The proposed building will be located at the southeast corner of the site within the
required setbacks.
Access to the site will be from West 24th Street. The traffic will remain east bound
only. Access drives and parking will extend along the north and west sides of the
proposed school building. The site will contain 18 paved parking spaces. An
interior drive will be extended from the existing west parking lot and connect back
to West 24th Street. The drive will serve as drop off and pickup of students for
both parents and buses.
There will be no new or additional ground-mounted signage. The signage at the
existing drive entry to the west will serve the new building. New ten (10) inch
extruded aluminum letters reading ‘Friendship Aspire Academy” will be located on
the north face of the building above the main entrance.
There will not be a dumpster located for this building. The building will make use
of existing screened dumpster facilities at the adjacent school building.
The applicant notes that all site lighting will be low-level and directed onto the site
and away from adjacent residential property.
The applicant provided the following information with respect to an existing sewer
easement located at the northeast corner of the site:
“After further review of the site survey, it was found that there is an
existing sewer easement on the site that would interfere with the
proposed building footprint. Onsite investigation as well as a
conversation with Vince Hotho at Little Rock Water Reclamation
revealed there is no sewer piping present in this current easement.
Further site investigations and research from OneCall revealed there
were no other utilities present in this easement either. The applicant
will submit a formal easement abandonment request to the city for
this easement.”
The sewer easement abandonment request will be submitted to the Board of
Directors for approval after the Planning Commission’s action on this conditional
use permit application.
The applicant provided responses and additional information to all issues
raised during staff’s review of the application. To staff’s knowledge there
December 3, 2020
ITEM NO.: 5 (Cont.) FILE NO.: Z-9543
8
are no outstanding issues. The applicant is requesting no variances with the
proposed conditional use permit.
Staff is supportive of the requested conditional use permit to allow development
of the property as a middle school campus, an extension of the Garland
School campus. Staff views the request was reasonable. The proposed school
development should prove to be a quality development within this R-3 zoned area
north of Asher Avenue. Staff believes the new middle school building and school
expansion will be compatible with the neighborhood and have no adverse impact
on the area.
The applicant has submitted a traffic study for the proposed development which
is currently being reviewed by the City’s Traffic Engineering Division.
Any comments/conditions added as a result of Traffic Engineering’s review will be
presented and added to staff’s recommendation at the public hearing.
I. STAFF RECOMMENDATION:
Staff recommends approval of the requested conditional use permit and
associated easement abandonment, subject to compliance with the comments and
conditions outlined in paragraphs D, E and F, and the staff analysis, in the agenda
staff report.
PLANNING COMMISSION ACTION: (DECEMBER 3, 2020)
The applicant was present. There were no persons present registered in support or
opposition. Staff presented the item and a recommendation of approval as outlined in the
“staff recommendation” above. There was no further discussion. The item was placed
on the Consent Agenda and approved as recommended by staff. The vote was 10 ayes,
0 nays and 1 absent. The application was approved.