Loading...
HomeMy WebLinkAboutResponse to Comments 11052020Memo To: Mr. Monte Moore City of Little Rock — Planning Department Date: 11 /5/2020 Re: The Grove at Old Oak — Preliminary Plat (S-1882) Mr. Moore, Please find the following response to staff comments: Planning — 1a) We have added the side building lines. 1 b) We have added the no access easement. 1 c) We have added the lot size to the plat. 1d) We have added the curve data to Old Oak Drive. 1 e) We have added the rear dimension to Lot 2. 2) We have expanded the building envelopes to the building lines. 3) We have added the variance to allow double frontage lots. Public Works — 1) Comment noted. 2) Comment noted. 3) Comment noted. 4) Comment noted. 5) Developer requests the sidewalk be located on the east side of Black Street. 6) The developer will reach out to staff on this issue. 7) Comment noted 8) The private streets will be 24' wide in a 45' access and utility easement. 9) The no parking area has been added. 10) The street has been revised to be less than 150' in length. 1 11) Comment noted. 12) Sketch grading and drainage plan will be provided under separate cover. 13) Comment noted. 14) Comment noted. 15) Comment noted. 16) Comment noted with the developer. 17) Comment noted. 18) Comment noted. 19) Old Oak Drive will be connected to Black Street. 20) Comment noted. 21) The no access easement has been added. 22) Comment noted. 23) Comment noted. 25) Comment noted. 26) Comment noted. 27) USPS mailbox has been added. 28) Storm Drainage Analysis has been added. 29) Water courses leaving the tract have been added. 30) Comment noted. 31) The gate with Knox Box has been added to the east end of Old Oak Drive. 32) Comment noted. Fire Dept.- 1) Comments noted. Landscape- 1) No response required. Solid Waste - 1) Comment noted. 2) Comment noted. 3) Comment noted. 4) Comment noted. Should you need anything additional else to close this project out, please let me know. Thanks, Brian Dale L • Page 2