Loading...
HomeMy WebLinkAboutResponse to Comments 101121City of Little Rock Planning and Development Planning Commission Hearing/May 13, 2021 Applicant Comments for Proposed Development Applicant Responses are due nā‘ later than Tuesday, April 6, 2021. Please submit revised site plans, if applicable, along with any written responses. All documents should be submitted to this email address for review. RE: 5-1073-M (17500 Chenal Parkway) Development Comments: 1. Clearly label driveway widths at the property lines on a revised replat drawing and provide PDF. Central Arkansas Water: 1. There are two sewer easements labeled on Lot 2R. One of the easements is for water. Please verify water line easement and update label. 2. Add waterline easement 2001016502 on Lot 1R. 3. Provide 10-ft Utility Easement along ChenalParkway frontage. RE: G-23-476 (Immediately west of Riverfront Drive) Civil Engineering Comments: 1. This abandonment appears to include abandoning a portion of the recently constructed River Trail improvements at this location. This work was done with federal grant money and the right-of-way for the trail should not be abandoned. Staff cannot support it as proposed. The abandonment could be supported if the abandonment legal description was re -done to exclude the trail and begin west of the trail crossing. Central Arkansas Water: 1. Provide easement for water line in abandoned ROW as indicated. No objections from CAW. RE: Z-7091-C (810 Brookside Drive) Central Arkansas Water 1. A 54-inch water transmission line and an 8-inch water main run along the eastern portion of this property. An easement will be required for the water lines. Indicate easements on the survey and submit to CAW for approval. Any construction, including earthwork, over the transmission main will need to be coordinated with CAW.No objection to Rezoning. From: Brian Dale <bdale@joewhiteassociates.com> Sent: Friday, April 9, 20212:38 PM To: Morris, LaSonya M. <Imorris@littlerock.gov>; Joe White <jwhite@joewhiteassociates.com> Cc: Tamara Guffey<tguffey@joewhiteassociates.com> Subject: RE: Overdue Applicant Comments (3) Agenda Items (May) CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Ms. LaSonya, G-23-476 — We are working with public works on the river trail. The client prefers to close ALL of the right of way, and relocate the trail as required. We have provided CAW with the required easement, but we also intend to abandon the water main when the cul-de-sac is removed. Z-7091-C — CAW should have easements for their 54" water transmission line. If they can provide copies of the existing easements, we will gladly plot them up. I don't believe the title company has found any existing CAW easements for this property. I hope this helps. Have a wonderful weekend! Thanks, Brian R. Dale President JOE WHITE & ASSOCIATES INC. . CIVIL ENGINEERING - CONSULTING SERVICES- LAND SURVEYING 25 Rahling Circle, Suite A-2 Little Rock, AR 72223 Office: (501) 214-9141 Website: www.'oewhiteassociates.com