Loading...
HomeMy WebLinkAboutZ-8576-A Site Plan Ph 1 Revised 060921100'-0"100'-0"DOGGY DAYCARE10,000 SQ. FT.189FENCED AREALOT 7PHASE 1ROAD BED -FIRE DEPARTMENT ACCESSWATER LINE EASEMENTWATER LINE EASEMENTWATER LINE EASEMENTWATER LINE EASEMENTWATER LINE EASEMENTWATER LINE EASEMENTFUTURE R.O.W.FUTURE R.O.W.FUTURE R.O.W.100 YR. FLOODPLAINFLOODWAY100 YR. FLOODPLAINFLOODWAYFLOODWAYKANIS ROADLOT 9LOT 8LOT 725' FLOODWAY BUFFERDUMPSTER PAD W/WOOD ENCLOSURE15' SETBACK15' STREET BUFFERPHASE I SIGN- TEMPORARYKANIS ROAD (FUTURE)PHASE 1 -ASPHALT CONNECTIONSHEET #PAGE #OFDATE:SHEET TITLE:PROJECT #T - 2128 C 1.25/17/20212128A PROPOSED DEVELOPMENT FOR: PRASAD DEVELOPMENT ARKANSASLITTLE ROCK, SITE PLAN (PHASE I)REV: 6/9/2021COPYRIGHT, TBALITTLE ROCK, terryburruss 11912 KANIS ROAD, SUITE F-8 A r c h i t e c t (OFFICE) 501-376-3676 ARKANSAS, 72211 PLANNING and INTERIORS DESIGN (FAX) 501-376-3766 tbadesignplanning@sbcglobal.netSITE PLAN (PHASE I)SCALE: 1"=30'-0"PARKING REQUIREMENTS:DOGGY DAYCARE: 10,000 SQ.FT. -25PARKING PROVIDED: 25PARKING REQUIRED: 25CITY COMMENT RESPONSES:-SITE LIGHTING WILL BE LOW-LEVEL AND DIRECTEDAWAY FROM ADJACENT PROPERTIES-MAXIMUM BUILDING HEIGHTS: DOGGY DAYCARE: 27'-0" CLIMATE STORAGE: 20'-6" MIXED USE: 20'-6"-BUILDING FINISHES TO CONSIST OF: METAL SIDING WITH VERTICAL SHADOW LINES STONE VENEER WOOD TRUSSES AND TRIM-STREET BUFFER (6% AVERAGE DEPTH) = 15'-MIN. SIDE YARD SETBACK FOR EASTERN SIDE = 15'- NO BUFFER REQUIRED ON WESTERN SIDE-AN AUTOMATIC IRRIGATION SYSTEM TO WATERLANDSCAPED AREA WILL BE INSTALLED PERREQUIREMENTS-THE PROJECT WILL ABIDE BY CITY REQUIREMENTSFOR SCREENING REQUIREMENTS AND PERIMETERPLANTING STRIPS.- GREEN SPACE (8% OF VEHICULAR USE AREA): 4,011.8 SQ.FT. REQUIRED 4,105 SQ.FT. PROVIDED