Loading...
HomeMy WebLinkAboutvillas detention volume calculations prelimROSEMARY VILLAS AT CB3:K65HENAL STORMWATER DETENTION NORTH DRAINAGE AREAS DRAINAGE AREA 8.64 AC TC 10 MIN 25 YEAR INTENSITY 7.1 C(UNDEVEL) 0.55 FLOW(UNDEVEL) 33.7392 CFS C(DEVELOPED) 0.75 FLOW(UNDEVEL) 46.008 CFS DETENTION VOLUME 7361.28 CUBIC FEET USE DBL 72" PIPE X 130 LF = 7350.2 CUBIC FEET (CLOSE ENOUGH FOR PRELIMIANRY CALC) DRAINAGE AREA TO RAHLING ROAD BOX CULVERT (EXCLUDING FUTURE COMMERCIAL) DRAINAGE AREA 26.36 AC TC 30 MIN 25 YEAR INTENSITY 4.5 C(UNDEVEL) 0.55 FLOW(UNDEVEL) 65.241 CFS C(DEVELOPED) 0.75 FLOW(UNDEVEL) 88.965 CFS DETENTION VOLUME 42703.2 CUBIC FEET USE QUAD 72" PIPE X 380 LF = 42970.4 CUBIC FEET (CLOSE ENOUGH FOR PRELIMIANRY CALC) CHECK 20 MIN TC DRAINAGEAREA 26.36 AC TC 20 MIN 25 YEAR INTENSITY 5.6 C(UNDEVEL) 0.55 FLOW(UNDEVEL) 81.1888 CFS C(DEVELOPED) 0.75 FLOW(UNDEVEL) 110.712 CFS DETENTION VOLUME 35427.84 CUBIC FEET USE QUAD 72" PIPE X 315 LF = 35620.2 CUBIC FEET (CLOSE ENOUGH FOR PRELIMIANRY CALC) SUMMARY FOR NORTH BASIN, IF REQUIRED DOUBLE 72" PIPE X 130 LINEAR FEET PROVIDES ADEQUATE DETENTION VOLUME FOR SOUTH AND CENTRAL BASIN, WHICH COMBINE AT RAHLING ROAD BOX CULVERT QUAD 72" PIPE X 380 LINEAR FEET PROVIDES ADEQUATE DETENTION VOLUME THESE CALCULATIONS ARE PRELIMINARY AND INTENDED TO PROVE ONLY PROOF OF CONCEPT. FINAL CALCUATIONS WILL BE PROVIDED WITH GRADING AND DRAINAGE PLAN, PRIOR TO ANY CONSTRUCTION OR WORK ON THE SITE.