HomeMy WebLinkAboutZ-9621 Action Letter - Approved 102821Department of Planning and Development
723 West Markham Street
Little Rock, Arkansas 72201-1334
Phone: (501)371-4790 Fax: (501)371-4546
Jim Yega
Year indsey Architects
3416 Old Cantrell Road
Little Rock AR 72202
Date: 10/28/2021
Dear Mr. Yearn:
File No. Z-9621
Location: 31 Beverly Place
Planning
Development
Building Codes
Issue: Crossing platted front yard building_
Line and reduced side yard setback.
This is to advise you that in connection with your application, File No. Z-9621_, the following action was
taken by the Board of Adjustment at its meeting on October 21, 2021.
(m)
(n)
Approved the application as filed.
X _ Approved the application with conditions.
Denied the application.
Deferred the application to the meeting.
Withdrew the application.
See attached Board of Adjustment minute record for conditions.
Other:
If a variance application is approved by the Board of Adjustment, all permits necessary for the initiation of
work shall be obtained within two (2) years from the date of approval, unless an extension of time is granted
by the Board. Otherwise, the Board's approval of the application shall be considered void.
According to the City's Zoning Ordinance Section 36-70:
"Appeals from the decision of the Board of Adjustment shall be filed with the appropriate court of
jurisdiction. This filing must occur within thirty (30) calendar days of the action by the Board of
Adjustment."
If you have questions, please call me at (501)371-4864.
Sincerely,
r,4
D. Tracy Spil man, lhans Development Administrator
DTS/vh
OCTOBER 21, 2021
ITFM NO - 9
Z-9621
File No.: Z-9621
Owners: Andrew and Jenny Faulkner
Applicant: Yeary Lindsay Architects
Address: 31 Beverly Place
Legal Description: Lot 16, Beverly Place, Addition to the City of Little Rock, Pulaski
County Arkansas
Zoned: R-2
Present Use: Single-family Residence
Proposed Use: Single-family Residence
Variance(s) Requested: A variance is requested from the building line provisions of
Sec. 31-12 to allow a building addition which crosses a platted
front yard building line.
A variance is requested from the area provisions of Section
36-254 to allow a reduced side yard setback in the
R-2 district.
Justification: The applicant's justification is presented as per the attached
letter dated April 19, 2021.
STAFF REPORT
A. Planning and Development Civil Engineering Comments:
No Comments.
B. Buffering and Landscape Comments:
In October 2020 the City adopted the "Heights Landscape Design Overlay District,"
requiring installation of one tree per 40 linear feet of street frontage within the
Heights District Boundary, applicable to [among other types] residential
construction in excess of 600 square feet.
C. Building Codes Comments:
No Comments.
D. Staff Analysis:
The property at 31 Beverly Place is located in a predominantly R-2 zoned
neighborhood, within the Heights Landscape Design Overlay District. This overlay
district generally has no bearing on the subject variance requests.
1
OCTOBER 21, 2021
ITEM NO.: 9 (CON'T.
Z-9621
The subject property is located on the southeast corner of Beverly PI and Longfellow
Dr. The existing 2-story masonry home was home built in 1940 has undergone
various improvements throughout the years typical of the neighborhood.
The applicant is proposing renovations to the home including an addition to the
northwest side, new front porch, and extension on the west side that will also wrap
around the south and southwest sides of the house. A new pool and open structure
are also planned for the southeast portion of the property.
The additions and new development will be in compliance with the current code
requirements with the exception of the front porch and the west side of the addition
which will both cross a 30-foot platted building line. The site plan indicates that the
proposed front porch addition will cross the building line by 6-feet 6-inches, while the
west side of the addition will cross this same building line by approximately 4-feet.
The survey indicates that the lot is 100-feet in width which requires a minimum 8-
foot side yard setback. In the sites present condition this required setback width is
intact. However, the proposed addition on the south side of the home will expand
approximately 3-feet reducing the existing 8-foot setback to approximately 5-feet in
width.
Section 31-12(b) of the City s Subdivision Ordinance states, In those instances
where a recorded subdivision plat has established building setback lines in
accordance with this chapter variances of those lines shall only be granted by the
Board of Adjustment." The platted building setback for the subject property is
30 feet, the applicant is requesting that the porch addition be allowed to cross this
building line a maximum of 6-feet 6-inches. In addition, the applicant is requesting
that the west addition be allowed to cross the building line a maximum of 4-feet.
Section 36-254(d)(2) states "Side yard. There shall be a side yard set -back on each
side of the building having a width of not less than ten (10) percent of the average
width of the lot, not to exceed eight (8) feet." The applicant requests a variance to
allow an encroachment into the south side -yard setback.
Staff finds the requests to generally be in conformance with the development pattern
in this area, and based on the above assessment and analysis, finds the requested
variance to be reasonable.
If the Board approves the requested platted building line variance, the applicant must
then produce a one -lot replat reflecting the approved change. As such, the applicant
must also review filing procedures with the County Clerk's office to
determine if the replat will require a revised Bill of Assurance and respond as
necessary and appropriate, as part of said replat.
6
OCTOBER 21, 2021
ITEM NO.: 9 (CON'T.
E. Staff Recommendation:
Z-9621
Staff recommends approval of the requested front yard building line reduction from
30-feet to a minimum of 23-feet 6-inches to accommodate the front porch addition.
Staff recommends approval of the requested west building line reduction from 30-
feet to a minimum of 24-feet to accommodate the structures expansion.
Staff recommends approval of the requested side yard setback to a minimum of 5-
feet.,
The above Staff recommendations are subject to the submitted survey / site plan
sketch and required to meet the following conditions:
1. Completion of a replat reflecting the above -described building line change.
2. A building permit being obtained for all construction.
3. Install trees, if deemed applicable at the time of building permitting, in
accordance with Heights Landscape Design Overlay District requirements.
Board of Adjustment (October 21, 2021)
The applicant was present. There were no objectors present. Staff presented the item
and a recommendation of approval as outlined in the "Staff Recommendation". There
was no further discussion.
There was a motion to approve the application as recommended by staff. The motion
was seconded. The vote was 5 ayes, 0 nays and 0 absent.