Loading...
HomeMy WebLinkAboutriver_mtn_updateNove er 29 City of Little Rock Department of Planning &Development River Mountain Neighborhood Action Plan Review August 2002 Neighborhood Associations Pleasant Valley Property Owners Association Pleasant Forrest Property Owners Association Walton Heights-Candlewood Homeowners Association Steering Committee Nathan Culp Jerome Grismer Ken Grunewald Charles "Chip"Pruitt Shannon Quinn O.K.Robinson Patricia Summers Kathy Wells Craig Williams Planning and Development Brian Minyard Vince Hustead Table of C(;>ntents: P~re 1 Existing Conditions Future Land Use Plan 2 Land Use Plan Changes 2 Zoning Changes 2 Circulation changes 3 Parks and Open Spares 3 Housing 3 Socio-economic conditions 4 Crime 6 Building Permits information 7 Policy Plan Public Safety 9 Infrastructure 10 Traffic and Transportation 11 Sustainable Natural Environment 12 Parks and Recreation 13 Residential Development 14 Public Works Projects 15 Maps Study Area 39 Existing Land Use 41 Future Land Use 43 Future land Use (as amended 2003)45 Existing Zoning 47 Master Street Plan 49 Census Tracts 51 Parks and Recreation 53 Proposed Changes to Future Land Use Plan 55 Letters of Support 57 March 1998 River Mountain Neighborhood Action Plan 63 143 ,. RESOLUTION NO.------~ A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LITTLE ROCK,ARKANSAS IN SUPPORT OF THE RIVER MOUNTAIN NEIGHBORHOOD ACTION PLAN REVIEW. WHEREAS,the area residents and Neighborhood Associations fonned a Steering ..Committee to develop a neighborhood Plan;and WHEREAS,the residents and other "stakeholders"in the area participated in a public meetings to discuss and identify area concerns to include in the plan;and WHEREAS,After several months of work by the Planning Committee,a set of goals and objectives were developed and presented to the Neighborhood Associations, City Departments,Plans Committee of the Little Rock Planning Commission;and WHEREAS,this Plan (Goals and Objectives)provides a way for both neighborhood based groups and others working in and around the neighborhood to advance the desires and meet the needs of the residents; WHEREAS,comprehensive planning must include not only interests of the neighborhood immediately affected but the interests of the city as a whole;and WHEREAS,local government encourages and supports neighborhood-based coalitions that develop individual neighborhood organizations,articulate neighborhood views on community-wide issues,and facilitated the planning process;and WHEREAS,advocacy planning by neighborhoods is an acceptable and legitimate role fro citizens and professional planners. NOW,THEREFORE BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF LITTLE ROCK,ARKANSAS. SECTION 1.The Planning Commission of the City of Little Rock does support the vision and goals as expressed in the River Mountain Neighborhood Action Plan Review. ADOPTED: CHAIRMAN RESOLUTION NO.11,403 A RESOLUTION OF THE ;BOAM)OF DIRECTORS OF THE CITY OF LITTLE ROCK,ARKANSAS IN SUPPORT OF THE RIVER MOUNTAIN NEIGHBORHOOD ACTION PLAN REVIEW. WHEREAS,the area residents and Neighborhood Associations formed a Steering Committee to develop a neighborhood Plan;and WHEREAS,the residents and other "stakeholders"in the area participated in a public meetings to discuss and identify area concerns to include in the plan;and WHEREAS,After several months of work by the Planning Committee,a set of goals and objectives were developed and presented to the Neighborhood Associations,City Departments,Plans Committee of the Little Rock Planning Commission;and WHEREAS,this Plan (Goals and Objectives)provides a way for both neighborhood based groups and others working in and around the neighborhood to advance the desires and meet the needs of the residents; WHEREAS,comprehensive planning must include not only interests of the neighborhood ±mmediately affected but the interests of the city as a whole;and WHEREAS,local government encourages and supports neighborhood-based coalitions that develop individual ,neighborhood organizations,articulate neighborhood views on community-wide issues,and facilitated the planning process;and WHEREAS,advocacy planning by neighborhoods is an acceptable and legitimate role for citizens and professional planners. NOW,THEREFORE BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF LITTLE ROCK,ARKANSAS. SECTION 1.The Board of Directors of the City of Little Rock does support the vision and goals as expressed in the River Mountain Neighborhood Action Plan Review. ADOPTED: \ Preface In May of 1997,city staff contacted the Neighborhood Associations of Pankey,Pleasant Forest,Pleasant Valley,Walton Heights,Westbury,and Westchester/Heatherbrae to develop the original River Mountain Neighborhood Action Plan.Informational meetings were held in the summer of 1997 and the formation of the neighborhood action plan began in August.In November of 1997 a town hall meeting was held to approve and make final adjustments to the plan,which was adopted by Board of Directors Resolution in May 1998. In the Fall of 2001,city staff commenced research for the plan update and contacted the previously mentioned neighborhood associations for the three-year review.The Planning and Development Department surveyed other departments and conducted field studies to gather information to present to the review committee.Staff also reviewed building permits,zone changes and land use plan amendments filed for the study area within the past three years. The first review meeting was held in November 2001 followed by a series of informational meetings focused on providing the committee members an over-view of city activities that took place in the study area within the past three years.The next set of meetings revolved around discussions of Goals and Objectives to determine if goals have been met,goals that have not been met,and goals that were no longer relevant. Major concerns expressed by the review steering committee were: Enforcement of the Highway 10 Design Overlay District. Preservation of natural landscaping and ecology. Preservation of topography. -Traffic Calming and limitation of curb cuts. Since the committee has not adopted new goals,staff has not requested a new resolution for the plan update. Page 1 River Mountain Neighborhood Action Plan Review 2002 Existing Conditions: Future land Use Plan The Future Land Uses shown for the River Mountain area remains basically the same since 1997 with the exception of two Land Use Plan amendments.The first change occurred on April 20,1999 with multiple changes from Single Family and Low Density Residential to Commercial,Office,Multi-Family and Park/Open Space at Cantrell and Black Road.The second Land Use Plan amendment occurred on July 17,2001 with a change from Single Family to Park/Open Space to recognize Pankey Park which was linked to a zoning application in which all city parks were rezoned to PR -park and Recreation. Proposed Future land Use Changes The focus of the Steering Committee centered on preservation of the natural features of the study area,especially within the Cantrell Road!Highway 10 Corridor.The residents of the area support land use categories designed to encourage the use of Planned Zoning Districts to allow greater review of proposed developments and insure the enforcement of the Highway 10 Design Overlay District and to protect existing topography,topsoil,and vegetation.Members of the Steering Committee wish to limit new commercial developments on Cantrell Road.They also wish to prevent soil erosion and silting by supporting land uses that have a minimal impact on the local environment.The proposed changes are shown on a map on page __ Zoning Changes Zoning in the study area has remained stable.Most of the zoning changes in the study area have involved Planned Zoning Developments for Office uses along Cantrell Road in areas shown as either Transition or Office.Most of the zoning changes affecting the River Mountain study area have occurred outside the study area on Cantrell Road at Ranch Drive.The chart below show the results of the zoning changes. Zoning Changes #0-3 General Office 2 MF-12Multi-Family 1OSOpenSpace1 Parks 1AFAgricultural!Forestry 1 ConditionalUsePermits # MF-6Multi-Family 1R-2 Single Family 3 PlannedZoningDevelopments # PlannedOfficeDevelopment 5PlannedCommercialDevelopment2 PlannedDevelopment-Office 2PlannedDevelopment-Commercial 3 PlannedDevelopment-Residential (Revocation)1 Master Street Plan Page 2 River Mountain Neighborhood Action Plan Review 2002 The Master Street Plan for the study area has had minor changes since the last plan.a change to the plan included the removal of Rivercrest as a Collector.The Pebble Beech collector has been connected to Rahling Road.The rest of the area remains unaltered. Improvements to the street system in the past three years include culvert rehabilitation on Hinson at EI Dorado and sidewalk improvements on Hinson Road from Beckenham Street to Hickory Circle Drive.Public Works reported that the intersection at Rodney Parham and Woodland Heights received improvements to improve traffic flow through that intersection.Other street improvements included Jerry Drive from Shepherd Drive to Jerome Drive,Jerome Drive from Jerry Drive eastward for 800 feet,and Shepard Drive from Taylor Loopio Shepherd Court.The Board of Directors cancelled the Rodney Parham street improvements from Hinson Road to Woodland Heights at the request of area residents. The Central Arkansas Transit System (CATA)no longer provides regularly scheduled bus service for the area. Parks and Open Space The Parks and Recreation Department is developing the River Mountain Road along the bank of the Arkansas River as a conservation area that includes a 12-foot wide bike path.The 2001 Little Rock Parks and Recreation Master Plan show this route as the "Take it to the Edge Trail."The path will serve as a spine in a chain of parks linking downtown Little Rock and Pinnacle Mountain State Park.In addition,this trail serves as a component in the loop of trails the Parks and Recreation Department proposes to develop along the edges of the city.The major obstacle in this development will be the crossing of the Little Maumelle River.The Parks and Recreation Department has not developed a system of mountain bike trails proposed for the area.A 617-acre park is proposed to be located on Garrison Road intended to serve the needs of the western portion of the city. There is one developed public park located in the area.It is the size of approximately one block and is located on Russ Street in the Pankey community.There is an undeveloped park,the River Mountain Park in the Walton Heights area (378.0:!:acres), which The 2001 Little Rock Parks and Recreation Master Plan shows as an undeveloped Large Urban Park. Housing The River Mountain study area experienced an increase in the number of renter occupied housing.The 1990 Census indicated 3,876 housing units located in the area and 95.4%of those units were occupied.A recent GIS inventory indicated that there Page 3 River Mountain Neighborhood Action Plan Review 2002 are currently 4,216 housing units located in the area.1 Based on the Census and GIS data,the number of housing units in the area grew by 9.7 %with 340 units added.2 The 2000 Census indicated 95%of the units in River Mountain were occupied.In 1990, 56%of the household units are owner occupied throughout Little Rock,while in the River Mountain area,72.7%of the units are owner-occupied.In 2000 the percentage of owner occupied units increased from 56%to 57.4%,while in River Mountain the percentage of owner occupied units decreased from 72.7%to 64%.The increase in renter occupied units can be attributed to the construction of apartments. The number of occupants per unit remained stable.Owner-occupied units in 1990 had an average of 2.83 persons per unit,while there were 1.92 persons per rental unit.In 2000,owner-occupied units had an average of 2.65 persons per unit,while there were 1.9 persons per rental unit.Using the drive by or "windshield"survey method,the housing units through out the area was determined to be in satisfactory condition,with most conditions remaining the same at the time of the plan update.The area of Pankey does have some units that are substandard. Tenure City of Little RockRiver Mountain 1990 Rent 44%27.3% Own 56%72.7% 2000 Rent 42.6%36% Own 57.4%64% Socio-Economic Conditions Population The combined population in the study area for the year 2000 population was approximately 12,573 residents.In 1990,the population for the study area was 9,548. The population of the study area increased by 3,025 residents (25%)between the 1990 and 2000 census,while the City of Little Rock grew by 1.8%. Race Year 1990 White 8,804 (92.2%) Black 575 (6%) Other 169 (1.8%) Total 9,548 1 Census Data for Block Groups and Blocks were not available.Census Tract 42.09 covers 82%of the study area.Census data for housing was not available at the Block and Block Group levels. 2 Ibid. Page 4 River Mountain Neighborhood Action Plan Review 2002 2000 10,963 (87%)976 (8%)637 (5%)12,573 Overall,the numbers of all races in the study area increased with the largest percentage of increase gained by Other races.The next largest population gain for the study area was the increase in the Black/African American population.The population of Whites living in the area increased in numbers but decreased in percentages.In 1990,Whites made up 92.2%of the area population with 8,804 residents while in the 2000 census the percentage of Whites decreased to 87%of the population but increased in population to 10,963 residents.The White population for the city decreased by 12%.In the 1990 census,Black/African Americans made up 6%of the area population with 575 residents while in the year 2000 Black/African Americans increased up to 8%of the population with 976 residents.Black/African Americans grew by 401 residents with an increase of 70%while the Black population for the city increased by 16%.In 1990 Other races,including Asians and Native Americans,made up 1.8%of the area population with 169 residents while in the year 2000 other races consisted of 5%of the population with 637 residents.Other races tripled in growth with the addition of 468 residents or by 277%.Citywide,the population for other races grew with an increase of 71%. Year 1990 2000 17 and under 2,404 (25.1%) 2,942 (23.4%) 18-64 6,471 (67.8%) 8,282 (65.9%) 65 and over 673 (7.0%) 1,349 (10.7%) The 2000 census shows a slight increase in age for the residents of the study area. The 1990 census data revealed that persons ages 18-64 made up 67.80%of the population with 6,471 residents.By 2000,persons ages 18-64 increased by 1,804 to 8,275 but decreased to 66%of the population.In 1990,persons in the less than the age of 18 made up 25.20%of the population with 2,404 residents.By 2000 persons less than the age of 18 increased by 479 residents to 2,883 but decreased to 23%of the population.In 1990 persons over the age of 65 consisted of 7%of the population with 673 residents.By 2000 persons aged 65 and over increased by 706 residents to 1,379 with an increase to 11 %of the population.The population of all age groups increased in population but the population of residents aged 65 and over experienced the greatest increase in the percentage of the population. Income 3 Census Data for Block Groups and Blocks were not available.The information was based on estimates based on data available at the Census Tract level. Page 5 River Mountain Neighborhood Action Plan Review 2002 The annual household income ranges included in the 1990 census range from less than $5,000 to over $150,000.The percentages of the Household Annual are as such:46% make less than $50,000,50%make between $50,000 and $100,000,while 4%make more than $100,000. Annual household income data from the 2000 census are not yet available at the Census Tract level at the time of printing.The available data at the time of the plan update provides the annual income data for the City of Little Rock.The annual household income ranges included in the 2000 census range from less than $5,000 to over $150,000.The percentages of the Household Annual Income data for Little Rock can be broken into three groups with 63.8%making less than $50,000,28.8%making between $50,000 and $100,000,while 7.3%make more than $100,000.Based on the percentages found in the 1990 census,the household income levels for the study area should be higher than the rest of the city.Since the population of the area increased,it is likely that the number of residents of in each income group may have increased. Crime The River Mountain review committee examined three types of crime.The first category of crime consists of Part I offences that are reported to the FBI by the Little Rock Police Department.The second category of crimes discussed involves some form of substance abuse.The category of crimes examined is categorized by the Police Department as Criminal Mischief,which includes reported incidents of vandalism. Part I Offences Crimes Against Persons Crimes Against Property 1998 -1999 53 305 1999 -2000 75 401 2000 -2001 58 298 The Part I offences includes crimes that are committed against persons and property. Crimes against persons reported in the past three years included multiple forms of Aggravated Assault,Assault I Simple,Domestic Disturbance,Rape and Terror Threats. No incidents of homicide or suicide were reported in the time period covered by this study.Crimes against property reported in the past three years included multiple forms of Arson,Breaking and Entering,Burglary,Larceny,Robbery,Shoplifting,and Vehicle Theft.During the first year of the study a total of 358 Part I Offences was reported to the Police Department.Crimes against persons made up 14.8%of Part I Offenses reported.85%of the Part I Offenses involved crimes against property.During the second year Part I Offences increased by 24.8 %for a total of 476 reported incidents. During the third year the number of Part I Offences decreased by 25.3%for a total of 356 Part I Offences reported.By June of 2001 Part I Offences reported retuned to about the same level as the number of incidents reported for the first year. Substance Abuse Narcotics Offences Public Intoxication 1998 -1999 o o 1999 -2000 1 o 2000 -2001 3 o Page 6 River Mountain Neighborhood Action Plan Review 2002 Crimes involving substance abuse involve Narcotics Offences and Public Intoxication. The occurrence of reported Narcotics Offenses within the study area is very low even though such incidents are on the rise.There were no Narcotics Offences reported for the first year,one offence during the second year and three reported during the third year.There were no reported incidents of Public Intoxication reported in the study area. However,if an arrest is made,the Police Department will keep a record of the most serious charge when entering reported incidents into the crime analysis database. Criminal Mischief: (Includes Vandalism) 1998 -1999 7 1999 -2000 13 2000 -2001 2 Criminal Mischief covers a variety of crimes including vandalism.Seven reported incidents of Criminal Mischief were reported during the first year of the study.During the second year reported incidents of Criminal Mischief increased by 53.8%for a total of 13 reported incidents.During the third year covered by this study,reported incidents of Criminal Mischief decreased by 84.6%for a total of two reported incidents. Building Permits Information Building Permits Type #ave sq.ft.ave $total $ Accessory 10415.4046,847.5068,475.00 Commercial 126,400.00792,000.00792,000.00 Multi-Family 1*6,755,552.00 6,755,552.00 Office 620,763.29937,037.005,622,222.00 Institutional 46,431.675475,500.001,902,000.00 SingleFamily 2193,324.476210,163.4246,025,788.00 Total:9,147,099.92 Renovations Type #ave SQ.ft.ave $total $ Accessory 1*1,800.001,800.00 Commercial 7*16,714.71117,003.00 Industrial 1*85,000.0085,000.00 Multi-Family 2*20,000.0040,000.00 Office 14*235,234.293,293,280.00 Institutional 5*262,300.001,311,500.00 SingleFamily 124*26,933.123,339,707.00 Total:647,982.00 4 Data available for only 3 permits 5 Data available for only 3 permits 6 Data available for only 95 permits Page 7 River Mountain Neighborhood Action Plan Review 2002 Additions Type #ave SQ.ft.ave $total $ Accessory 13277.75711,341.15147,435.00 Office 1*94,000.0094,000.00 Institutional 6*256,499.671,538,698.00 SingleFamily 634,335.00843,978.292,770,632.00 Total:405,819.11 Demolitions Type Single Family # 7 sq.ft.*$* •=Data not available 7 Data available for only 6 permits 8 Data available for only 9 permits Page 8 River Mountain Neighborhood Action Plan Review 2002 Policy Plan: Public Safety goal:Assure that Crime and safety issues in the neighborhoods be aggressively dealt with by city government. Objectives: •Reduce speeding and incidents of vandalism in the area through police vigilance and enforcement. •Explore and implement new technologies used for efficient law enforcement and records keeping. Actions: •Increase police enforcement of speed limits on residential streets,especially on cut-through streets:Pleasant Forest Drive,Sierra Forest Drive,Arkansas Valley, Hidden Valley -High Priority •Establish a policy to have citizens make the police department aware of problem areas and request an increase of patrol officers in the area. •Request more frequent police presence to prevent vandalism in the area. Painted lines on street do not slow traffic.Traffic circles do slow cars. Page 9 River Mountain Neighborhood Action Plan Review 2002 Infrastructure goal:Have an adequate infrastructure network,including sidewalks, roadways,and drainage systems,within the neighborhood which is designed and works to produce a safe and attractive neighborhood environment. Objectives: •Encourage placement of sidewalks on all neighborhood streets. •Ensure that roads are improved in a manner that is supportive of all modes of transportation (walking,cycling,automobile,public transit and truck)and help to minimize the conflicts between the various modes. •Identify and construct neighborhood curb and gutter needs. Actions: •Correct the flooding and drainage problems in the Piedmont and Pankey areas. •Correct the sight distance problems by clearing R-O-Won Pleasant Ridge Road between Green Forest and Cedar Branch to improve the visibility triangle at these locations -High priority •Install curb and gutter on Fairview Road -Low priority •Install sidewalks on the north side of Cantrell Road from Rodney Parham to Highway 300 -low priority •Install street lamps on Hinson Road from Napa Valley Drive to Taylor Loop Road. •Install street lamps on Old Oak Drive from Hinson Road to Old Oak Circle. Silting is a problem in Piedmont Lake. due to upstream erosion. Visibility is a problem at Fairview Road and Sierra Forrest Drive. Page 10 River Mountain Neighborhood Action Plan Review 2002 Traffic &Transportation goal:Ensure safe and efficient movement of pedestrian, bike and vehicular traffic in,around,ant through the neighborhood. Objectives: •Examine appropriateness of traffic calming devices on residential streets and determine which areas need such devices with the goal of placing such devices at locations where they are most needed -High priority •Study the traffic flow with the goal of improving traffic flow and safety on streets where such improvements are needed -High priority •Reduce the amount of cut-through traffic on local streets -High priority Actions: •Adjust timing of traffic light at Rodney Parham and Cantrell Road. •Conduct a joint City and State Highway Department Study for signalization of Cantrell Road. •Explore possibility of installing traffic calming devices. •Install flashing lights to warn motorists of pedestrians in Pankey. •Reconstruct Taylor Loop Road from Hinson Road north to Cantrell Road as a 4- lane minor arterial. •Amend the Master Street Plan to allow South ridge Drive to remain at current width -High priority •Amend the Master Street Plan to realign Pleasant Ridge Road with South ridge Drive -High priority •Widen Pinnacle Valley Road to a 36 foot 2-lane road. •Work with Public Works and AHTD to redesign on and off ramps at 1-630/1-430. •Work with Public Works Department to implement traffic calming tactics on Hidden Valley,Sierra Forest Drive,and Rocky Valley Drives. •Work with Public Works Department to explore not allowing a left turn onto Rocky Valley drive from Rodney Parham Road.A suggestion is a raised median, possibly with planter,in the already striped median area. •Work with Public Works to implement traffic calming tactics on South ridge Drive, Sierra Forest Drive and Pleasant Forest Drive -High priority •Work with Public Works to reduce cut-through traffic on Shepherd Drive,sierra Forest Drive and Pleasant Forest Drive -High priority• Shared driveways (reduced number of curb cuts)are one tool to improve traffic flow. Page 11 River Mountain Neighborhood Action Plan Review 2002 Sustainable Natural Environment goal:to conserve and improve the natural environment for this and future generations so that it will sustain life,maintain health and provide an improved quality of life. Objectives: •Encourage the development of new approaches to park and open space. •Ensure that significant environmental features and functions are preserved and have any damages remedied,for example,Piedmont Lake. •Preserve and maintain existing greenways and open spaces in the neighborhood. •Promote vigorous enforcement of Landscaping &Excavation Ordinance. Actions: •Preserve and keep in its natural state,the Pleasant Valley green belt along Hidden Valley Drive.Do not concrete creek,preserve it in an ecological manner. •Preserve Grassy Flat Creek in its natural state.IF action is required to control flooding or severe erosion,work with the Pleasant Valley Property Association to look for solutions that will maintain the creek in its most natural state possible. Any action required will be done in the most ecologically sensitive manner possible and will never involve concreting the creek banks and bottom. •Preserve the Highway 10 Design Overlay District. •Vigorously enforce the ordinance for hillside protection. •Vigorously enforce the ordinance for the preservation of trees. •Work with Parks and Recreation to develop the Penal Farm into an Eco- educational Park. Converting Grassy Flat Creek to a concrete culvert is not acceptable. Any improvements to Grassy Flat Creek should be ecologically sensitive. Page 12 River Mountain Neighborhood Action Plan Review 2002 Parks and Recreation goal:to design spaces that meet both the group and solitary recreational needs of residents. Objectives: •Support the implementation of the Little Rock Parks and recreation Master Plan of 2001 •Provide active park facilities in and near the neighborhood. •Provide passive park facilities in and near the neighborhood. Actions: •Work with Parks and Recreation to develop a passive park at the Pankey Community Center. •Expand the existing city park in Pankey located on Russ Street with additional passive activities. •Work with Parks and Recreation to develop a major city park in west Little Rock. ~,~ Pankey Community Center should be completed Both the community center and Pankey park should provide active and passive uses. Page 13 River Mountain Neighborhood Action Plan Review 2002 Residential Development goal:To promote and integrated community structure and design that provides a unique,healthy,and safe urban living environment. Objectives: •Develop Neo-traditional neighborhoods (pedestrian and bicycle friendly neighborhoods,which are less dependent on automobiles),in areas that have not yet developed. •Monitor Low-Income housing and publicize compliance with rental inspections, etc Actions: •Conduct a study of the Land Use Plan with residents for the Pankey Community. •Enforce the construction of sidewalks with all types of development. •Insure the physical continuity of sidewalks so that sidewalks built on the same side of the street connect without gaps and that sidewalks built on opposite sides of streets are connected with ADA accessible crosswalks. •Enforce all developing subdivisions to install curb and gutter. •Require developers to install underground utilities in all new subdivisions. •Require street lighting be in place in new subdivisions at the time streets are opened. •Monitor low-income housing,publicize compliance with rental inspections,etc to maintain higher standards of housing stock in the area. New housing in the Pebble beech area has sidewalks and curb and gutter. These new houses on Gooch Road lacks curb and gutter and sidewalks. Page 14 River Mountain Neighborhood Action Plan Review 2002 The committee accessed various infrastructure projects from a list below provided by the Public Works Department.Particular projects were rated either high or low priority. All other projects were rated medium.Projects were added to the list by the committee members. PROJECT PROJECT PROJECT NAME PROJECT IDENTIFICA TYPE LIMITS TION MASTER ESTIMATED PROPOSED Neighborhood STREET PLAN COST plus DESIGN TYPE Priority CLASSIFICA TI Contingency ON SP0298000 SPECIAL SP1159000 SPECIAL SP1158000 SPECIAL CANTRELL RD. (ST.HWY 10)@ PINNACLE VALLEY &PINE MOUNTAIN CANTRELL RD. (ST.HWY 10)@ PLEASANT RIDGE RD. CANTRELL RD. (ST.HWY 10)@ RODNEY PARHAM SIGNALIZATI Arterial ON (1999 PRIORITY 17) Arterial Arterial $156,250 $187,500 NA SIGNALIZATION HIGH UPGRADE; AHTD COORDINATION WITH INTERSECTION IMPROVEMENTS SIGNALIZATION HIGH (AHTD COORDINATION) SIGNALIZATION HIGH UPGRADE; AHTD COORDINATION WITH INTERSECTION IMPROVEMENTS AND PAVEMENT MARKINGS HIGH Suggest raised median on Rodney Parham Drive to prohibit left hand turns. HIGH TRAFFIC CALMING SIGNALIZATION & INTERSECTION IMPROVEMENTS $125,000 $437,500 $187,500 SIGNALIZATION HIGH UPGRADE; AHTD COORDINATION WITH INTERSECTION IMPROVEMENTS SIGNALIZATION HIGH UPGRADE; AHTD COORDINATION WITH INTERSECTION IMPROVEMENTS $1,375,000 If CHANNEL &HIGH This done in an STRUCTURES should be done ecologically IMPROVEMENT in an ecologically sensitive sensitive manner,this manner. dollar amount would be different since it would be a different project. NAResidential Arterial Arterial NEW SIGNAL Arterial (1999 PRIORITY) DR#401 & 501 SP1174000 SPECIAL HIDDEN VALLEY DR.&ROCKY VALLEY DR. SP1157000 SPECIAL CANTRELL RD. (ST.HWY 10)@ TAYLOR LOOP- WEST INTERSECTION DR1060000 DRAINAGE GRASSY FLAT DRAIN SP0325000 SPECIAL HINSON RD.@ JENNIFER SP0304000 SPECIAL CANTRELL RD. (ST.HWY 10)@ TAYLOR LOOP- EAST INTERSECTION Page 15 River Mountain Neighborhood Action Plan Review 2002 SP1175000 SPECIALHINSON RD.@ ArterialNASIGNALIZATIONHIGH PEBBLEBEACHadded PLEASANT implement trafficHIGH FORESTDR. calming devices SP1191000 SPECIALRIVER ...NASTREET LIGHTHIGH MOUNTAIN (ILLUMINATION) ACTIONPLANadded ROCKY VALLEY reduce cut-HIGH DR. through traffic from RoadneyParhamtoHiddenValley SP1176000 SPECIALCANTRELL RD.ARTERIAL INAINTERSTATE,LOW (ST.HWY10)@ INTERSTATEADDSTACKING 1-430 (AHTD)INDICATORS INTERCHANGE FOR WESTBOUND;AHTDCOORDINATION ST4444000 STREET &CAPECOD CT.Pebble Beach Residential$9,500Street&Drain;LOW DRAIN- Dr.,S.E.to -Repair &Overlay LOCAL End (Inc.Cul- de-Sac)ST0145000 STREET &FAIRVIEW RD.PLEASANTResidential$703,125Street&Drain;LOW DRAIN- RIDGE@ Reconstruction LOCAL FAIRVIEW- CEDARBRANCH,SUMMIT RD.,TON.INTERSECTIONPLEASANTRIDGE(On1999ProposalasCedarBranchtoPleasantRidge)ST5325000 STREET &FAIRVIEW RD.WoodlandCollector$18,625Street&Drain;LOW DRAIN Heights Repair &Overlay Intersection,W.529'toW.Sd.Fairview@PleasantRidgeInter.ST6165000 STREET &JEROME DR.East to EndResidential$16,075Street&Drain;LOW DRAIN- Unimproved Repair &Overlay LOCAL #14401,S.E. thru BubbleCul-de-Sac toOldOakDr. ST6167000 STREET &JERRY DR.Residential$543,750Street&Drain;LOW DRAIN- Reconstruction LOCAL ST8491 000 STREET &SHEPARD DR.E.SideResidential$11,650Street&Drain;LOW DRAIN- Longtree Dr.,Repair &Overlay LOCAL E.285'to Bridge then181'toEnd Page 16 River Mountain Neighborhood Action Plan Review 2002 ST8492000 STREET &SHEPARD DR.Old Oak Dr.,Residential$17,675Street&Drain;LOW DRAIN- S.E.-Repair &Overlay LOCAL ShepardHilis CUCv,toE.Sd.LongTreeDr.ST8493000 STREET &SHEPARD DR.14508Collector$24,475Street&Drain;LOW DRAIN Shepard,W.Repair &Overlay thru-ShepardCt.,SouthPointCt.,to OldOakDr.SP1300000 SPECIALACCESS ALL$1,562,500ACCESSRAMPMEDIUM RAMPS- RETROFIT CITYWIDEST3702000 STREET &AGATE CV.Garnet Ct.,Residential$8,150Street&Drain;MEDIUM DRAIN- S.E.to -End Repair &Overlay LOCAL (Inc.Cul-de- Sac)ST3764000 STREET &AMBER CT.Pleasant View Residential$7,450Street&Drain;MEDIUM DRAIN- Dr.,S.to-Repair &Overlay LOCAL End (Inc.Cul- de-Sac)ST3776000 STREET &ANDERSON DR.RodneyResidential$150,875Street&Drain;MEDIUM DRAIN- Parham Rd.,Repair I LOCAL East thru Rehabilitation of Median242' Slabs,Joints, then75'to Drainage &Base EndTaper-Kent toPleasantValleyFarmRd.DR1027000 DRAINAGE ANNUAL$150,000...NA DRAINAGE,MEDIUM DRAINAGE AVG.PER MINOR REPAIR-WARDWARDPER SHARES OF YEAR $10,000,000 ON ($1,050,000 TEN YEAR PLAN PER YEAR TOTAL)ST3852000 STREET &ARKANSASRodneyCollector$14,475Street&Drain;MEDIUM DRAIN VALLEY DR.Parham@ Repair &Overlay Shackleford,N.thru TapertoN.SideYosemiteValleyST3937000 STREET &BAINBRIDGE DR.Larkin,S.E.to Residential$87,125Street&Drain;MEDIUM DRAIN- -End (Inc.Repair &Overlay LOCAL Cul-de-Sac) ST3938000 STREET &BAINBRIDGE DR.ResidentialStreet&Drain;MEDIUM DRAIN- Repair &Overlay LOCAL ST3946000 STREET &BANFIELD LN.Residential$46,856Street&Drain;MEDIUM DRAIN- Repair I LOCAL Rehabilitation of Slabs,Joints,Drainage &Base ST4008000 STREET &BATTLE ST.RodneyResidential$18,000Street&Drain;MEDIUM DRAIN- Parham,N.to Repair &Overlay LOCAL -End Page 17 River Mountain Neighborhood Action Plan Review 2002 ST4027000 STREET &BEARTREE DR.Cecil Dr.,S.Residential$50,469Street&Drain;MEDIUM DRAIN- thru DenOak Repair I LOCAL to -End Rehabilitation of Concrete Slabs,Joints, Drainage &Base ST4028000 STREET &BEARTREE DR.End Concrete Residential$25,375Street&Drain;MEDIUM DRAIN- S.Sd.DenOak,Repair &Overlay LOCAL S.143'- Charwick,HoneyBearDr/Cl.toHinsonRd. ST4056000 STREET &BEESON CT.Cecil Dr.,N.Residential$20,506Street&Drain;MEDIUM DRAIN- to -End (Inc.Repair I LOCAL Cul-de-Sac)Rehabilitation of Slabs,Joints,Drainage &Base ST4072000 STREET &BENT TREE CT.Bent Tree Dr.,Residential$48,906Street&Drain;MEDIUM DRAIN- S.w.183'Rehabilitation LOCAL from BentTree Curbs,Drainage, Dr.to111' Street As Needed Cone.Bridge,then 15'toCul-de-SacEndST4074000 STREET &BENT TREE DR.Hinson Road,Residential$117,500Street&Drain;MEDIUM DRAIN- SW.then Rehabilitation LOCAL NW.to -End Curbs,Drainage, (Inc.Cul-de- Street As Needed Sac)ST4124000 STREET &BLACK BEAR CT.HoneyBearResidential$13,675Street&Drain;MEDIUM DRAIN- Dr.,S.to-Repair &Overlay LOCAL End (Inc.Cul- de-Sac)ST4125000 STREET &BLACK BEARSecluded Hills Residential$13,450Street&Drain;MEDIUM DRAIN- DR.Dr.,E.to-Repair &Overlay LOCAL End (Inc.Cul- de-Sac)ST4126000 STREET &BLACK BEAR ResidentialStreet&Drain;MEDIUM DRAIN- DR.Repair &Overlay LOCAL ST4242000 STREET &BRADBURY DR.Pebble Beach Residential$85,425Street&Drain;MEDIUM DRAIN- Dr.,S.,then Repair I LOCAL W.thru Rehabilitation of BanfieldLane Slabs,Joints, toEnd('91) Drainage &Base ST4258000 STREET &BRAZOSVALLEY WentwoodResidential$35,575Street&Drain;MEDIUM DRAIN- LN.Valley,w.-Repair &Overlay LOCAL Crestdale to - ArkansasValleyST4281000 STREET &BRIAR CT.RockyValley,Residential$3,575Street&Drain;MEDIUM DRAIN- North to-Repair &Overlay LOCAL End (Inc.Cul- de-Sac)ST4344000 STREET &BROWN BEARBlackBear Cl.Residential$17,825Street&Drain;MEDIUM DRAIN- DR.W.to-Repair &Overlay LOCAL HoneyBear Dr.To #14625 ST4372000 STREET &BUFF LN.RodneyResidential$8,875Street&Drain;MEDIUM DRAIN- Parham,West Repair &Overlay LOCAL to -Valley Club Cir. Page 18 River Mountain Neighborhood Action Plan Review 2002 ST4382000 STREET &BURNETT RD.N.Side ofResidential$281,250Street&Drain;MEDIUM DRAIN- Railroad at Reconstruction LOCAL New Section of PinnacleValleyRd.,N.E.to EndST4394000 STREET &BUTTERFIELDSamPeckResidential$23,225Street&Drain;MEDIUM DRAIN- LN.Rd.,East thru Repair &OverlayLOCAL Piedmont, SummerdaletoEndIncCul-de-Sac ST4437000 STREET &CAMEO DR.PleasantResidential$14,775Street&Drain;MEDIUM DRAIN- Forest Dr.,N.Repair &OverlayLOCALto-Curve@ Pleasant ViewDr. ST4439000 STREET &CANNON CT.Valley ForgeResidential$4,250Street&Drain;MEDIUM DRAIN- Dr.,S.E.to-Repair &OverlayLOCAL End (Inc.Cul- de-Sac)ST4440000 STREET &CANTERBURYWestchesterResidential$6,500Street&Drain;MEDIUM DRAIN- CT.Ct.,N.to-Repair &OverlayLOCAL End (Inc.Cul- de-Sac)SP1155000 SPECIALCANTRELL RD.ArterialNACROSSWALK&MEDIUM (ST.HWY10) FLASHERS; AHTDCOORDINATION SP1156000 SPECIALCANTRELL RD.RODNEYArterialNASIDEWALKSMEDIUM (ST.HWY10) PARHAM TO AND PED STATEHWY OVERPASS IN 300 VICINITY SIDEWALKS PANKEY;AHTD AND COORDINATION PEDESTRIAN OVERPASSINPANKEYAREAST0011000 STREET &CANTRELL RD.Arterial$8,750,000Street&Drain;MEDIUM DRAIN (ST.HWY 10)Reconstruction, Arterial AHTD SP0298000ASPECIAL CANTRELL RD.Arterial$562,500AHTDMEDIUM (ST.HWY10)@ COORDINATION PINNACLE WITH DRAINAGE VALLEY&PINE & MOUNTAIN INTERSECTION IMPROVEMENTSST4452000 STREET &CARMEL DR.Hinson Rd.,Residential$3,500Street&Drain;MEDIUM DRAIN- East 140'to -Repair &OverlayLOCALBeginPrivate Section(End'83)ST4453000 STREET &CARMELHinson Rd.,Residential$34,106Street&Drain;MEDIUM DRAIN- VALLEY LN.East thru Spy Repair I LOCAL Glass Lane-Rehabilitation of toEnd Slabs,Joints, Drainage &Base ST4477000 STREET &CASCADES DR.ValleyClubResidential$44,175Street&Drain;MEDIUM DRAIN- Cir,W-Repair &OverlayLOCAL E.lnter.Master s Cir.,thrucurveN.toW.lnterMasters Cir. Page 19 River Mountain Neighborhood Action Plan Review 2002 ST4487000 STREET &CECIL DR.E.SideResidential$121,338Street&Drain;MEDIUM DRAIN- Secluded Repair I LOCAL Hills,East thru Rehabilitation of BeesonCt., Slabs,Joints, BearTreeDr., Drainage &Base toOldOakDr.ST4488000 STREET &CECIL DR.S.Sd.#14801,Residential$85,956Street&Drain;MEDIUM DRAIN- S.-SemiCircle Repair I LOCAL CuldeSac,the Rehabilitation of nE.toE.Side Slabs,Joints, SecludedHills Drainage &Base ST4511000 STREET &CEDAR BRANCH PleasantResidential$8,200Street&Drain;MEDIUM DRAIN- CT.Ridge Rd.,Repair &Overlay LOCAL NW.thru CedarBranchDr.to End Inc.Cul-de-SacST4512000 STREET &CEDAR BRANCH Fairview Rd.,Residential$10,000Street&Drain;MEDIUM DRAIN- DR.West to-Repair &Overlay LOCAL Cedar Branch Ct.ST4559000 STREET &CHAPARRALWentwoodResidential$27,600Street&Drain;MEDIUM DRAIN- VALLEY DR.Valley,West Repair &Overlay LOCAL then North to - Platte Valley ST4569000 STREET &CHARWICK DR.Old Oak Dr.,Residential$16,788Street&Drain;MEDIUM DRAIN- West to -End Repair I LOCAL PPC Surface Rehabilitation of Slabs,Joints,Drainage &Base ST4570000 STREET &CHARWICK DR.End PPCResidential$7,275Street&Drain;MEDIUM DRAIN- Surface W.oc Repair &Overlay LOCAL OldOak,W.to -BearTreeDr.ST4621000 STREET &CHERRY CREEK PleasantResidential$15,900Street&Drain;MEDIUM DRAIN- CV.Forest Dr.,N.Repair &Overlay LOCAL to -End (Inc. Cul-de-Sac)ST4686000 STREET &CHIMNEYValley ViewResidential$45,900Street&Drain;MEDIUM DRAIN- SWEEP LN.Dr.,East thru Repair &Overlay LOCAL to Begin Circle,thruCircleBack toP.O.B.ST4693000 STREET &CHRISTOPHERSugarMapleResidential$7,425Street&Drain;MEDIUM DRAIN- CV.Lane,N.E.to Repair &Overlay LOCAL -End (Inc. Cul-de-Sac) ST4694000 STREET &CHRISTOPHER Residential$2,900Street&Drain;MEDIUM DRAIN- DR.Repair &Overlay LOCAL ST4697000 STREET &CIMMARRONShenandoahResidential$48,575Street&Drain;MEDIUM DRAIN- VALLEY CIR.Valley,thru Repair &Overlay LOCAL Oblong back toShenandoahValleyST4797000 STREET &COLUMBINE CT.ElDorado Dr.,Residential$3,700Street&Drain;MEDIUM DRAIN- S.to -End Repair &Overlay LOCAL (Inc. HammerheadCul-de-Sac) Page 20 River Mountain Neighborhood Action Plan Review 2002 ST4888000 STREET &CROCKETT RD.Cantrell -S.Residential$625Street&Drain;MEDIUM DRAIN- to End Repair &Overlay LOCAL Driveway ApronST5045000 STREET &DEN OAK DR.Residential$54,294Street&Drain;MEDIUM DRAIN- Repair I LOCAL Rehabilitation of Slabs,Joints,Drainage &Base ST5049000 STREET &DERRICK RD.Curve@Residential$102,500Street&Drain;MEDIUM DRAIN- Piggee,-S.Reconstruction LOCAL to End ST5116000 STREET &DUNBAR RD.Russ,West to Residential$109,375Street&Drain;MEDIUM DRAIN- -End of Reconstruction LOCAL Pavement (Derrick RIW)ST5117000 STREET &DUNBAR RD.Residential$99,063Street&Drain;MEDIUM DRAIN- Reconstruction LOCAL ST5153000 STREET &EDEN LN.Residential$14,275Street&Drain;MEDIUM DRAIN- Repair &Overlay LOCAL ST5154000 STREET &EDENFIELD CV.End Concrete Residential$91,719Street&Drain;MEDIUM DRAIN- N.of Pebble Rehabilitation LOCAL Beach,N.E.to Curbs,Drainage, -End(Inc. Street As Needed Cul-de-Sac) ST5155000 STREET &EDENFIELD CV.Residential$16,575Street&Drain;MEDIUM DRAIN- Repair I LOCAL Rehabilitation of Slabs,Joints,Drainage &Base ST5159000 STREET &EDGEMOND DR.Residential$22,950Street&Drain;MEDIUM DRAIN- Repair &Overlay LOCAL ST5169000 STREET &EL DORADO DR.Valley ClubResidential$76,525Street&Drain;MEDIUM DRAIN- Cir.,W.-Repair &Overlay LOCAL Greenview, Columbine,Doral to #94 (Beg.NewerPavement)ST5170000 STREET &EL DORADO DR.#94 (Beg.Residential$57,275Street&Drain;MEDIUM DRAIN- Newer Repair &Overlay LOCAL Pavement), W.thruLonglea,Portland,toHinsonRd.ST5329000 STREET &FAIRWAY DR.RodneyResidential$72,250Street&Drain;MEDIUM DRAIN- Parham@ Repair &Overlay LOCAL Happy Valley, W.-EastInter.wlValley ClubCir.,InvernesstoWestIntersectionwIValleyClubCir.ST5331000 STREET &FAIRWAYHinson Rd.,Residential$12,550Street&Drain;MEDIUM DRAIN- VILLAGE CT.East to -End Repair &Overlay LOCAL (Inc.Cul-de- Sac) Page 21 River Mountain Neighborhood Action Plan Review 2002 ST5405000 STREET &FLOURITE CT.PleasantResidential$14,250Street&Drain;MEDIUM DRAIN- Forest Dr.@ Repair &Overlay LOCAL GoldenOak, S.to -End(Inc.Cul-de-Sac)ST5406000 STREET &FLOURITE CV.Flourite Ct.,Residential$16,525Street&Drain;MEDIUM DRAIN- W.then S.to -Repair &Overlay LOCAL End (Inc.Cul- de-Sac)ST5435000 STREET &FOREST MAPLE Sam PeckResidential$7,425Street&Drain;MEDIUM DRAIN- CT.Rd.,S.E.to -Repair &Overlay LOCAL End (Inc.Cul- de-Sac)ST5438000 STREET &FORESlWOODSugarMapleResidential$8,025Street&Drain;MEDIUM DRAIN- CV.Lane,West to Repair &Overlay LOCAL -End (Inc. Cul-de-Sac) ST5574000 STREET &GARNET CT.PleasantResidential$10,375Street&Drain;MEDIUM DRAIN- Forest Dr.@ Repair &Overlay LOCAL Marble,S.to - End (Inc.Cul-de-Sac)ST5678000 STREET &GOLDEN OAKPleasantResidential$9,750Street&Drain;MEDIUM DRAIN- CV.Forest Dr.@ Repair &Overlay LOCAL Flourite,N.to -End (Inc.Cul-de-Sac)ST5727000 STREET &GREENDALE CT.Patriot Dr.,S.Residential$17,319Street&Drain;MEDIUM DRAIN- to -End (Inc.Repair I LOCAL Cul-de-Sac)Rehabilitation of Slabs,Joints,Drainage &Base ST5738000 STREET &GREENVIEW CT.ElDorado Dr.,Residential$3,700Street&Drain;MEDIUM DRAIN- S.to -End Repair &Overlay LOCAL (Inc. HammerheadCul-de-Sac)ST5813000 STREET &HARRIS RD.Cantrell-N.Residential$50,313Street&Drain;MEDIUM DRAIN- Past Stub for Reconstruction LOCAL DIW to #5211 HarrisST5814000 STREET &HARRIS RD.Residential$8,025Street&Drain;MEDIUM DRAIN- Repair &Overlay LOCAL ST5815000 STREET &HARRIS RD.Residential$41,563Street&Drain;MEDIUM DRAIN- Reconstruction LOCAL DR1064000 DRAINAGE HICKORY ...NADRAINAGEMEDIUM CREEK&BENT TREEDRAINAGE(LONGLEA)ST5954000 STREET &HINSON RD.Begin c1990Arterial$55,325Street&Drain;MEDIUM DRAIN (#14418)Cons Repair &Overlay 't.N.of Hickory CreektoTaylorLoopRd.IntersectionDR1066000 DRAINAGE HINSON RD....NADRAINAGEMEDIUM DRAINAGEDR1067000 DRAINAGE HINSON RD.,...NADRAINAGEMEDIUM PEBBLEBEACHI TAYLOR LOOPCREEK Page 22 River Mountain Neighborhood Action Plan Review 2002 ST5981 000 STREET &HONEY BEARBearTree Dr.,Residential$14,900Street&Drain;MEDIUM DRAIN- CT.E.to -End Repair &OverlayLOCAL (Inc.Cul-de- Sac)ST6072000 STREET &INVERNESS CIR.Valley ClubResidential$45,900Street&Drain;MEDIUM DRAIN- Cir.,W.thru Repair &Overlay LOCAL Doral,to- #39 InvernessDR1069000 DRAINAGE ISON CREEK ...NACHANNEL &MEDIUM CROSSINGS& STRUCTURES DRAIN,PANKEY IMPROVEMENT AREADR1070000 DRAINAGE ISON CREEK ...$26,000FLOODHAZARD MEDIUM STUDY STUDY ST6086000 STREET &IVES RD.Cantrell,N.Residential$8,850Street&Drain;MEDIUM DRAIN- thru Dunbar to Repair &Overlay LOCAL -End (Inc. Cul-de-Sac)ST6087000 STREET &IVES RD.NW.End ofResidential$20,250Street&Drain;MEDIUM DRAIN- Curved Bridge Repair &Overlay LOCAL @ Piggee,N.- Pankey Ave.to Cantrell ST6214000 STREET &JOSEPHINE ST.Residential$14,575Street&Drain;MEDIUM DRAIN-Repair &OverlayLOCAL ST6323000 STREET &KENT DR.Anderson Dr.,Residential$12,219Street&Drain;MEDIUM DRAIN- S.to -End Repair I LOCAL Concrete,Rehabilitation of BeginPrivate Slabs,Joints, Drainage &Base ST6354000 STREET &KINGSBRIDGE Residential$1,500Street&Drain;MEDIUM DRAIN- WAY Repair &OverlayLOCAL ST6460000 STREET &LARKIN RD.Residential$9,300Street&Drain;MEDIUM DRAIN-Repair &OverlayLOCAL ST6486000 STREET &LEDGELAWN CT.LedgelawnResidential$30,175Street&Drain;MEDIUM DRAIN- Dr.,East to-Repair I LOCAL End (Inc.Cul-Rehabilitation of de-Sac) Slabs,Joints, Drainage &Base ST6487000 STREET &LEDGELAWNPatriot,NW.Residential$196,988Street&Drain;MEDIUM DRAIN- DR.thru,Lorian,Repair I LOCAL Ledgelawn Rehabilitation of Ct.,to Slabs,Joints, End(lnc.Cul- Drainage &Base de-Sac)ST6488000 STREET &LEDGELAWN Residential$35,381Street&Drain;MEDIUM DRAIN- DR.Repair ILOCAL Rehabilitation of Slabs,Joints,Drainage &Base ST6539000 STREET &LEVANT DR.Residential$17,531Street&Drain;MEDIUM DRAIN-Repair ILOCAL Rehabilitation of Slabs,Joints,Drainage &Base Page 23 River Mountain Neighborhood Action Plan Review 2002 ST6540000 STREET &LEVANT DR.Residential$109,438Street&Drain;MEDIUM DRAIN- Repair' LOCAL Rehabilitation of Slabs,Joints,Drainage &Base DR1076000 DRAINAGE LEVEES ...NA LEVEES;MEDIUM ESTABLISH INSPECTION &MAINTENANCEOFLEVEES'PUMP STATIONS ST6555000 STREET &LIBERTY BELLValleyForgeResidential$7,000Street&Drain;MEDIUM DRAIN- CT.Dr.,N.E.to -Repair &Overlay LOCAL End (Inc.Cul- de-Sac)ST6565000 STREET &LILLY CT.Old Oak Dr.,Residential$5,825Street&Drain;MEDIUM DRAIN- NW.to -End Repair &Overlay LOCAL (Inc.Cul-de- Sac)DR1079000 DRAINAGE LITTLE ...$21,000FLOODHAZARD MEDIUM MAUMELLE STUDY TRIBUTARIES#1 -#3 STUDYST6622000 STREET &LONGLEA CT.Pebble Beach Residential$16,575Street&Drain;MEDIUM DRAIN- Dr.,North to-Repair &Overlay LOCAL End (Inc.Cul- de-Sac) ST6623000 STREET &LONGLEA CV.Pebble Beach Residential$16,775Street&Drain;MEDIUM DRAIN- Dr.,W.of Repair &Overlay LOCAL Hinson,N.to - End (Inc.Cul-de-Sac) ST6627000 STREET &LONGTREE CT.Longtree Dr.,Residential$4,500Street&Drain;MEDIUM DRAIN- N.E.-End Repair &Overlay LOCAL (Inc.Cul-de- Sac)ST6628000 STREET &LONGTREE CV.Longtree Dr.,Residential$113,263Street&Drain;MEDIUM DRAIN- N.to -End Repair' LOCAL (Inc.Cul-de-Rehabilitation of Sac) Slabs,Joints, Drainage &Base ST6629000 STREET &LONGTREE DR.Shepard Dr.,Residential$24,175Street&Drain;MEDIUM DRAIN- N.thru Repair &Overlay LOCAL Longtree Ct. to -N.IntersectionOldOakDr.ST6630000 STREET &LONGTREE DR.Shepard Dr.,Residential$10,625Street&Drain;MEDIUM DRAIN- S.to -End Repair &Overlay LOCAL Asphalt c'92 ST6631000 STREET &LONGTREE DR.End AsphaltResidential$124,100Street&Drain;MEDIUM DRAIN- c'92,S.TO Repair' LOCAL TURN Rehabilitation of Slabs,Joints,Drainage &Base ST6633000 STREET &LONGTREE DR.S.lnter.OldOa Residential$148,538Street&Drain;MEDIUM DRAIN- k Dr.,E.-Repair' LOCAL Longtree Cv.,Rehabilitation of StoneviewCt., Slabs,Joints, toBubbleCul- Drainage &Base de-Sac@ Turn North Page 24 River Mountain Neighborhood Action Plan Review 2002 ST6634000 STREET &LONGVIEW CV.Hinson Rd.,Residential$6,625Street&Drain;MEDIUM DRAIN- N.E.to -End Repair &OverlayLOCAL(Inc.Cul-de- Sac)ST6635000 STREET &LONGVIEW RD.PleasantResidential$32,000Street&Drain;MEDIUM DRAIN-Forest Dr.,N.Repair &OverlayLOCALthenWest, then S.w.toHinsonRd.ST6652000 STREET &LORIAN CIR.Lorian Dr.,Residential$37,400Street&Drain;MEDIUM DRAIN-NW.to -End Repair ILOCAL(Inc.Cul-de-Rehabilitation of Sac) Slabs,Joints, Drainage &Base ST6653000 STREET &LORIAN DR.Offset@Residential$16,469Street&Drain;MEDIUM DRAIN-Pebble Beach Repair ILOCAL Dr.,S.to-Rehabilitation of End Slabs,Joints, Drainage &Base ST6654000 STREET &LORIAN DR.Offset@Residential$173,613Street&Drain;MEDIUM DRAIN- Pebble Repair ILOCALBeach,N.E.Rehabilitation of thruLorian Slabs,Joints, Cir.,Levant, Drainage &Base toLedgelawn Dr.ST6908000 STREET &MARINA DR.Residential$7,150Street&Drain;MEDIUM DRAIN-Repair &OverlayLOCAL ST6909000 STREET &MARINA DR.Northwest Ct.,Residential$30,400Street&Drain;MEDIUM DRAIN- NW.to -End Repair &OverlayLOCAL Inc. HammerheadCul-de-SacST7058000 STREET &MASTERS CIR.S.lnter.wlResidential$25,525Street&Drain;MEDIUM DRAIN-Cascades,Repair &OverlayLOCAL NW.-N. Inter.wlCascades toEnd(Inc.Cul-de-Sac)ST7226000 STREET &MONTVALE DR.Pebble Beach Residential$22,738Street&Drain;MEDIUM DRAIN-Dr.,S.to-Repair ILOCALEnd(Inc.Cul-Rehabilitation of de-Sac) Slabs,Joints, Drainage &Base ST7231000 STREET &MORELAND DR.Residential$14,750Street&Drain;MEDIUM DRAIN-Repair &OverlayLOCAL ST8152000 STREET &NORTH RODNEY Anderson Dr.,Arterial$20,125Street&Drain;MEDIUM DRAIN PARHAM RD.N.E.-Pleasant Repair &OverlayVall.FarmRd.toCantrell(SH 10)/RiverMountainRd. Page 25 River Mountain Neighborhood Action Plan Review 2002 ST8154000 STREET &NORTH RODNEY N.Sd.Arterial$25,000Street&Drain;MEDIUM DRAIN PARHAM RD.Woodland Repair &Overlay Heights-Taper S.ofSystematics(ALLTEL)Dr.,N.-Systematics(ALLTEL)Dr.,toAndersonDr.ST7318000 STREET &NORTHWESTMarinaDr.,Residential$12,075Street&Drain;MEDIUM DRAIN- CT.East to -End Repair &Overlay LOCAL (Inc.Cul-de- Sac)ST7359000 STREET &OAK BLUFF DR.Taylor LoopResidential$24,675Street&Drain;MEDIUM DRAIN- Rd.,N.to-Repair &Overlay LOCAL End at Creek ST7392000 STREET &OLD DELMONTE Hinson Rd.,Residential$44,413Street&Drain;MEDIUM DRAIN- DR.East thru Spy Repair I LOCAL Glass Lane-Rehabilitation of toEnd Slabs,Joints, Drainage &Base ST7404000 STREET &OLD OAK DR.N.of Shepard Collector$30,300Street&Drain;MEDIUM DRAIN Dr.,N.thru Repair &Overlay Jerome,Lilly Ct.,Long TreeDr.,568'to#4703ST7405000 STREET &OLD OAK DR.N.of Shepard,Collector$8,475Street&Drain;MEDIUM DRAIN S.to S.Sd.Repair &Overlay #4509N.of CecilDr.(BeginZn.17)ST7406000 STREET &OLD OAK DR.#4401 OldOak Collector$51,744Street&Drain;MEDIUM DRAIN -N.to Repair I S.Sd.#4509 Rehabilitation of N.Cecil Slabs,Joints, Dr.(Beg.Zn16) Drainage &Base ST7407000 STREET &OLD OAK DR.#4307,N.thru Collector$15,300Street&Drain;MEDIUM DRAIN DenOak to-Repair I #4401OJdOak Rehabilitation of Slabs,Joints,Drainage &Base ST7408000 STREET &OLD OAK DR.End ofCollector$108,481Street&Drain;MEDIUM DRAIN Asphalt@#Repair I 4015,N.thru Rehabilitation of LongtreeDr., Slabs,Joints, CharwickDr., Drainage &Base N.191'to #4306ST7409000 STREET &OLD OAK DR.Hinson Rd.,Collector$9,250Street&Drain;MEDIUM DRAIN N.to -End Repair &Overlay Asphaltat N.Side#4015ST0066000 STREET &OLD OAK DR.IEXISTINGCollectorNOT$437,500SEEDESIGNMEDIUM DRAIN BLACK RD.PROJECTCONST. EXTENSION BLACK RD. IN PANKEYSWTOEXIST.OLDOAKDR.(ADD LEFTTURNATCANTRELL) Page 26 River Mountain Neighborhood Action Plan Review 2002 ST7470000 STREET &PAINTEDCoconoResidential$29,700Street&Drain;MEDIUM DRAIN- VALLEY DR.Valley,N.Repair &OverlayLOCAL then West to - Hidden ValleyST7492000 STREET &PANKEY AVE.Ives,West-Residential$23,775Street&Drain;MEDIUM DRAIN- Harris,Repair &OverlayLOCALJosephine, Bridge,toWellsST7496000 STREET &PANKEY AVE.Residential$7,350Street&Drain;MEDIUM DRAIN-Repair &OverlayLOCAL ST7531 000 STREET &PARTRIDGE CT.Patriot Dr.,S.Residential$15,194Street&Drain;MEDIUM DRAIN-to -End (Inc.Repair I LOCAL Cul-de-Sac)Rehabilitation of Slabs,Joints,Drainage &Base ST7538000 STREET &PATRIOT CT.Residential$5,050Street&Drain;MEDIUM DRAIN-Repair &OverlayLOCAL ST7540000 STREET &PATRIOT DR.BeginResidential$128,456Street&Drain;MEDIUM DRAIN-Concrete@ Repair ILOCAL #15923,W.Rehabilitation of thruPartridge Slabs,Joints, Ct., Drainage &Base Greendale Ct.,toLedgelawn Dr.ST7566000 STREET &PEBBLE BEACH Pebble Beach Residential$2,250Street&Drain;MEDIUM DRAIN- CT.Dr.,S.to-Repair &OverlayLOCALEnd(Inc.Cul- de-Sac)ST7567000 STREET &PEBBLE BEACH Valley ClubResidential$46,575Street&Drain;MEDIUM DRAIN- DR.Cir.,NW.thru Repair &OverlayLOCALRoswellCt.,to WestsideBraeburn Ct. ST7568000 STREET &PEBBLE BEACH W.Sd.Braebur Residential$55,000Street&Drain;MEDIUM DRAIN- DR.n Ct,W.thru Repair &OverlayLOCALUnCt.,E.Leg Longlea,Montrose,W.LegLonglea toWoodberryST7570000 STREET &PEBBLE BEACH WoodberryCollector$25,425Street&Drain;MEDIUM DRAIN DR.Rd.,West thru Repair &Overlay PortiaDr.,-to Hinson Rd. ST7574000 STREET &PEBBLE BEACH Beg.Concrete Collector$76,500Street&Drain;MEDIUM DRAIN DR.W.ofPebble Repair I BeachCt.,W. Rehabilitation of -Montvale,to Slabs,Joints, W.Sd. Drainage &Base BradburyST7575000 STREET &PEBBLE BEACH W.SideCollector$64,388Street&Drain;MEDIUM DRAIN DR.Bradbury,Wes Repair I tthru Rehabilitation of Edenfield, Slabs,Joints, Banfieldto Drainage &Base Ledgelawn Page 27 River Mountain Neighborhood Action Plan Review 2002 ST7576000 STREET &PEBBLE BEACH Ledgelawn,Collector$123,250Street&Drain;MEDIUM DRAIN DR.West thru Repair I Levant,Lorian Rehabilitation of Offset,to- Slabs,Joints, 141'W.of Drainage &Base LorianOffset Inter.SP0310000 SPECIALPEBBLEBEACH Collector$15,625STRIPING wI CL.MEDIUM DR.STRIPING III BIKE PATH DR1097000 DRAINAGE PEBBLE BEACH ...NADRAINAGEMEDIUM DRAINAGE ST7580000 STREET &PECKERWOODSamPeckCollector$393,750Street&Drain;MEDIUM DRAIN RD.Rd.,West thru Reconstruction, EndCIGto- Collector EndST7581000 STREET &PECOS LN.RodneyResidential$7,275Street&Drain;MEDIUM DRAIN- Parham,East Repair &Overlay LOCAL to - HammerheadCul-de-SacST7615000 STREET &PIEDMONT CIR.Butterfield @ Residential$9,900Street&Drain;MEDIUM DRAIN- Summerdale Repair &Overlay LOCAL Ln.,SW.to- End (Inc.Cul-de-Sac)DR1098000 DRAINAGE PIEDMONT ...NADRAINAGEMEDIUM DRAINAREA-ISON CREEKST7616000 STREET &PIEDMONT LN.SummerdaleResidential$26,850Street&Drain;MEDIUM DRAIN- Ln.,N.to-Repair &Overlay LOCAL Loop@ End ST7642000 STREET &PIGGEE STREET Curve @Residential$48,125Street&Drain;MEDIUM DRAIN- Derrick,East Reconstruction LOCAL to -End East of DerrickST7645000 STREET &PIGGEE STREET Residential$51,563Street&Drain;MEDIUM DRAIN- Reconstruction LOCAL ST7681 000 STREET &PINE MOUNTAIN Residential$358,000Street&Drain;MEDIUM DRAIN- RD.Reconstruction LOCAL ST7699000 STREET &PINE VIEW CV.Valley ViewResidential$2,650Street&Drain;MEDIUM DRAIN- Dr.,West to-Repair &Overlay LOCAL End (Inc.Cul- de-Sac)ST7700000 STREET &PINE VIEW PL.Residential$4,000Street&Drain;MEDIUM DRAIN- Repair &Overlay LOCAL ST7675000 STREET &PINEHURST CIR.Valley ClubResidential$48,025Street&Drain;MEDIUM DRAIN- Cir.thru Repair &Overlay LOCAL Curve back to -Valley ClubCir.ST0025000 STREET &PINNACLE Arterial$3,193,750Street&Drain;MEDIUM DRAIN VALLEY RD.Reconstruction, Arterial -Minor ST7719000 STREET &PLATTE VALLEY PleasantResidential$33,125Street&Drain;MEDIUM DRAIN- DR.Valley,S.to Repair &Overlay LOCAL 90 Deg.Turn West toArkansasValleyDr. Page 28 River Mountain Neighborhood Action Plan Review 2002 ST7731 000 STREET &PLEASANT#12725,W -Collector$56,250Street&Drain;MEDIUM DRAIN FOREST DR.Feldspar,Repair &Overlay Emerald,Marble@Garnet,GoldenOak@Flourite,toSamPeckIntersectionST7734000 STREET &PLEASANT Collector$5,313Street&Drain;MEDIUM DRAIN FOREST DR.Repair I Rehabilitation ofSlabs,Joints,Drainage &Base ST7735000 STREET &PLEASANTEndConcrete Collector$43,200Street&Drain;MEDIUM DRAIN FOREST DR.#13615W,W Repair &Overlay -ValleyView,Cherry Creek,Longview,toHinson@BentTree SP0285000 SPECIALPLEASANT Collector$125,000INTERSECTIONMEDIUM FORESTDR.@ REALIGNMENT & VALLEYVIEW IMPROVEMENT ST7742000 STREET &PLEASANTDividedCollector$11,725Street&Drain;MEDIUM DRAIN RIDGE RD.Section S.of Repair &Overlay Cantrell,S.E.to -N.Inter.wi FairviewRd.ST7743000 STREET &PLEASANTN.Collector$29,000Street&Drain;MEDIUM DRAIN RIDGE RD.Inter.Fairview Repair &Overlay Rd.,W-PleasantRidgeDr.,S.Sd.PleasantRidgeCt.ST7744000 STREET &PLEASANTS.Sd.Pleasant Collector$52,225Street&Drain;MEDIUM DRAIN RIDGE RD.RidgeCt.@ Repair &OverlayPavementChange,S.E.to 163'WCedarBranchCt.ST7745000 STREET &PLEASANT Collector$7,825Street&Drain;MEDIUM DRAIN RIDGE RD.Repair &Overlay ST7746000 STREET &PLEASANT Collector$5,000Street&Drain;MEDIUM DRAIN RIDGE RD.Repair &Overlay ST7754000 STREET &PLEASANTHidden Valley,Collector$99,063Street&Drain;MEDIUM DRAIN VALLEY DR.West thru Rehabilitation Bridgeto Curbs,Drainage, Rodney Street As Needed Parham(2-TWO LANESWIMEDIAN)DR1101000 DRAINAGE PLEASANT ...NADRAINAGEMEDIUM VALLEYDR.DRAINST7756000 STREET &PLEASANT VIEW Cameo Dr.,Residential$32,500Street&Drain;MEDIUM DRAIN- DR.West thru Repair &OverlayLOCALMoreland, Amber,Coral,to Feldspar Page 29 River Mountain Neighborhood Action Plan Review 2002 ST7803000 STREET &PORTLAND DR.ElDorado Dr.,Residential$43,725Street&Drain;MEDIUM DRAIN- North,then Repair &Overlay LOCAL West,then South,toHinsonRd. ST7821000 STREET &POWDER HORN Pebble Beach Residential$9,800Street&Drain;MEDIUM DRAIN- CV.Dr.,N.E.to-Repair &Overlay LOCAL End (Inc.Cul- de-Sac)ST7822000 STREET &POWDER HORN Pebble Beach Residential$3,500Street&Drain;MEDIUM DRAIN- DR.Dr.,S.E.to-Repair &Overlay LOCAL End (Inc.Cul- de-Sac)ST7935000 STREET &RED BIRCH CV.White AspenResidential$16,275Street&Drain;MEDIUM DRAIN- Ct.,E.then N.Repair &Overlay LOCAL to -End (Inc. Cul-de-Sac) STOOOOOOO STREET &RESURFACING ALLStreet&Drain;MEDIUM DRAIN OF IMPROVED Repair &Overlay ROADWAYS- -$3 Million CITYWIDE Annually ST8027000 STREET &RIGHTSELL RD.Residential$78,125Street&Drain;MEDIUM DRAIN- Reconstruction LOCAL ST8030000 STREET &RIGHTS ELL RD.Residential$110,000Street&Drain;MEDIUM DRAIN- Reconstruction LOCAL ST8079000 STREET &RIVERCRESTSouthRidge,Residential$204,125Street&Drain;MEDIUM DRAIN- DR.S.E.to -End Repair &Overlay LOCAL (Inc.Cul-de- Sac)ST8080000 STREET &RIVERCREST Collector$87,250Street&Drain;MEDIUM DRAIN DR.Repair &Overlay ST8081000 STREET &RIVERCRESTW.Sd.Marina Collector$45,550Street&Drain;MEDIUM DRAIN DR.Dr.Repair &Overlay Intersection,NW.to -EndPvmt.@OldCandlewoodRIWSP1192000 SPECIALROADWAY ALLNAMEDIANS&MEDIUM MEDIANSAND ISLANDS; ISLANDS ADDRESS MAINTENANCE&IMPROVEMENTNEEDSST8149000 STREET &ROCKY VALLEY Rocky Valley Residential$37,125Street&Drain;MEDIUM DRAIN- CV.Dr.,N.then E.Repair &Overlay LOCAL then N.to- End (Inc.Cul-de-Sac)ST8150000 STREET &ROCKY VALLEY Residential$4,375Street&Drain;MEDIUM DRAIN- DR.Repair &OverlayLOCAL ST8231 000 STREET &ROSWELL CT.Pebble Beach Residential$4,600Street&Drain;MEDIUM DRAIN- Dr.,SW.to -Repair &Overlay LOCAL End (Inc. HammerheadCul-de-Sac) Page 30 River Mountain Neighborhood Action Plan Review 2002 ST8247000 STREET &RUSS STREETEndAsphaltResidential$237,500Street&Drain;MEDIUM DRAIN-Section,S.of Reconstruction LOCAL Cantrell,-S.- Bridge,OffsetInters.@Piggee,S.toEndST8252000 STREET &SABINE VALLEY ImperialResidential$21,750Street&Drain;MEDIUM DRAIN- DR.Valley,West Repair &OverlayLOCAL thru ShenandoahValleytoHiddenValleyST8258000 STREET &SAINT ANDREW Residential$53,950Street&Drain;MEDIUM DRAIN- DR.Repair &OverlayLOCAL ST0070000 STREET &SAM PECK RD.Collector$217,000Street&Drain;MEDIUM DRAIN Reconstruction, CollectorST8281000 STREET &SAM PECK RD.Collector$25,025Street&Drain;MEDIUM DRAIN Repair &Overlay ST8282000 STREET &SAM PECK RD.PleasantCollector$66,250Street&Drain;MEDIUM DRAIN Forest Dr.,N.Repair &Overlay -Taper,Forest Maple@SugarMaple,ScarletMaple,toS.Sd.PeckerwoodST8284000 STREET &SAMS CV.Sugar MapleResidential$4,425Street&Drain;MEDIUM DRAIN-Lane,East to Repair &OverlayLOCAL-End (Inc. Cul-de-Sac) ST8294000 STREET &SAN JOAQUIN Residential$27,625Street&Drain;MEDIUM DRAIN- VALLEY DR.Repair &OverlayLOCAL ST8322000 STREET &SCARLETSam PeckResidential$10,375Street&Drain;MEDIUM DRAIN- MAPLE CT.Rd.,S.then Repair &OverlayLOCAL West to -End (Inc.Cul-de-Sac)ST8391000 STREET &SECLUDEDCecilDr.,N.Residential$19,019Street&Drain;MEDIUM DRAIN- HILLS CT.to -End (Inc.Repair ILOCALCul-de-Sac)Rehabilitation of Slabs,Joints,Drainage &Base ST8392000 STREET &SECLUDED Residential$14,769Street&Drain;MEDIUM DRAIN- HILLS DR.Repair ILOCAL Rehabilitation of Slabs,Joints,Drainage &Base ST8393000 STREET &SECLUDED Residential$3,475Street&Drain;MEDIUM DRAIN- HILLS DR.Repair &OverlayLOCAL ST8457000 STREET &SHADYWOODSugarMapleResidential$10,800Street&Drain;MEDIUM DRAIN- CT.Lane,West to Repair &OverlayLOCAL-End (Inc. Cul-de-Sac) Page 31 River Mountain Neighborhood Action Plan Review 2002 ST8476000 STREET &SHAWNEEShawneeResidential$13,075Street&Drain;MEDIUM DRAIN- FORESTCV.Forest Dr.,N.Repair &Overlay LOCAL W.to -End (Inc.Cul-de-Sac)ST8477000 STREET &SHAWNEESierra Forest,Residential$50,000Street&Drain;MEDIUM DRAIN- FOREST DR.W.-Repair &Overlay LOCAL TetonFor.,Rio GrandeFor.,ShawneeFor.,TetonFor.toPleasantForestST8489000 STREET &SHENANDOAHPleasantResidential$55,325Street&Drain;MEDIUM DRAIN- VALLEY DR.Valley,S.thru Repair &Overlay LOCAL Both Inter.of CimmarronValI.then W.toHiddenValley ST8490000 STREET &SHEPARD CT.ShepardResidential$6,750Street&Drain;MEDIUM DRAIN- Dr.,S.to-Repair &Overlay LOCAL End (Inc.Cul- de-Sac)ST8497000 STREET &SHEPARD HILLS Shepard Dr.,Residential$11,025Street&Drain;MEDIUM DRAIN- CT.S.&w.to-Repair &Overlay LOCAL End (Inc.Cul- de-Sac)ST8498000 STREET &SHEPARD HILLS Shepard Dr.,Residential$8,200Street&Drain;MEDIUM DRAIN- CV.N.to -End Repair &Overlay LOCAL (Inc.Cul-de- Sac)ST8529000 STREET &SIERRA FOREST PleasantResidential$29,250Street&Drain;MEDIUM DRAIN- DR.Forest Dr.,N.Repair &Overlay LOCAL thru ShawneeForest,DesotoF orest,to PleasantRidgeRd.ST8531000 STREET &SILVER BIRCHPleasantResidential$5,250Street&Drain;MEDIUM DRAIN- CT.Forest Dr.,N.Repair &Overlay LOCAL to -End (Inc. Cul-de-Sac)ST8532000 STREET &SILVER FIR CT.WhiteFir Ln.,Residential$5,925Street&Drain;MEDIUM DRAIN- SW.to -End Repair &Overlay LOCAL (Inc.Cul-de- Sac)ST8534000 STREET &SILVER MAPLEPleasantResidential$3,125Street&Drain;MEDIUM DRAIN- CT.Forest Dr.@ Repair &Overlay LOCAL WhiteAspen Ct.N.-to End(Inc.Cul-de-Sac)ST8572000 STREET &SOUTH POINTShepardResidential$7,075Street&Drain;MEDIUM DRAIN- CT.Dr.,S.to-Repair &Overlay LOCAL End (Inc.Cul- de-Sac)SP0041ROOSPECIAL SOUTH RIDGECollectorNASIDEWALKSMEDIUM DR.SP1261000 SPECIALSOUTHRIDGE CollectorNATRAFFICMEDIUM DR. CALMING AND CHANNELIZA TION ST8573000 STREET &SOUTH RIDGECantrellRd.,Collector$42,925Street&Drain;MEDIUM DRAIN DR.N.464'thru Repair &Overlay taperthen thru Curve to -Larkin Rd. Page 32 River Mountain Neighborhood Action Plan Review 2002 ST8574000 STREET &SOUTH RIDGELarkinRd.,N.Collector$196,000Street&Drain;MEDIUM DRAIN DR.W.-Repair &Overlay Bainbridgeto RivercrestST8630000 STREET &SPYGLASS LN.Residential$33,256Street&Drain;MEDIUM DRAIN-Repair ILOCAL Rehabilitation of Slabs,Joints,Drainage &Base ST8691000 STREET &STONEVIEW CT.Longtree Dr.,Residential$110,075Street&Drain;MEDIUM DRAIN- N.to -End Repair ILOCAL (Inc.Cul-de-Rehabilitation of Sac) Slabs,Joints, Drainage &Base ST8714000 STREET &SUGAR MAPLESugarMapleResidential$6,500Street&Drain;MEDIUM DRAIN- CT.Ln.N.to-Repair &OverlayLOCALEnd(Inc.Cul- de-Sac)ST8715000 STREET &SUGAR MAPLE#4621Residential$37,350Street&Drain;MEDIUM DRAIN- LN.SugarMaple Repair &OverlayLOCALLn.,@ Wlnt.Christopher,SugarMapleCt.to ValleyViewDr.ST8717000 STREET &SUGAR MAPLE75'S.Sd.Residential$17,725Street&Drain;MEDIUM DRAIN- LN.SamsCv.,Repair &OverlayLOCAL NW-East IntersectionChristopher,to #4224ST8718000 STREET &SUGAR MAPLESamPeckResidential$13,525Street&Drain;MEDIUM DRAIN- LN.Rd.,NW.-Repair &OverlayLOCAL Forestwood, Shadywood,to S.Sd.SamsCove ST8719000 STREET &SUMMERDALEButterfield @ Residential$16,875Street&Drain;MEDIUM DRAIN- LN.Piedmont Cir.,Repair &OverlayLOCAL N.E.thru Piedmont Ln.to End Inc.Cul-de-Sac ST8745000 STREET &SUMMIT RD.Residential$417,188Street&Drain;MEDIUM DRAIN- Reconstruction LOCAL ST8749000 STREET &SUMTER Residential$8,625Street&Drain;MEDIUM DRAIN- FOREST DR.Repair &OverlayLOCAL ST8784000 STREET &TAHOE LN.Residential$9,750Street&Drain;MEDIUM DRAIN-Repair &OverlayLOCAL DR1123000 DRAINAGE TAYLOR LOOP ...NADRAINAGEMEDIUM CIRCLEDRAIN DR1123AOO DRAINAGE TAYLOR LOOP ...$187,500DRAINAGEMEDIUM CIRCLEDRAIN-WESTCHESTERPHASE Page 33 River Mountain Neighborhood Action Plan Review 2002 ST0035000 STREET &TAYLOR LOOP Arterial$1,875,000Street&Drain;MEDIUM DRAIN RD.,PART 1 Reconstruction, Arterial -MinorST0073000 STREET &TAYLOR LOOPRAHLINGRD.Collector$1,925,000Street&Drain;MEDIUM DRAIN RD.,PART 2W.TO Reconstruction, CURVE Collector SOUTHOF FOREST LN.WHEREMSPPROPOSESMINORARTERIALINTERSECTIONST0036000 STREET &TAYLOR LOOP Arterial$1,575,000Street&Drain;MEDIUM DRAIN RD.,PART 3 Reconstruction, Arterial -MinorST8879000 STREET &TETON FOREST EastResidential$35,775Street&Drain;MEDIUM DRAIN- DR.Intersection wI Repair &OverlayLOCAL ShawneeFore st Dr.,toW.Inter.ShawneeForestST9051000 STREET &VALLEY CLUBS.Side TamResidential$102,500Street&Drain;MEDIUM DRAIN- CIR.o Shanter,S.Repair &OverlayLOCALthrubothlegs Pinehurst Cir.,Cascades Dr.,Greenbrier,toWendyLn. ST9052000 STREET &VALLEY CLUBWestInter.wl Residential$287,656Street&Drain;MEDIUM DRAIN- CIR.Fairway,S.-Rehabilitation LOCAL Pebble Curbs,Drainage, Beach, Street As Needed Bridge,to S.Sd.TamOShanterST9053000 STREET &VALLEY CLUBS.Side KyleResidential$42,425Street&Drain;MEDIUM DRAIN- CIR.Ct.,S.to-Repair &OverlayLOCAL West Inter.wI FairwayST9057000 STREET &VALLEY CLUBE.lnt.Fairway,Residential$42,100Street&Drain;MEDIUM DRAIN- CIR.N.-Repair &OverlayLOCALSt.Andrews, Inverness,-to "T"Inter.ofValleyClubCir.ST9060000 STREET &VALLEY CLUBWendyLane,Residential$75,000Street&Drain;MEDIUM DRAIN- CIR.N.-Buff Repair &OverlayLOCALLane, PleasantValleyDr.,toEastIntersectionwIFairwayDR0262000 DRAINAGE VALLEYHINSON RD ....$937,5004'X 8'BOXMEDIUM ESTATESDRAINN.THROUGH VALLEYESTATESSUB.ANDBACKTOHINSONRD. Page 34 River Mountain Neighborhood Action Plan Review 2002 ST9068000 STREET &VALLEY VIEWPleasantResidential$48,350Street&Drain;MEDIUM DRAIN- DR.Forest Dr.,N.Repair &Overlay LOCAL -PineView, ChimneySweep,SugarMapleLn.to #4308ST9253000 STREET &WATERBURYWestchaseResidential$64,919Street&Drain;MEDIUM DRAIN- CT.Dr.,S.to-Repair I LOCAL End Inc.Cul-Rehabilitation of de-Sac Slabs,Joints, Drainage &Base ST9278000 STREET &WELLS STREET Washed OutResidential$148,125Street&Drain;MEDIUM DRAIN- Bridge Reconstruction LOCAL Barricade,S. of Cantrell,N.to Cantrell ST9279000 STREET &WELLS STREET Pankey Ave.,Residential$84,375Street&Drain;MEDIUM DRAIN- N.to-Reconstruction LOCAL WashedOut BridgeBarricade,S.ofCantrellDR1132000 DRAINAGE WELLS STREET ...$312,500BRIDGEMEDIUM @ISONCREEK REMOVAL DRAINST9282000 STREET &WENTWOODPlatteValley,Residential$28,000Street&Drain;MEDIUM DRAIN- VALLEY DR.S.thru Repair &Overlay LOCAL ChapparalVall ey,toSanJoaquinValleyST9283000 STREET &WENTWOODSanJoaquinResidential$31,250Street&Drain;MEDIUM DRAIN- VALLEY DR.Valley,S.thru Repair &Overlay LOCAL Crestdale,to Curve@YosemiteValleyST8174000 STREET &WEST RODNEY W.Sd.1-430Arterial$33,825Street&Drain;MEDIUM DRAIN PARHAM RD.R1W@W.Sd.Repair &Overlay BattleRd.,W.to Ark.Valley@ShacklefordST8175000 STREET &WEST RODNEY ArkansasArterial$41,625Street&Drain;MEDIUM DRAIN PARHAM RD.Valley@ Repair &Overlay Shackleford,W.-MarketSt.,WidthChange,Merrill,HiddenValley,toBridgeST8178000 STREET &WEST RODNEY Bridge 110'Arterial$6,825Street&Drain;MEDIUM DRAIN PARHAM RD.West of Repair &Overlay HiddenValley,W.-Taper toRodneyParhamTurnNorth@Hinson&GreenMountain Page 35 River Mountain Neighborhood Action Plan Review 2002 ST9293000 STREET &WESTBURY DR.Cantrell,S.E.Residential$167,875Street&Drain;MEDIUM DRAIN- thru N.lnter.Repair I LOCAL Westchase,S.Rehabilitation of Inter. Slabs,Joints, Westchase, Drainage &Base S.toEndInc.Cul-de-Sac ST9294000 STREET &WESTCHASENW.Residential$94,669Street&Drain;MEDIUM DRAIN- DR.Inter.Westbur Repair I LOCAL Y Dr.,S.E.-Rehabilitation of Waterbury, Slabs,Joints, Worthington, Drainage &Base to S.lntersect.WestburyDR1123AOODRAINAGEWESTCHESTER ...$187,500DRAINAGEMEDIUM CT.DRAIN ST9295000 STREET &WESTCHESTER Taylor LoopResidential$382,813Street&Drain;MEDIUM DRAIN- CT.Rd.,W.-Rehabilitation LOCAL Westchester Curbs,Drainage, Drive, Street As Needed Westchester Cv.,Canterbury,toEndIncludingCul-de-Sac ST9298000 STREET &WESTCHESTER WestchesterResidential$6,550Street&Drain;MEDIUM DRAIN- CV.Ct.,S.to-Repair &Overlay LOCAL End (Inc.Cul- de-Sac)ST9299000 STREET &WESTCHESTER WestchesterResidential$23,625Street&Drain;MEDIUM DRAIN- DR.Ct.,S.to-Repair &Overlay LOCAL End at Creek ST9341000 STREET &WHITE ASPENPleasantResidential$15,825Street&Drain;MEDIUM DRAIN- CT.Forest Dr.@ Repair &Overlay LOCAL Silver Maple, S.-Red BirchtoEnd(Inc.Cul-de-Sac)ST9342000 STREET &WHITE FIR CV.WhiteFirResidential$3,750Street&Drain;MEDIUM DRAIN- Lane,N.to-Repair &Overlay LOCAL End (Inc.Cul- de-Sac)ST9343000 STREET &WHITE FIR LN.PleasantResidential$29,200Street&Drain;MEDIUM DRAIN- Forest Dr.,Repair &Overlay LOCAL NW.-Silver Fir Ct.to c'82EndST9428000 STREET &WOODBERRY Residential$31,875Street&Drain;MEDIUM DRAIN- RD.Repair &Overlay LOCAL ST0231 000 STREET &WOODLAND Residential$750,000Street&Drain;MEDIUM DRAIN- HEIGHTS RD.Reconstruction LOCAL ST9454000 STREET &WOODLANDN.Sd.Rodney Collector$31,725Street&Drain;MEDIUM DRAIN HEIGHTS RD.Parham,N.Repair &Overlay thruPleasant Forest Dr.Turn East @Fairview Page 36 River Mountain Neighborhood Action Plan Review 2002 ST9516000 STREET &WOODSTOCKPleasantValle Residential$18,325Street&Drain;MEDIUM DRAIN- CT.Y Dr.,S.E.Repair &OverlayLOCAL thru BigStoney,toEnd(lnc.Cul-de-Sac)ST9520000 STREET &WORTHINGTON WestchaseResidential$29,644Street&Drain;MEDIUM DRAIN- CT.Dr.,S.to-Repair ILOCALEnd(Inc.Cul-Rehabilitation of de-Sac) Slabs,Joints, Drainage &Base ST9558000 STREET &YOSEMITEWentwoodResidential$41,600Street&Drain;MEDIUM DRAIN- VALLEY DR.Valley,West Repair &OverlayLOCAL to -Arkansas ValleyST9559000 STREET &YOSEMITEArkansasResidential$39,075Street&Drain;MEDIUM DRAIN- VALLEY DR.Valley,W.thru Repair &OverlayLOCALcurvespastE. GilaVal1.Inter.to W.lnter.GiiaValley Page 37 River Mountain Neighborhood Action Plan Review 2002