HomeMy WebLinkAboutapplication letterAKansasWater
Essential �, Exceptional
August 16, 2021
Brian Minyard, AICP
Historic District Staff
Department of Planning and Development
723 W Markham Street
Little Rock, AR 72211
Dear Brian,
As we discussed, Central Arkansas Water (CAW) has received a grant to create and install public artwork that tells the
story of water from the forest to the tap. We have been working with local artists to create this installation that would be
placed on the property we own at 301 E. Capitol just across the street from our main office at 221 E Capitol. We have
been located on this corner for more than 50 years going back to our time as a department of the City of Little Rock as the
Water Works.
CAW is dedicated to the growth of downtown Little Rock in a sustainable manner that protects the historic fabric of the
city as evidenced by our development of Fassler Hall, the two employee parking lots along Cumberland and the ongoing
renovation of the deli building at 314 E. 6t''. We chose this property for the artwork because of its visible and high traffic
location next to the Rock Region Metro River Cities Travel Center, CAW Main Office, and Fassler Hall. This art
installation would enhance the corner and further expand the developing art corridor around downtown.
We envision a 3-part installation. The major component is a large mural telling the story of water painted on a board
mounted to the north brick wall. This mural would be mounted with screws into the mortar, so that it could be removed in
the future without damaging or modifying the brick wall. The second component is to paint the manhole cover and drain
similar to other drain art in many other locations around the city. Finally, the column in front of the building would be
wrapped with shimmery materials to replicate the idea of flowing water. Together these components would tell the story
of water from the Forest to the Tap. None of the art would modify the structures in a permanent way. Photos of the
current and proposed art installation are attached.
Sincerely,
6� �,4 Y. 6AAA,_
Linda K. Smith
Sustainability and Facilities Manager
Central Arkansas Water
Linda.smith(kcarkw.com 1 501-377-7058
www. carkw. com
Aie�
Central
.1� kama�
CURRENT, 301 E Capitol Ave
PROPOSED BELOW
1. Art to be mounted on board and screwed 2. Column wrapped to
to mortar. Approx. 10' w x 5' tall. look like flowing water.
3. Manhole cover to be painted
similar to other citywide drain art.
Arkansas V V a to r
Essential:, Exceptional
LINDA K. SMITH
501.377.7058
501.377.1244
linda.smith@carkw.com
9100
carkw.com
221 East Capitol Avenue • P.O. Box 1789 • Little Rock, AR 72203