HomeMy WebLinkAboutC207 HARDSCAPE DEMO104100100101101101101100100SEE ARCHITECTURALDEMOLITION PLANS100SEE ARCHITECTURALDEMOLITION PLANS100SEE ARCHITECTURALDEMOLITION PLANS100SEE ARCHITECTURALDEMOLITION PLANS104100CONTRACTOR SHALL REVIEW DEMOLITION PLAN IN CONJUNCTIONWITH TREE PROTECTION PLAN. ALL AREAS OF DEMOLITION WITHINTHE INDICATED TREE PROTECTION AREAS SHALL BE REVIEWED BYTHE LANDSCAPE ARCHITECT, ENGINEER AND ARBORIST PRIOR TOCOMMENCEMENT. WRITTEN APPROVAL OF DEMOLITION METHOD ISREQUIRED PRIOR TO START.EXISTINGFENCE104101100100100100100100100100100PROPOSED LEGENDLIMITS OF PAVEMENT AND / OR STRUCTURE DEMOLITIONBUILDING DEMOLITION(SEE ARCHITECT DEMOLITION PLANS)CLEARING AND GRUBBING OF EXISTING LANDSCAPE(SEE LANDSCAPE ARCHITECTS PLANS)ROOT AERATION EXISTING TREES TO REMAIN(SEE LANDSCAPE ARCHITECTS PLANS)REMOVE AND DISPOSE TREETREE PROTECTIONLIMITS OF DISTURBANCELAYDOWN / STORAGE AREATP1.ALL AREAS WITHIN THE LIMITS OF DISTURBANCE TO BE DEMOLISHED ANDREMOVED UNLESS OTHERWISE NOTED ON THIS PLAN.2.THE CONTRACTOR IS REQUIRED TO NOTIFY THE APPROPRIATE UTILITY COMPANYAT LEAST 48 HOURS PRIOR TO EXCAVATING IN ORDER THAT UNDERGROUNDUTILITIES IN THE AREA CAN BE LOCATED.3.THIS PLAN SHOULD BE USED IN CONJUNCTION WITH THE TOPOGRAPHICAL SURVEYFOR REFERENCE. THE LOCATION OF KNOWN SUBSURFACE STRUCTURES, PIPES,POWER, GAS, PHONE, ETC. ARE SHOWN ON THE PLANS. CONTRACTOR SHALL BERESPONSIBLE FOR OBTAINING INFORMATION AND SATISFYING HIMSELF TO AS TOTHE LOCATION OF THE AFOREMENTIONED ITEMS, SHOWN AND NOT SHOWN. ALLREPAIRS OR RELOCATIONS NECESSARY SHALL BE MADE AS REQUIRED BY THEOWNER OF THE UTILITY OR STRUCTURE. THE COST OF SUCH REPAIRS ORRELOCATIONS NECESSARY SHALL BE BORNE BY THE CONTRACTOR.4.CONTRACTOR SHALL DISPOSE OF ALL MATERIALS RESULTING FROM DEMOLITIONIN ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL REGULATIONS THATGOVERN SUCH OPERATIONS.5.ALL ABANDONED SERVICE LINES SHALL BE DISCONNECTED AND CAPPED PERUTILITY COMPANIES REQUIREMENTS. COORDINATE ALL DISCONNECTIONS WITHUTILITY COMPANIES.6.CONTRACTOR IS TO BRING TO THE ATTENTION OF THE CIVIL ENGINEER ANY AREAOF DEMOLITION IN QUESTION BEFORE PROCEEDING WITH WORK.7.CONTRACTOR TO REVIEW AND COORDINATE DEMOLITION LIMITS WITH PROPOSEDCONSTRUCTION PLANS.8.EXISTING CLEAN TOPSOIL TO BE STOCKPILED FOR FUTURE USE ON THIS SITE ANDIS TO BE COORDINATED BY THE GENERAL CONTRACTOR.9.ALL EXISTING WATER, GAS AND / OR ELECTRICAL METERS AS NOTED TO BEABANDONED AND / OR REMOVED WITHIN THE PROJECT AREA ARE TO BE RETURNEDTO THE APPROPRIATE AUTHORITY.10.ALL LANDSCAPE AREAS OUTSIDE OF THE TREE PROTECTION FENCING AND WITHINTHE LIMITS OF DISTURBANCE SHALL BE CLEARED & GRUBBED.11.ALL TREES WITH TREE PROTECTION FENCING TO BE PNEUMATIC & HANDEXCAVATED, UNLESS OTHERWISE NOTED. SEE DETAIL. GENERAL DEMOLITION NOTES100EXISTING TO BE REMOVED AND / OR DEMOLISHED101EXISTING TO BE SALVAGED AND RETURNED TO THE OWNER102EXISTING TO REMAIN AND BE PROTECTED103EXISTING TO BE RELOCATED104LIMITS OF SAWCUT AND PAVEMENT REMOVAL105PROTECT EXISTING STRUCTURES AND / OR PIPES DURING DEMOLITION ANDCONSTRUCTION PHASES106LIMITS OF DISTURBANCE107CONTRACTOR TO COORDINATE W/ LOCAL UTILITY PROVIDER FOR REMOVAL /RELOCATION OF EXISTING UTILITY108CUT AND PLUG EXISTING WATERLINE PER CAW STDS. WATERLINE TO BE REUSEDAND EXTENDED PER CIVIL UTILITY PLAN109CUT AND PLUG EXISTING SEWER LINE PER LRWRA STDS. COORDINATE WITHLRWRA.10BROOT PRUNING / AERATION (SEE LANDSCAPE ARCHITECTS PLANS AND SPECS) DEMOLITION DETAILS DEMOLITION KEYNOTESDEMOLITION NOTE:PRIOR TO ANY DEMOLITION OR CONSTRUCTION ONSITE THE CONTRACTOR ISRESPONSIBLE FOR ORGANIZING A SITE WALK TO VERIFY EXISTING SITECONDITIONS.COORDINATE SITE WALK WITH DESIGN TEAM MEMBERS, ARKANSAS ARTS CENTER,MACARTHUR MILITARY MUSEUM AND CITY OF LITTLE ROCK PARKS ANDRECREATION REPRESENTATIVES.EXTERIOR SCULPTURES, MILITARY MONUMENTS AND SOME HISTORIC SITEFEATURES MUST BE RELOCATED PRIOR TO CONSTRUCTION COMMENCEMENT ORPROTECTED THROUGHOUT THE CONSTRUCTION PROCESS.IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE DESIGN TEAM WITHANY QUESTIONS OR CONCERNS ABOUT HISTORIC MARKERS NOT SHOWN ON THISPLAN.0102040201 inch = 20ft.( IN FEET )PLAN SCALEHARDSCAPE DEMOLITIONPLAN NORTHC-20708/16/2019Drawing Number:16061Project No :No.Issued forDateCivil Engineer7302 Kanis RoadLittle Rock, AR 72204Sheet Title :EH4Drawn :Checked :DGBDate :Scale :1" = 20'-0"McClelland Consulting EngineersLandscape Architect277 Broadway Suite 1606New York, NY 10007SCAPEMechanical / Electrical / Plumbing / Fire Protection303 W. Erie Street Suite 510Chicago, IL 60654db | HMSStructural Engineer + Enclosure Consultant330 N. Wabash Avenue, Suite 1500Chicago, IL 60611Thornton TomasettiEnvironmental Design Consultant303 W. Erie Street Suite 510Chicago, IL 60654db | HMSLighting DesignerJagdweg 16D-53155 Bonn, GermanyLicht Kunst Licht AGAcoustical / Theatrical / AV Consultant35 East Wacker Drive, Suite 1800Chicago, IL 60601ARUPT 312.596.2000T 312.915.0557T 212.462.2628T 501.371.0272T 312.849.5610Associate Architect2222 Cottondale Lane Suite 100Little Rock, AR 72202Polk Stanley Wilcox ArchitectsT 501.378.08781520 W. Division StreetChicago, Illinois 60642T 773.384.1212ARCHITECT OF RECORDARKANSASARTS CENTERGENERAL NOTES1. THE DRAWINGS, SPECIFICATIONS AND OTHER DOCUMENTS PREPAREDBY THE ARCHITECTS FOR THIS PROJECT ARE INSTRUMENTS OF THEARCHITECT'S SERVICE FOR USE SOLEY WITH RESPECT TO THIS PROJECTAND UNLESS OTHERWISE PROVIDED THE ARCHITECT SHALL BE DEEMEDTHE AUTHOR OF THESE DOCUMENTS AND SHALL RETAIN ALL COMMONLAW, STATUTORY AND OTHER RESERVED RIGHTS, INCLUDING THECOPYRIGHT. REPRODUCTION IS PROHIBITED. COPYRIGHT 2019. STUDIOGANG ARCHITECTS.2. CONTRACTORS AND SUBCONTRACTORS SHALL VERIFY ALL FIGUREDDIMENSIONS AND CONDITIONS AT THE JOBSITE AND NOTIFY THEARCHITECT OF ANY DIMENSIONAL ERRORS, OMISSIONS ORDISCRAPENCIES BEFORE BEGINNING OR FABRICATION OF ANY WORK. DONOT SCALE THESE DRAWINGS.MacArthur Park501 East 9th StreetLittle Rock, AR 72202LITTLE ROCK, ARKANSAST 312.915.0557T 49.228.91422-102019 Studio Gang Architectsc123456789101112ABCDEFGHIJ01 75% Schematic Design for Pricing 04/27/201802 70% Design Development for Pricing 10/26/201803 100% Design Development 01/31/201904 60% Construction Documents & Bid Six 06/07/201905 Permit & Bid 08/16/201908/16/2019Drawing Number:16061Project No :No.Issued forDateCivil Engineer7302 Kanis RoadLittle Rock, AR 72204Sheet Title :EH4Drawn :Checked :DGBDate :Scale :1" = 20'-0"McClelland Consulting EngineersLandscape Architect277 Broadway Suite 1606New York, NY 10007SCAPEMechanical / Electrical / Plumbing / Fire Protection303 W. Erie Street Suite 510Chicago, IL 60654db | HMSStructural Engineer + Enclosure Consultant330 N. Wabash Avenue, Suite 1500Chicago, IL 60611Thornton TomasettiEnvironmental Design Consultant303 W. Erie Street Suite 510Chicago, IL 60654db | HMSLighting DesignerJagdweg 16D-53155 Bonn, GermanyLicht Kunst Licht AGAcoustical / Theatrical / AV Consultant35 East Wacker Drive, Suite 1800Chicago, IL 60601ARUPT 312.596.2000T 312.915.0557T 212.462.2628T 501.371.0272T 312.849.5610Associate Architect2222 Cottondale Lane Suite 100Little Rock, AR 72202Polk Stanley Wilcox ArchitectsT 501.378.08781520 W. Division StreetChicago, Illinois 60642T 773.384.1212ARCHITECT OF RECORDARKANSASARTS CENTERGENERAL NOTES1. THE DRAWINGS, SPECIFICATIONS AND OTHER DOCUMENTS PREPAREDBY THE ARCHITECTS FOR THIS PROJECT ARE INSTRUMENTS OF THEARCHITECT'S SERVICE FOR USE SOLEY WITH RESPECT TO THIS PROJECTAND UNLESS OTHERWISE PROVIDED THE ARCHITECT SHALL BE DEEMEDTHE AUTHOR OF THESE DOCUMENTS AND SHALL RETAIN ALL COMMONLAW, STATUTORY AND OTHER RESERVED RIGHTS, INCLUDING THECOPYRIGHT. REPRODUCTION IS PROHIBITED. COPYRIGHT 2019. STUDIOGANG ARCHITECTS.2. CONTRACTORS AND SUBCONTRACTORS SHALL VERIFY ALL FIGUREDDIMENSIONS AND CONDITIONS AT THE JOBSITE AND NOTIFY THEARCHITECT OF ANY DIMENSIONAL ERRORS, OMISSIONS ORDISCRAPENCIES BEFORE BEGINNING OR FABRICATION OF ANY WORK. DONOT SCALE THESE DRAWINGS.MacArthur Park501 East 9th StreetLittle Rock, AR 72202LITTLE ROCK, ARKANSAST 312.915.0557T 49.228.91422-102019 Studio Gang Architectsc123456789101112ABCDEFGHIJ01 75% Schematic Design for Pricing 04/27/201802 70% Design Development for Pricing 10/26/201803 100% Design Development 01/31/201904 60% Construction Documents & Bid Six 06/07/201905 Permit & Bid 08/16/201908/16/2019Drawing Number:16061Project No :No.Issued forDateCivil Engineer7302 Kanis RoadLittle Rock, AR 72204Sheet Title :EH4Drawn :Checked :DGBDate :Scale :1" = 20'-0"McClelland Consulting EngineersLandscape Architect277 Broadway Suite 1606New York, NY 10007SCAPEMechanical / Electrical / Plumbing / Fire Protection303 W. Erie Street Suite 510Chicago, IL 60654db | HMSStructural Engineer + Enclosure Consultant330 N. Wabash Avenue, Suite 1500Chicago, IL 60611Thornton TomasettiEnvironmental Design Consultant303 W. Erie Street Suite 510Chicago, IL 60654db | HMSLighting DesignerJagdweg 16D-53155 Bonn, GermanyLicht Kunst Licht AGAcoustical / Theatrical / AV Consultant35 East Wacker Drive, Suite 1800Chicago, IL 60601ARUPT 312.596.2000T 312.915.0557T 212.462.2628T 501.371.0272T 312.849.5610Associate Architect2222 Cottondale Lane Suite 100Little Rock, AR 72202Polk Stanley Wilcox ArchitectsT 501.378.08781520 W. Division StreetChicago, Illinois 60642T 773.384.1212ARCHITECT OF RECORDARKANSASARTS CENTERGENERAL NOTES1. THE DRAWINGS, SPECIFICATIONS AND OTHER DOCUMENTS PREPAREDBY THE ARCHITECTS FOR THIS PROJECT ARE INSTRUMENTS OF THEARCHITECT'S SERVICE FOR USE SOLEY WITH RESPECT TO THIS PROJECTAND UNLESS OTHERWISE PROVIDED THE ARCHITECT SHALL BE DEEMEDTHE AUTHOR OF THESE DOCUMENTS AND SHALL RETAIN ALL COMMONLAW, STATUTORY AND OTHER RESERVED RIGHTS, INCLUDING THECOPYRIGHT. REPRODUCTION IS PROHIBITED. COPYRIGHT 2019. STUDIOGANG ARCHITECTS.2. CONTRACTORS AND SUBCONTRACTORS SHALL VERIFY ALL FIGUREDDIMENSIONS AND CONDITIONS AT THE JOBSITE AND NOTIFY THEARCHITECT OF ANY DIMENSIONAL ERRORS, OMISSIONS ORDISCRAPENCIES BEFORE BEGINNING OR FABRICATION OF ANY WORK. DONOT SCALE THESE DRAWINGS.MacArthur Park501 East 9th StreetLittle Rock, AR 72202LITTLE ROCK, ARKANSAST 312.915.0557T 49.228.91422-102019 Studio Gang Architectsc123456789101112ABCDEFGHIJ01 75% Schematic Design for Pricing 04/27/201802 70% Design Development for Pricing 10/26/201803 100% Design Development 01/31/201904 60% Construction Documents & Bid Six 06/07/201905 Permit & Bid 08/16/201908/16/2019Drawing Number:16061Project No :No.Issued forDateCivil Engineer7302 Kanis RoadLittle Rock, AR 72204Sheet Title :EH4Drawn :Checked :DGBDate :Scale :1" = 20'-0"McClelland Consulting EngineersLandscape Architect277 Broadway Suite 1606New York, NY 10007SCAPEMechanical / Electrical / Plumbing / Fire Protection303 W. Erie Street Suite 510Chicago, IL 60654db | HMSStructural Engineer + Enclosure Consultant330 N. Wabash Avenue, Suite 1500Chicago, IL 60611Thornton TomasettiEnvironmental Design Consultant303 W. Erie Street Suite 510Chicago, IL 60654db | HMSLighting DesignerJagdweg 16D-53155 Bonn, GermanyLicht Kunst Licht AGAcoustical / Theatrical / AV Consultant35 East Wacker Drive, Suite 1800Chicago, IL 60601ARUPT 312.596.2000T 312.915.0557T 212.462.2628T 501.371.0272T 312.849.5610Associate Architect2222 Cottondale Lane Suite 100Little Rock, AR 72202Polk Stanley Wilcox ArchitectsT 501.378.08781520 W. Division StreetChicago, Illinois 60642T 773.384.1212ARCHITECT OF RECORDARKANSASARTS CENTERGENERAL NOTES1. THE DRAWINGS, SPECIFICATIONS AND OTHER DOCUMENTS PREPAREDBY THE ARCHITECTS FOR THIS PROJECT ARE INSTRUMENTS OF THEARCHITECT'S SERVICE FOR USE SOLEY WITH RESPECT TO THIS PROJECTAND UNLESS OTHERWISE PROVIDED THE ARCHITECT SHALL BE DEEMEDTHE AUTHOR OF THESE DOCUMENTS AND SHALL RETAIN ALL COMMONLAW, STATUTORY AND OTHER RESERVED RIGHTS, INCLUDING THECOPYRIGHT. REPRODUCTION IS PROHIBITED. COPYRIGHT 2019. STUDIOGANG ARCHITECTS.2. CONTRACTORS AND SUBCONTRACTORS SHALL VERIFY ALL FIGUREDDIMENSIONS AND CONDITIONS AT THE JOBSITE AND NOTIFY THEARCHITECT OF ANY DIMENSIONAL ERRORS, OMISSIONS ORDISCRAPENCIES BEFORE BEGINNING OR FABRICATION OF ANY WORK. DONOT SCALE THESE DRAWINGS.MacArthur Park501 East 9th StreetLittle Rock, AR 72202LITTLE ROCK, ARKANSAST 312.915.0557T 49.228.91422-102019 Studio Gang Architectsc123456789101112ABCDEFGHIJ01 75% Schematic Design for Pricing 04/27/201802 70% Design Development for Pricing 10/26/201803 100% Design Development 01/31/201904 60% Construction Documents & Bid Six 06/07/201905 Permit & Bid 08/16/201906 Bulletin # 31A 02/09/2021111111111111111one waynoparking222233A4QUAPAWLINEMARKERARTSCENTERSTOPnoparkingPARKHOURS55555555BRICK PAVING TO BE REPLACEDW ALTERNATE MATERIALCONCRETE SIDEWALKTO BE REPLACE "IN KIND"CONCRETESIDEWALKTO BE REPLACE"IN KIND"CONCRETESIDEWALKTO BE REPLACE"IN KIND"4PARK BENCHES - TO BE REMOVED AND TURNED OVER TOPARKS DEPARTMENT FOR RE-INSTALLATION (14 TOTAL)TRAFFIC/PARKING SIGNS - TO BE REMOVED & REPLACEDFOR NEW TRAFFIC FLOW DIRECTIONPARK SIGN REMOVEDART CENTER SIGN REMOVEDHISTORIC MARKER - UNCHANGEDGLOBE STYLE LIGHT POLE - TO BE REMOVED (TOTAL 14)PAVING/HARDSCAPE TO BE REMOVEDBRICK HARDSCAPE TO BE REPLACED W/ ALTERNATEMATERIAL - SALVAGE & TURN OVER TO PARKS DEPTCONCRETE PAVING TO BE REPLACED "IN KIND"533A1252ONEWAYEXISTINGGLOBE LIGHTTO REMAINEXISTINGGLOBE LIGHTTO REMAINEXISTINGGLOBE LIGHTTO REMAINEXISTINGGLOBE LIGHTTO REMAIN553