HomeMy WebLinkAboutHC package 1 3.29.21 2nd submission-compressedPackage 1
Site Signage Proposal
Arkansas Musuem of Fine Arts
Historic Commission COA Filing03.29.21
Arkansas Museum of Fine Arts
Exterior Signage
Sign Location Plans
18 February 2021
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
1
PROJECT DESIGNERS
Page Southerland Page, Inc
NOTES
This list represents the various types of signs
used in the experiential graphics system for
the Arkansas Arts Center.
This list is regularly referenced when
describing signs throughout this document.
Any gaps in the numbering sequence are to
account for anticipated future sign needs to
further complete the sign system.
This package seeks to capture all potential
life safety and code required items. The
Arkansas Arts Center facility signage will
comply with all governing codes pending
coordination with consultants and municipal
entities.
Sign Type List
SIGN TYPE DESCRIPTION QUANTITY SIGN TYPE DESCRIPTION QUANTITY
Series 100 Exterior Site & Building
100 Primary Monument ID 01
101 Secondary Monument ID 01
102 Courtyard Arrival ID 01
103 Terrace Arrival ID 01
120 Waynding Directional 08
125 Freestanding Banner 03
130 Building Address 01
131 Entrance Graphics 02
132 No Smoking Vinyl 02
140 Vehicular Regulatory 08
150 Accessible Parking ID 11
151 Parking ID, Other 00
Series 300 Base Building
300 Room ID 41
301 Room ID with Name 54
301.2 Room ID with Name, Specialty 18
302 Room ID with Insert 25
303 Restroom ID 24
304 Stair ID (Occupancy Side) 09
305 Stair Exit Directional 07
306 Regulatory Plaque 02
307 Regulatory Vinyl 00
308 Occupancy Plaque 17
309 Elevator Fire Safety 09
310 Elevator Jamb ID 20
312 Exit ID 15
Series 400 Interior Wayfinding
400 Entrance Hall Reception Display 01
401 Atrium Reception Display 01
403 Visitor Services ID 08
404 Visitor Services ID, Blade 08
410 Building Directory 04
420 Waynding Directional 04
425 Overhead Directional 02
430 Blossom Entrance ID 03
Series 500 Donor Recognition
500 Donor Wall (21st Century and Leadership) 02
501 Donor Recognition (Annual Fund) 01
502 Donor Recognition (25k+) 01
503 Donor Recognition (Legacy) 01
510 Signature Space ID with Donor Name 12
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
2
PROJECT DESIGNERS
Page Southerland Page, Inc
MATCHLINE
PROJECT
Arkansas Arts Center
LITTLE ROCK, ARKANSAS
PROJECT DESIGNERS
Page Southerland Page, Inc
DATE
10 December 2020
PAGE
3
Sign Location Plan Site Plan North
008
004
006
014
016 018
010
020
012
002
Note:
Locations and quanities for accessible
SDUNLQJLGHQWLÀFDWLRQDQG´GRQRWHQWHUµ
signs per Civil Engineer drawings; refer
to C-301 and C-302 for details
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
3
PROJECT DESIGNERS
Page Southerland Page, Inc
MATCHLINE
PROJECT
Arkansas Arts Center
LITTLE ROCK, ARKANSAS
PROJECT DESIGNERS
Page Southerland Page, Inc
DATE
10 December 2020
PAGE
4
Sign Location Plan Site Plan South
032
034
036028
024
022
038030
026
040
044
042
046
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
4
PROJECT DESIGNERS
Page Southerland Page, Inc
MATCHLINE
LEGEND
Waynding
Donor
Lighting
Digital / Power
Sign Location Plan Site Plan North
054
048 050 052
058
060
062
056
064
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
5
PROJECT DESIGNERS
Page Southerland Page, Inc
MATCHLINE
LEGEND
Waynding
Donor
Lighting
Digital / Power
Sign Location Plan Site Plan South
066
072
070
074
076
068
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
6
PROJECT DESIGNERS
Page Southerland Page, Inc
Arkansas Museum of Fine Arts
Exterior Signage
Documentation
18 February 2021
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
1
PROJECT DESIGNERS
Page Southerland Page, Inc
General Notes & Requirements
Layout
1 Message Layouts, Margins and Graphics
Generally, this signage system uses
a modular grid to create the size and
proportional relationships of signs
throughout the project. All layout
measurements are depicted using
measurement color guides (key shown at
right) for each sign type.
Dened on the Graphic Layouts for each
sign, these measurements are broken
out into commonly used dimensions
that appear throughout the signs in all
the series. Using color as the indicator,
each element of the sign is broken out
into its own area. Individual Graphic
Layouts contain three layout views for
each sign type: (1) Build View illustrates
how the actual sign will appear, (2)
Spacing Measurements, and (3) Graphic
Measurements.
If document is reproduced in black and
white or grayscale, Page/Dyal Branding
& Graphics can provided an 11x17
formatted color pdf document.
2 Spacing
Spacing refers to the distance between
unique content elements of each
layout. For specics on leading and line
spacing, see typography section of this
document. For all others, refer to spacing
measurements shown on the Graphic
Layouts.
3 Content
Content on each sign is shown for
illustrative purposes only. Refer to the
message schedule for location specic
information.
4 Measurement Color Guides Key
A full set of measurements is illustrated below as a color key. Measurements noted
bold are used in this documentation set.
Typography
1 Font Family
GT America is used in four weights:
Regular, Regular Condensed, Medium,
and Medium Condensed. This applies to
all signage. Please note any exceptions
on the Graphic Layouts of this document.
The fonts shown in this document are for
reference only, and may not in any way
be used as artwork. No font substitutions
are allowed. Font names must match
exactly for accurate execution of design.
Sign Contractor/Fabricator is required
to purchase all typefaces specied for
project.
2 Where to Purchase Font
GT America can be purchased at: https://
www.grillitype.com/shops/gt-america
3 Character Height/Line Spacing
Specic type measurements are indicated
on the Graphic Layouts for each sign. These
measurements dene character height,
baseline spacing and space between lines
of text in a list format.
All type throughout this system maintains
the same leading, kerning, and tracking
styles unless otherwise noted.
All leading maintains a ratio of 100% of the
type size (for example, 10-point leading
for 10-point type). Leading refers to the
vertical distance between the baselines of
successive lines of type. This is measured
from the baseline of text to the following line
of text's baseline.
All kerning is set to "optical". Tracking is set
to "-5" unless otherwise noted.
4 Measuring Type
Type is measured from the baseline of
a character to the top of the character.
Please note characters like "b", "g", or
"C", how the curves of these—and similar
characters—will drop below the baseline
or extend above the capline.
Here is a simple guide for reference:
Capline
Baseline Abg12
5 ADA Text/Braille
Unless otherwise noted, all ADA text is
aligned with top left margin with 5/8" cap
height, rendered in all caps. Text is tactile.
All Braille is standard 1/4" height and
spaced 3/8" after the tactile text based
on ADA requirements. Braille color to
match the plaque face.
6 Symbols/Logos
The symbols used in the project are
based on AIGA international symbol
library with customization as required per
the project specics. Page/Dyal Branding
& Graphics will supply the project
symbol set as vector EPS le types. See
Typography and Symbols page of this
document for reference.
For dimension specications, please
refer to the measurement notes on the
Graphic Layouts. When scaling, Sign
Contractor to ensure correct proportions
and spacing is maintained.
Document Contents/Description
1 Sign Location Plan
A Sign Location Plan—or SLP—identies
the areas of the site where signs will be
placed. The message schedule, used in
conjunction with the SLP, indicates the
sign type, and message/content that will
go in the identied sign location.
2 Sign Type List
The Sign Types that appear across the
project are identied in this list and
organized by series. Various messages
exist for all sign types. The SLP will
indicate the sign type needed.
3 Sign Type Sheet
Fabrication needs and performance
criteria are provided for each sign type.
Each sign is presented with the level of
detail needed to properly build and install
the sign according to Page/Dyal Branding
& Graphics’ specication.
4 Graphic Layout
Each sign message is designed on a
grid according to Page/Dyal Branding &
Graphics’ specication. Specic details
for message layouts, margins, and
graphic measurements are provided for
applicable sign types.
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
2
PROJECT DESIGNERS
Page Southerland Page, Inc
other
1/8"
1/4"
3/8"
1/2"
5/8"
3/4"
7/8"
1"
1–1/8"
1–1/4"
1–3/8"
1–1/2"
1–5/8"
1–3/4"
1–7/8"
2"
2–1/8"
2–1/4"
2–3/8"
2–1/2"
2–5/8"
2–3/4"
2–7/8"
3"
3–1/8"
3–1/4"
3–3/8"
3–1/2"
3–5/8"
3–3/4"
3–7/8"
4"
4–1/8"
4–1/4"
4–3/8"
4–1/2"
4–5/8"
4–3/4"
4–7/8"
5"
5–1/8"
5–1/4"
5–3/8"
5–1/2"
5–5/8"
5–3/4
5–7/8"
6"
6–1/8"
6–1/4"
6–3/8"
6–1/2"
6–5/8"
6–3/4"
6–7/8"
7"
7–1/8"
7–1/4"
7–3/8"
7–1/2"
7–5/8"
7–3/4"
7–7/8"
8"
8–1/8"
8–1/4"
8–3/8"
8–1/2"
8–5/8"
8–3/4
8–7/8"
9"
9–1/8"
9–1/4"
9–3/8"
9–1/2"
9–5/8"
9–3/4
9–7/8"
General Notes & Requirements
Colors used on signage are as follows:
Color C1
MP13795 Graynola
Color C2
MP03076 Neutro Grey
Color C3
BM2121-70 Chantilly Lace
Powder-coated White - TBD
All colors to have Satin nish unless
noted otherwise.
All white colors (ink or paint) to be opaque
with no background color bleed-through.
All exterior signs and sign panels
to receive UV resistant top coat as
appropriate.
1 General Fabrication Notes
a Refer to 10 1400 document for detailed
specications guidelines.
b All sign mounting conditions to be
coordinated between Sign Contractor
and General Contractor and/or Architect
as appropriate.
c Sign Contractor is responsible for
obtaining all required permits.
d Sign Contractor/Fabricator’s logo/
information decal to be placed on signs
only if required by local ordinance. Any
required information to be minimal in
nature and be hidden from normal view.
e Sign Contractor to conrm color
temperature of exterior architectural
lighting. Illumination of exterior signs
to match the color temperature of
architectural lighting.
f Sign Contractor to coordinate with Owner
or General Contractor to have building
power brought to illuminated sign
locations.
g Sign Contractor to patch all materials
affected by facade penetrations
(for power and/or mounting) to pre-
installation standards. Sign Contractor
to coordinate with Owner or General
Contractor as required.
h Sign Contractor to coordinate with
Owner or General Contractor to have any
required blocking installed at required
sign locations.
i Structural items as required by Architect
or state/local ordinances, to be stamped
by an Engineer licensed to practice in the
State of Texas. Owner, and or Architect to
direct Sign Contractor to obtain stamped
engineering documents for sign types as
required.
j All signs within the pedestrian zone to be
fabricated to withstand an average level
of public interaction.
k All exterior signs to be fabricated to
withstand the average wind-load of the
area with minimal (1” or less) deection.
l Signs to have internal bracing as required
ensuring faces are true and free from oil-
canning or other imperfections.
m Exterior signs to be vented to prevent
moisture collection on interior. If weep
holes are required by code, they are to
be fabricated in such a way as to prevent
insect inltration of sign. Vents to be
insect resistant.
n All paint nishes to have a Satin sheen,
unless otherwise specied. All ADA
governed signs to have Matte, Non-Glare
ADA compliant nish.
o Applied letters and/or graphics shall not
be subject to peeling.
p All visible welds to be ground and
nished.
q Exposed fasteners are not permitted
unless noted on the sign design
drawings. If exposed fasteners are used,
they are to be of consistent type and
evenly spaced. All exposed fasteners on
signs at the pedestrian level to be of a
security type. Layout and specication of
all exposed fasteners to be shown and
noted on signage shop drawings.
r Sign locations may be adjusted in eld
based on actual paver layout.
s All dimensions shown on design
drawings as Verify In Field or similar are
to be veried and provided by General or
Sign Contractor as appropriate.
t Sign design drawings and specications
may be updated by email, RFI, ASI, or
other means of standard communication.
Sign Contractor is responsible for
verifying that most recent specication
and design information is being used in
the fabrication of all signage elements.
u See 10 1400 Signage Specications for
additional fabrication specications and
requirements.
v This list is not all-inclusive and may be
added to at any time.
Fabrication and Submittal
Material, Color, and Finish
A variety of color reference systems may
be used to communicate color selection.
The colors displayed here are for reference
only, and may not in any way be used
for color matching. No color, material, or
nish substitutions are allowed without
prior approval. Actual color, nish, and
specication take precedence over any
visual representation in this document.
Materials used on signage are as follows:
Material M1
Warm Concrete
Material M2
Non-directional (Random-brushed)
Stainless Steel
Vinyl used on signage are as follows:
Vinyl V1
3M Diffuser Film White
40% Light Transmission
Vinyl V2
PMS 7579C
2 General Submittal Notes
a Fabricator to provide submittal schedules
at onset of project.
b Required submittals are noted in 10 1400,
Part A 1.3 Submittals and mockups/
prototypes are noted in 10 1400
Appendix A. Unless stated otherwise, all
approved mockups may be installed as
permanent signs.
c All submittals are required to have a Log
Number afxed. See 10 1400, Part A 1.3
Submittals for additional information on
the Log Number standard.
d All submittals are required to have a
Contractor Review Stamp afxed on
a cover letter. The review stamp will
indicate that the submittal has passed
the Contractor's internal QA/QC review
process.
e Any submittal that does not contain a Log
Number or Contractor Stamp will be sent
back with no review.
f General/Sign contractor to submit full
shop drawings of all signs for approval
prior to fabrication. All shop drawings are
to be created new for the project and are
to illustrate actual installation conditions.
"Standard Details" are not acceptable.
g Fabricator to submit layout of all signs per
10 1400, Part A 1.3 Submittals, Paragraph I.
h This list is not all-inclusive and may be
added to at any time.
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
3
PROJECT DESIGNERS
Page Southerland Page, Inc
Material, Color, & Finish
M1
Warm Concrete
Color, aggregate mix, etc. to
be consistent with Landscape
Architect's specication
M2
Non-Directional (Random-brushed)
Stainless Steel
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
4
C1
MP13795 Graynola
Satin Finish
C2
MP03076 Neutro Gray
Satin Finish
C3
BM2121-70 Chantilly Lace
Satin Finish
Powder-coated White - TBD
V1
3M Diffuser Film White
40% Light Transmission
V2
PMS 7579C
PROJECT DESIGNERS
Page Southerland Page, Inc
GT America Condensed Regular
ACBDEFGHIJKLMNOPQRSTUVWXYZ
abcdefghijklmnopqrstuvwxyz
1234567890
GT America Condensed Medium
ACBDEFGHIJKLMNOPQRSTUVWXYZ
abcdefghijklmnopqrstuvwxyz
1234567890
GT America Medium
ACBDEFGHIJKLMNOPQRSTUVWXYZ
abcdefghijklmnopqrstuvwxyz
1234567890
GT America Regular
ACBDEFGHIJKLMNOPQRSTUVWXYZ
abcdefghijklmnopqrstuvwxyz
1234567890
Symbol Set
Arrow Set
Font Set
Logo Set
Typography & Symbols
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
5
PROJECT DESIGNERS
Page Southerland Page, Inc
NOTES
This list represents the various types of signs
used in the experiential graphics system for
the Arkansas Arts Center.
This list is regularly referenced when
describing signs throughout this document.
Any gaps in the numbering sequence are to
account for anticipated future sign needs to
further complete the sign system.
This package seeks to capture all potential
life safety and code required items. The
Arkansas Arts Center facility signage will
comply with all governing codes pending
coordination with consultants and municipal
entities.
Sign Type List
SIGN TYPE DESCRIPTION QUANTITY SIGN TYPE DESCRIPTION QUANTITY
Series 100 Exterior Site & Building
100 Primary Monument ID 01
101 Secondary Monument ID 01
102 Courtyard Arrival ID 01
103 Terrace Arrival ID 01
120 Waynding Directional 08
125 Freestanding Banner 03
130 Building Address 01
131 Entrance Graphics 02
132 No Smoking Vinyl 02
140 Vehicular Regulatory 08
150 Accessible Parking ID 11
151 Parking ID, Other 00
Series 300 Base Building
300 Room ID 41
301 Room ID with Name 54
301.2 Room ID with Name, Specialty 18
302 Room ID with Insert 25
303 Restroom ID 24
304 Stair ID (Occupancy Side) 09
305 Stair Exit Directional 07
306 Regulatory Plaque 02
307 Regulatory Vinyl 00
308 Occupancy Plaque 17
309 Elevator Fire Safety 09
310 Elevator Jamb ID 20
312 Exit ID 15
Series 400 Interior Wayfinding
400 Entrance Hall Reception Display 01
401 Atrium Reception Display 01
403 Visitor Services ID 08
404 Visitor Services ID, Blade 08
410 Building Directory 04
420 Waynding Directional 04
425 Overhead Directional 02
430 Blossom Entrance ID 03
Series 500 Donor Recognition
500 Donor Wall (21st Century and Leadership) 02
501 Donor Recognition (Annual Fund) 01
502 Donor Recognition (25k+) 01
503 Donor Recognition (Legacy) 01
510 Signature Space ID with Donor Name 12
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
6
PROJECT DESIGNERS
Page Southerland Page, Inc
Series 100
Exterior Site & Building
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
7
PROJECT DESIGNERS
Page Southerland Page, Inc
1937 Entrance
AMFA Café
Gift Shop
E 9th Street
Visitor Parking
Commerce Street
Museum
Entrance
Visitor
Parking
100 - Primary Monument ID
101 - Secondary Monument ID
102 - Courtyard Arrival ID
103 - Terrace Arrival ID
125 - Freestanding Banner
120 - Waynding Directional Alternative Layout
40'
28'
1'-9"
5'
15'
5'
5'
4 1/2"
7'-6"
4 1/2"
Sign System Overview Series 100
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
8
PROJECT DESIGNERS
Page Southerland Page, Inc
Reserved
Parking
Van Accessible
Loading
Dock
Authorized
Vehicles Only
Electric
Vehicle
Parking
No smoking within 25 feet of building
entrances, exits, and operable windows.
501
1937 Courtyard Entrance
Mon–Fri 10:00 AM–6 PM
Saturday 10:30 AM–9 PM
Sunday CLOSED
130 - Building Address
131 - Entrance Graphics
132 - No Smoking Vinyl
140 - Vehicular Regulatory 150 - Accessible Parking ID 151 - Parking ID, Other
12"
12"
22"
Sign System Overview Series 100
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
9
PROJECT DESIGNERS
Page Southerland Page, Inc
Series 100
Detailed Sign Location Plans
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
10
PROJECT DESIGNERS
Page Southerland Page, Inc
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
11
PROJECT DESIGNERS
Page Southerland Page, Inc
Sign Type 100 - Primary Monument ID – Location 054 Sign Type 101 - Secondary Monument ID – Location 074
Sign Type 120 - Waynding Directional – Location 076
Sign Type 102 - Courtyard Arrival ID – Location 060
Sign Type 120 - Waynding Directional – Location 062Sign Types 103 - Terrace Arrival ID – Location 066
Detailed Sign Locations Series 100
TTTT T
T TTT
T HISTORIC EASEMENTGAS
FH
FH
CB
WATER
MAIN
HB
HB
HB
HB
<+
<+
DI
DI
DI
DI
MH
MH
MH
MH
MH
MH
MH
<+
FUTURE
SCULPTURE
LOCATION
HB
MH
DI
ELECTRIC
TRANSFORMER20' TYP.20'-0" TYP.
8'-8"11'-4"CL10'-2"9'-11"19'18'
QP
QP
QP
QP
QP
QPh1QB2
QM2
QM2
QM2
QM2
QB2QPh1
QPh1QMa1 QMa1
QMa1
TC
QM1
QM1
QM1
QMa1
NS1 NS1 NS1
NS1
NS1
NS1
NS1
NS1
NS1 NS1
NS1
NS1
NS1
NS1
NS1
NS1
NS1
NS1
NS1 NS1 NS1
NS1 NS1
NS1 NS1
NS1 NS1 TC
MV
MV
MV
NS1
QB1
QB1
MV MV MVMVMV
MV
MV MVMVMV
MV
MV
MV
MV
MV
MV
MV
MV
MV
MV
MV
MV
MV
MVMV
MV MV MVMVMV
MV
MV
MV MV MV
QM2 QPh1
QMa1
LEGEND
LIMIT OF WORK LINE
SHRUB AND GROUNDCOVER,
SEE L420 & L421
PROPOSED TREE PLANTING
EXISTING TREE
DI
FH
HB
STONE FLAG
BUILDING ENTRANCE
MH
EXISTING UTILITY STRUCTURES,
SEE CIVIL DWGS
PROPOSED UTILITY STRUCTURES,
SEE CIVIL DWGS
DI
MH
HOSE BIB, SEE MEP DWGS
PROPOSED FIRE HYDRANT,
SEE CIVIL DWGS
CB
<+YARD HYDRANT, SEE
IRRIGATION SPECS
LOG PATH
PROPOSED SHRUB PLANTING
NS2QPh
NOTE:
1.SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.SEE L-400 FOR PLANTING SCHEDULE
NOTES:
1.ALL PLANTING AREAS TO BE IRRIGATED, SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.CONTRACTOR SHALL PROVIDE LANDSCAPE ARCHITECT WITH MIN. 24 HOUR ADVANCE NOTICE OF PLANT INSTALLATION.
3.ALL PLANTS SHALL BE PLANTED AT THE TIME OF DELIVERY DUE TO LIMITED STORAGE ON SITE. PLANTS IN THE SAME PLANTING BED SHALL BE PLANTED AT
THE SAME TIME. ANY PLANTS REMAINING UNPLANTED ON THE SITE FOR MORE THAN 24 HOURS SHALL BE PROTECTED AND MAINTAINED INCLUDING BUT NOT
LIMITED TO PROVIDING WATER AND SHADE. ANY PLANTS THAT DIE OR ARE DAMAGED DUE TO ON-SITE STORAGE SHALL BE REPLACED AT THE CONTRACTOR'S
EXPENSE.
4.THERE WILL BE NO SUBSTITUTIONS OF PLANT MATERIAL WITHOUT PRIOR WRITTEN APPROVAL BY THE LANDSCAPE ARCHITECT.
5.MATERIAL WILL BE INSPECTED AND APPROVED AT PLACE OF GROWTH BY THE LANDSCAPE ARCHITECT. HOWEVER, PLANT MATERIAL WHICH HAS BECOME
DAMAGED OR DISEASED OR WHICH IS UNACCEPTABLE TO THE LANDSCAPE ARCHITECT MAY BE REJECTED UPON DELIVERY TO THE SITE.
6.SHOULD THERE BE ANY DISCREPANCIES BETWEEN THE QUANTITIES CALLED FOR ON THE PLANT LIST AND THOSE INDICATED ON THE PLAN, NOTIFY
LANDSCAPE ARCHITECT FOR CLARIFICATION.
7.AT ALL TIMES, THE SITE SHALL BE KEPT NEAT AND FREE OF DEBRIS LEFT FROM THE PLANTING OPERATION.
8.ALL PLANT MATERIAL SHALL BE KEPT VIGOROUS, AND FREE OF ANY INJURY AND DEFECTS. ALL PLANT MATERIAL SHALL BE A TRUE REPRESENTATION OF
THEIR SPECIES.
9.PLANT GROUPINGS AND LOCATIONS ARE DIAGRAMMATIC. THE LOCATION OF PLANTS SHALL BE APPROVED IN THE FIELD BY THE LANDSCAPE ARCHITECT
PRIOR TO INSTALLATION. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO MAKE ADJUSTMENTS TO ANY AND ALL PLANTING LAYOUT IN THE FIELD AT NO
ADDITIONAL COST TO THE OWNER.
10.ALL PLANT TAGS MUST REMAIN ON THE PLANT MATERIAL UNTIL THE LANDSCAPE ARCHITECT REVIEWS THE LAYOUT AND APPROVES THE QUANTITIES.
11.PLANTING BEDS SHALL RECEIVE A 2" THICK LAYER OF MULCH, INDICATED ON THE PLANTING DETAILS.
12.SEE SHEET L-400 FOR PLANT SCHEDULE.
13.SEE L-820 FOR PLANTING DETAILS.
14.SEE L-830 FOR SOIL DETAILS.
14.SEE L-310 & L-311 FOR SOILS PLAN.
8
8
8
FH
HB
HB
<+
<+
<+
<+
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
FUTURE
SCULPTURE
LOCATION
20'42'19'40'-11"20'-1"
TD1
TD1
TD1
TD1
TD1
TD2
TD1
TD1
TD1
TD2
NS1
TD1
NS1
TD2
TD2
TD2
NS2
TD2
NS2
NS2
NS2
TD2
NS2
TD2
NS2
TD2
TD2
TD2
TD2
TD2
NS2
NS2
NS2
NS2
NS2
NS2
TD2
TD2TD2
TD2
NS2
TD2
NS1 TD2
NS2
TD2
NS2
NS2
TD2
TD2
TD3
NS3
TD2
TD3
TD3
TD2
TD3
TD2
TD2
NS3
QB2
NS1 NS1
NS1NS1
NS1 NS1
TC TC
TC TC
TC TC TC
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
MV MV MV MV MV MV MV
MVMV
QPh2
QPh2
MV
MV
QPh1
QPh1
QPh1
NS1
NOTE:
1.SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.SEE L-400 FOR PLANTING SCHEDULE
LEGEND
LIMIT OF WORK LINE
SHRUB AND GROUNDCOVER,
SEE L420 & L421
PROPOSED TREE PLANTING
EXISTING TREE
DI
FH
HB
STONE FLAG
BUILDING ENTRANCE
MH
EXISTING UTILITY STRUCTURES,
SEE CIVIL DWGS
PROPOSED UTILITY STRUCTURES,
SEE CIVIL DWGS
DI
MH
HOSE BIB, SEE MEP DWGS
PROPOSED FIRE HYDRANT,
SEE CIVIL DWGS
CB
<+YARD HYDRANT, SEE
IRRIGATION SPECS
LOG PATH
PROPOSED SHRUB PLANTING
NS2QPh
0 8'16'32'
SCALE: 1/16" = 1'-0"
NOTES:
1.ALL PLANTING AREAS TO BE IRRIGATED, SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.CONTRACTOR SHALL PROVIDE LANDSCAPE ARCHITECT WITH MIN. 24 HOUR ADVANCE NOTICE OF PLANT INSTALLATION.
3.ALL PLANTS SHALL BE PLANTED AT THE TIME OF DELIVERY DUE TO LIMITED STORAGE ON SITE. PLANTS IN THE SAME PLANTING BED SHALL BE PLANTED AT
THE SAME TIME. ANY PLANTS REMAINING UNPLANTED ON THE SITE FOR MORE THAN 24 HOURS SHALL BE PROTECTED AND MAINTAINED INCLUDING BUT NOT
LIMITED TO PROVIDING WATER AND SHADE. ANY PLANTS THAT DIE OR ARE DAMAGED DUE TO ON-SITE STORAGE SHALL BE REPLACED AT THE CONTRACTOR'S
EXPENSE.
4.THERE WILL BE NO SUBSTITUTIONS OF PLANT MATERIAL WITHOUT PRIOR WRITTEN APPROVAL BY THE LANDSCAPE ARCHITECT.
5.MATERIAL WILL BE INSPECTED AND APPROVED AT PLACE OF GROWTH BY THE LANDSCAPE ARCHITECT. HOWEVER, PLANT MATERIAL WHICH HAS BECOME
DAMAGED OR DISEASED OR WHICH IS UNACCEPTABLE TO THE LANDSCAPE ARCHITECT MAY BE REJECTED UPON DELIVERY TO THE SITE.
6.SHOULD THERE BE ANY DISCREPANCIES BETWEEN THE QUANTITIES CALLED FOR ON THE PLANT LIST AND THOSE INDICATED ON THE PLAN, NOTIFY
LANDSCAPE ARCHITECT FOR CLARIFICATION.
7.AT ALL TIMES, THE SITE SHALL BE KEPT NEAT AND FREE OF DEBRIS LEFT FROM THE PLANTING OPERATION.
8.ALL PLANT MATERIAL SHALL BE KEPT VIGOROUS, AND FREE OF ANY INJURY AND DEFECTS. ALL PLANT MATERIAL SHALL BE A TRUE REPRESENTATION OF
THEIR SPECIES.
9.PLANT GROUPINGS AND LOCATIONS ARE DIAGRAMMATIC. THE LOCATION OF PLANTS SHALL BE APPROVED IN THE FIELD BY THE LANDSCAPE ARCHITECT
PRIOR TO INSTALLATION. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO MAKE ADJUSTMENTS TO ANY AND ALL PLANTING LAYOUT IN THE FIELD AT NO
ADDITIONAL COST TO THE OWNER.
10.ALL PLANT TAGS MUST REMAIN ON THE PLANT MATERIAL UNTIL THE LANDSCAPE ARCHITECT REVIEWS THE LAYOUT AND APPROVES THE QUANTITIES.
11.PLANTING BEDS SHALL RECEIVE A 2" THICK LAYER OF MULCH, INDICATED ON THE PLANTING DETAILS.
12.SEE SHEET L-400 FOR PLANT SCHEDULE.
13.SEE L-820 FOR PLANTING DETAILS.
14.SEE L-830 FOR SOIL DETAILS.
15.SEE L-310 & L-311 FOR SOILS PLAN.
7TTTTT
T TTT
T HISTORIC EASEMENTGAS
FH
FHCB
WATER
MAIN
HB
HB
HB
HB
<+<+
DI
DI
DI
DI
MH
MH
MH
MHMH
MH
MH<+FUTURESCULPTURELOCATION
HB
MH DI
ELECTRIC
TRANSFORMER20' TYP.20'-0" TYP.8'-8"11'-4"CL10'-2"9'-11"19'18'
QPQP QPQPQPQPh1QB2QM2QM2QM2QM2QB2QPh1QPh1QMa1QMa1QMa1
TC
QM1 QM1 QM1QMa1NS1NS1NS1NS1NS1NS1NS1NS1
NS1 NS1
NS1 NS1NS1 NS1NS1NS1NS1NS1
NS1 NS1 NS1
NS1 NS1
NS1 NS1
NS1 NS1 TC
MV MV
MV
NS1 QB1 QB1MVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMV
MV
MV
MV
MV
MV
MV
MVMV
MV MV MVMVMV
MV
MV
MV MV MV
QM2 QPh1QMa1
LEGEND
LIMIT OF WORK LINE
SHRUB AND GROUNDCOVER,
SEE L420 & L421
PROPOSED TREE PLANTING
EXISTING TREE
DI
FH
HB
STONE FLAG
BUILDING ENTRANCE
MH
EXISTING UTILITY STRUCTURES,
SEE CIVIL DWGS
PROPOSED UTILITY STRUCTURES,
SEE CIVIL DWGS
DI
MH
HOSE BIB, SEE MEP DWGS
PROPOSED FIRE HYDRANT,
SEE CIVIL DWGS
CB
<+YARD HYDRANT, SEE
IRRIGATION SPECS
LOG PATH
PROPOSED SHRUB PLANTING
NS2QPh
NOTE:
1.SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.SEE L-400 FOR PLANTING SCHEDULE
NOTES:1.ALL PLANTING AREAS TO BE IRRIGATED, SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.2.CONTRACTOR SHALL PROVIDE LANDSCAPE ARCHITECT WITH MIN. 24 HOUR ADVANCE NOTICE OF PLANT INSTALLATION.3.ALL PLANTS SHALL BE PLANTED AT THE TIME OF DELIVERY DUE TO LIMITED STORAGE ON SITE. PLANTS IN THE SAME PLANTING BED SHALL BE PLANTED ATTHE SAME TIME. ANY PLANTS REMAINING UNPLANTED ON THE SITE FOR MORE THAN 24 HOURS SHALL BE PROTECTED AND MAINTAINED INCLUDING BUT NOTLIMITED TO PROVIDING WATER AND SHADE. ANY PLANTS THAT DIE OR ARE DAMAGED DUE TO ON-SITE STORAGE SHALL BE REPLACED AT THE CONTRACTOR'SEXPENSE.4.THERE WILL BE NO SUBSTITUTIONS OF PLANT MATERIAL WITHOUT PRIOR WRITTEN APPROVAL BY THE LANDSCAPE ARCHITECT.5.MATERIAL WILL BE INSPECTED AND APPROVED AT PLACE OF GROWTH BY THE LANDSCAPE ARCHITECT. HOWEVER, PLANT MATERIAL WHICH HAS BECOMEDAMAGED OR DISEASED OR WHICH IS UNACCEPTABLE TO THE LANDSCAPE ARCHITECT MAY BE REJECTED UPON DELIVERY TO THE SITE.6.SHOULD THERE BE ANY DISCREPANCIES BETWEEN THE QUANTITIES CALLED FOR ON THE PLANT LIST AND THOSE INDICATED ON THE PLAN, NOTIFYLANDSCAPE ARCHITECT FOR CLARIFICATION.7.AT ALL TIMES, THE SITE SHALL BE KEPT NEAT AND FREE OF DEBRIS LEFT FROM THE PLANTING OPERATION.8.ALL PLANT MATERIAL SHALL BE KEPT VIGOROUS, AND FREE OF ANY INJURY AND DEFECTS. ALL PLANT MATERIAL SHALL BE A TRUE REPRESENTATION OFTHEIR SPECIES.9.PLANT GROUPINGS AND LOCATIONS ARE DIAGRAMMATIC. THE LOCATION OF PLANTS SHALL BE APPROVED IN THE FIELD BY THE LANDSCAPE ARCHITECTPRIOR TO INSTALLATION. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO MAKE ADJUSTMENTS TO ANY AND ALL PLANTING LAYOUT IN THE FIELD AT NOADDITIONAL COST TO THE OWNER.10.ALL PLANT TAGS MUST REMAIN ON THE PLANT MATERIAL UNTIL THE LANDSCAPE ARCHITECT REVIEWS THE LAYOUT AND APPROVES THE QUANTITIES.11.PLANTING BEDS SHALL RECEIVE A 2" THICK LAYER OF MULCH, INDICATED ON THE PLANTING DETAILS.12.SEE SHEET L-400 FOR PLANT SCHEDULE.13.SEE L-820 FOR PLANTING DETAILS.14.SEE L-830 FOR SOIL DETAILS.14.SEE L-310 & L-311 FOR SOILS PLAN.8
8
8
FH
HB
HB
<+
<+
<+
<+
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
FUTURE
SCULPTURE
LOCATION
20'42'19'40'-11"20'-1"
TD1
TD1
TD1
TD1
TD1
TD2
TD1
TD1
TD1
TD2
NS1
TD1
NS1
TD2
TD2
TD2
NS2
TD2
NS2
NS2
NS2
TD2
NS2
TD2
NS2
TD2
TD2
TD2
TD2
TD2
NS2
NS2
NS2
NS2
NS2
NS2
TD2
TD2TD2
TD2
NS2
TD2
NS1 TD2
NS2
TD2
NS2
NS2
TD2
TD2
TD3
NS3
TD2
TD3
TD3
TD2
TD3
TD2
TD2
NS3
QB2
NS1 NS1
NS1NS1
NS1 NS1
TC TC
TC TC
TC TC TC
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
MV MV MV MV MV MV MV
MVMV
QPh2
QPh2
MV
MV
QPh1
QPh1
QPh1
NS1
NOTE:
1.SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.SEE L-400 FOR PLANTING SCHEDULE
LEGEND
LIMIT OF WORK LINE
SHRUB AND GROUNDCOVER,
SEE L420 & L421
PROPOSED TREE PLANTING
EXISTING TREE
DI
FH
HB
STONE FLAG
BUILDING ENTRANCE
MH
EXISTING UTILITY STRUCTURES,
SEE CIVIL DWGS
PROPOSED UTILITY STRUCTURES,
SEE CIVIL DWGS
DI
MH
HOSE BIB, SEE MEP DWGS
PROPOSED FIRE HYDRANT,
SEE CIVIL DWGS
CB
<+YARD HYDRANT, SEE
IRRIGATION SPECS
LOG PATH
PROPOSED SHRUB PLANTING
NS2QPh
0 8'16'32'
SCALE: 1/16" = 1'-0"
NOTES:
1.ALL PLANTING AREAS TO BE IRRIGATED, SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.CONTRACTOR SHALL PROVIDE LANDSCAPE ARCHITECT WITH MIN. 24 HOUR ADVANCE NOTICE OF PLANT INSTALLATION.
3.ALL PLANTS SHALL BE PLANTED AT THE TIME OF DELIVERY DUE TO LIMITED STORAGE ON SITE. PLANTS IN THE SAME PLANTING BED SHALL BE PLANTED AT
THE SAME TIME. ANY PLANTS REMAINING UNPLANTED ON THE SITE FOR MORE THAN 24 HOURS SHALL BE PROTECTED AND MAINTAINED INCLUDING BUT NOT
LIMITED TO PROVIDING WATER AND SHADE. ANY PLANTS THAT DIE OR ARE DAMAGED DUE TO ON-SITE STORAGE SHALL BE REPLACED AT THE CONTRACTOR'S
EXPENSE.
4.THERE WILL BE NO SUBSTITUTIONS OF PLANT MATERIAL WITHOUT PRIOR WRITTEN APPROVAL BY THE LANDSCAPE ARCHITECT.
5.MATERIAL WILL BE INSPECTED AND APPROVED AT PLACE OF GROWTH BY THE LANDSCAPE ARCHITECT. HOWEVER, PLANT MATERIAL WHICH HAS BECOME
DAMAGED OR DISEASED OR WHICH IS UNACCEPTABLE TO THE LANDSCAPE ARCHITECT MAY BE REJECTED UPON DELIVERY TO THE SITE.
6.SHOULD THERE BE ANY DISCREPANCIES BETWEEN THE QUANTITIES CALLED FOR ON THE PLANT LIST AND THOSE INDICATED ON THE PLAN, NOTIFY
LANDSCAPE ARCHITECT FOR CLARIFICATION.
7.AT ALL TIMES, THE SITE SHALL BE KEPT NEAT AND FREE OF DEBRIS LEFT FROM THE PLANTING OPERATION.
8.ALL PLANT MATERIAL SHALL BE KEPT VIGOROUS, AND FREE OF ANY INJURY AND DEFECTS. ALL PLANT MATERIAL SHALL BE A TRUE REPRESENTATION OF
THEIR SPECIES.
9.PLANT GROUPINGS AND LOCATIONS ARE DIAGRAMMATIC. THE LOCATION OF PLANTS SHALL BE APPROVED IN THE FIELD BY THE LANDSCAPE ARCHITECT
PRIOR TO INSTALLATION. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO MAKE ADJUSTMENTS TO ANY AND ALL PLANTING LAYOUT IN THE FIELD AT NO
ADDITIONAL COST TO THE OWNER.
10.ALL PLANT TAGS MUST REMAIN ON THE PLANT MATERIAL UNTIL THE LANDSCAPE ARCHITECT REVIEWS THE LAYOUT AND APPROVES THE QUANTITIES.
11.PLANTING BEDS SHALL RECEIVE A 2" THICK LAYER OF MULCH, INDICATED ON THE PLANTING DETAILS.
12.SEE SHEET L-400 FOR PLANT SCHEDULE.
13.SEE L-820 FOR PLANTING DETAILS.
14.SEE L-830 FOR SOIL DETAILS.
15.SEE L-310 & L-311 FOR SOILS PLAN.
7 TTTT TTTTTT HISTORIC EASEMENTGASFH FHCBWATERMAINHBHBHB HB<+<+DI DIDI DI MHMHMHMHMHMHMH<+FUTURESCULPTURELOCATION HBMHDIELECTRICTRANSFORMER20' TYP.20'-0" TYP.8'-8"11'-4"CL10'-2"9'-11"19'18'QPQP QPQPQPQPh1QB2QM2QM2QM2QM2QB2QPh1QPh1QMa1QMa1QMa1TCQM1QM1QM1QMa1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1TCMVMV MVNS1QB1QB1MVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMV MV MVQM2QPh1QMa1 LEGENDLIMIT OF WORK LINESHRUB AND GROUNDCOVER,SEE L420 & L421PROPOSED TREE PLANTINGEXISTING TREEDIFHHBSTONE FLAGBUILDING ENTRANCEMHEXISTING UTILITY STRUCTURES,SEE CIVIL DWGSPROPOSED UTILITY STRUCTURES,SEE CIVIL DWGSDIMHHOSE BIB, SEE MEP DWGSPROPOSED FIRE HYDRANT,SEE CIVIL DWGSCB<+YARD HYDRANT, SEEIRRIGATION SPECSLOG PATHPROPOSED SHRUB PLANTINGNS2QPhNOTE:1.SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.2.SEE L-400 FOR PLANTING SCHEDULENOTES:1.ALL PLANTING AREAS TO BE IRRIGATED, SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.2.CONTRACTOR SHALL PROVIDE LANDSCAPE ARCHITECT WITH MIN. 24 HOUR ADVANCE NOTICE OF PLANT INSTALLATION.3.ALL PLANTS SHALL BE PLANTED AT THE TIME OF DELIVERY DUE TO LIMITED STORAGE ON SITE. PLANTS IN THE SAME PLANTING BED SHALL BE PLANTED ATTHE SAME TIME. ANY PLANTS REMAINING UNPLANTED ON THE SITE FOR MORE THAN 24 HOURS SHALL BE PROTECTED AND MAINTAINED INCLUDING BUT NOTLIMITED TO PROVIDING WATER AND SHADE. ANY PLANTS THAT DIE OR ARE DAMAGED DUE TO ON-SITE STORAGE SHALL BE REPLACED AT THE CONTRACTOR'SEXPENSE.4.THERE WILL BE NO SUBSTITUTIONS OF PLANT MATERIAL WITHOUT PRIOR WRITTEN APPROVAL BY THE LANDSCAPE ARCHITECT.5.MATERIAL WILL BE INSPECTED AND APPROVED AT PLACE OF GROWTH BY THE LANDSCAPE ARCHITECT. HOWEVER, PLANT MATERIAL WHICH HAS BECOMEDAMAGED OR DISEASED OR WHICH IS UNACCEPTABLE TO THE LANDSCAPE ARCHITECT MAY BE REJECTED UPON DELIVERY TO THE SITE.6.SHOULD THERE BE ANY DISCREPANCIES BETWEEN THE QUANTITIES CALLED FOR ON THE PLANT LIST AND THOSE INDICATED ON THE PLAN, NOTIFYLANDSCAPE ARCHITECT FOR CLARIFICATION.7.AT ALL TIMES, THE SITE SHALL BE KEPT NEAT AND FREE OF DEBRIS LEFT FROM THE PLANTING OPERATION.8.ALL PLANT MATERIAL SHALL BE KEPT VIGOROUS, AND FREE OF ANY INJURY AND DEFECTS. ALL PLANT MATERIAL SHALL BE A TRUE REPRESENTATION OFTHEIR SPECIES.9.PLANT GROUPINGS AND LOCATIONS ARE DIAGRAMMATIC. THE LOCATION OF PLANTS SHALL BE APPROVED IN THE FIELD BY THE LANDSCAPE ARCHITECTPRIOR TO INSTALLATION. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO MAKE ADJUSTMENTS TO ANY AND ALL PLANTING LAYOUT IN THE FIELD AT NOADDITIONAL COST TO THE OWNER.10.ALL PLANT TAGS MUST REMAIN ON THE PLANT MATERIAL UNTIL THE LANDSCAPE ARCHITECT REVIEWS THE LAYOUT AND APPROVES THE QUANTITIES.11.PLANTING BEDS SHALL RECEIVE A 2" THICK LAYER OF MULCH, INDICATED ON THE PLANTING DETAILS.12.SEE SHEET L-400 FOR PLANT SCHEDULE.13.SEE L-820 FOR PLANTING DETAILS.14.SEE L-830 FOR SOIL DETAILS.14.SEE L-310 & L-311 FOR SOILS PLAN.8 8 8FHHBHB<+<+<+<+DI DIDIDIDIDI
DI
DI
DI DI MH
MH
MH MH MHMHMHMH
MH
MHFUTURESCULPTURELOCATION20'42'19'40'-11"20'-1"TD1 TD1TD1TD1 TD1TD2TD1TD1TD1TD2NS1TD1NS1TD2TD2TD2NS2TD2NS2NS2NS2 TD2NS2TD2NS2TD2TD2TD2TD2TD2NS2NS2 NS2NS2NS2NS2TD2TD2TD2 TD2NS2TD2NS1TD2NS2TD2NS2NS2TD2TD2TD3NS3TD2TD3TD3TD2TD3TD2TD2NS3QB2NS1NS1NS1NS1NS1NS1TCTCTCTCTCTCTCNS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1
TCTCTCTCTCTCTCTCTC
TC
TC
TC
TC
TC
TC
TC
TCTCTCTCTCTCTCTC
TC
TC
TC
TC
TC
TC
TC
TC
TC
MV MV MV MV MV MV MVMVMVQPh2QPh2MVMV QPh1QPh1QPh1NS1
NOTE:
1.SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.SEE L-400 FOR PLANTING SCHEDULE
LEGEND
LIMIT OF WORK LINE
SHRUB AND GROUNDCOVER,
SEE L420 & L421
PROPOSED TREE PLANTING
EXISTING TREE
DI
FH
HB
STONE FLAG
BUILDING ENTRANCE
MH
EXISTING UTILITY STRUCTURES,
SEE CIVIL DWGS
PROPOSED UTILITY STRUCTURES,
SEE CIVIL DWGS
DI
MH
HOSE BIB, SEE MEP DWGS
PROPOSED FIRE HYDRANT,
SEE CIVIL DWGS
CB
<+YARD HYDRANT, SEE
IRRIGATION SPECS
LOG PATH
PROPOSED SHRUB PLANTING
NS2QPh
0 8'16'32'
SCALE: 1/16" = 1'-0"
NOTES:
1.ALL PLANTING AREAS TO BE IRRIGATED, SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.CONTRACTOR SHALL PROVIDE LANDSCAPE ARCHITECT WITH MIN. 24 HOUR ADVANCE NOTICE OF PLANT INSTALLATION.
3.ALL PLANTS SHALL BE PLANTED AT THE TIME OF DELIVERY DUE TO LIMITED STORAGE ON SITE. PLANTS IN THE SAME PLANTING BED SHALL BE PLANTED AT
THE SAME TIME. ANY PLANTS REMAINING UNPLANTED ON THE SITE FOR MORE THAN 24 HOURS SHALL BE PROTECTED AND MAINTAINED INCLUDING BUT NOT
LIMITED TO PROVIDING WATER AND SHADE. ANY PLANTS THAT DIE OR ARE DAMAGED DUE TO ON-SITE STORAGE SHALL BE REPLACED AT THE CONTRACTOR'S
EXPENSE.
4.THERE WILL BE NO SUBSTITUTIONS OF PLANT MATERIAL WITHOUT PRIOR WRITTEN APPROVAL BY THE LANDSCAPE ARCHITECT.
5.MATERIAL WILL BE INSPECTED AND APPROVED AT PLACE OF GROWTH BY THE LANDSCAPE ARCHITECT. HOWEVER, PLANT MATERIAL WHICH HAS BECOME
DAMAGED OR DISEASED OR WHICH IS UNACCEPTABLE TO THE LANDSCAPE ARCHITECT MAY BE REJECTED UPON DELIVERY TO THE SITE.
6.SHOULD THERE BE ANY DISCREPANCIES BETWEEN THE QUANTITIES CALLED FOR ON THE PLANT LIST AND THOSE INDICATED ON THE PLAN, NOTIFY
LANDSCAPE ARCHITECT FOR CLARIFICATION.
7.AT ALL TIMES, THE SITE SHALL BE KEPT NEAT AND FREE OF DEBRIS LEFT FROM THE PLANTING OPERATION.
8.ALL PLANT MATERIAL SHALL BE KEPT VIGOROUS, AND FREE OF ANY INJURY AND DEFECTS. ALL PLANT MATERIAL SHALL BE A TRUE REPRESENTATION OF
THEIR SPECIES.
9.PLANT GROUPINGS AND LOCATIONS ARE DIAGRAMMATIC. THE LOCATION OF PLANTS SHALL BE APPROVED IN THE FIELD BY THE LANDSCAPE ARCHITECT
PRIOR TO INSTALLATION. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO MAKE ADJUSTMENTS TO ANY AND ALL PLANTING LAYOUT IN THE FIELD AT NO
ADDITIONAL COST TO THE OWNER.
10.ALL PLANT TAGS MUST REMAIN ON THE PLANT MATERIAL UNTIL THE LANDSCAPE ARCHITECT REVIEWS THE LAYOUT AND APPROVES THE QUANTITIES.
11.PLANTING BEDS SHALL RECEIVE A 2" THICK LAYER OF MULCH, INDICATED ON THE PLANTING DETAILS.
12.SEE SHEET L-400 FOR PLANT SCHEDULE.
13.SEE L-820 FOR PLANTING DETAILS.
14.SEE L-830 FOR SOIL DETAILS.
15.SEE L-310 & L-311 FOR SOILS PLAN.
7TTTTTTTTTT HISTORIC EASEMENTGASFH FHCBWATERMAINHBHBHB HB<+<+DI DIDI DI MHMHMHMHMHMHMH<+FUTURESCULPTURELOCATION HBMHDIELECTRICTRANSFORMER20' TYP.20'-0" TYP.8'-8"11'-4"CL10'-2"9'-11"19'18'QPQP QPQPQPQPh1QB2QM2QM2QM2QM2QB2QPh1QPh1QMa1QMa1QMa1TCQM1QM1QM1QMa1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1TCMVMV MVNS1QB1QB1MVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMV MV MVQM2QPh1QMa1 LEGENDLIMIT OF WORK LINESHRUB AND GROUNDCOVER,SEE L420 & L421PROPOSED TREE PLANTINGEXISTING TREEDIFHHBSTONE FLAGBUILDING ENTRANCEMHEXISTING UTILITY STRUCTURES,SEE CIVIL DWGSPROPOSED UTILITY STRUCTURES,SEE CIVIL DWGSDIMHHOSE BIB, SEE MEP DWGSPROPOSED FIRE HYDRANT,SEE CIVIL DWGSCB<+YARD HYDRANT, SEEIRRIGATION SPECSLOG PATHPROPOSED SHRUB PLANTINGNS2QPhNOTE:1.SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.2.SEE L-400 FOR PLANTING SCHEDULENOTES:1.ALL PLANTING AREAS TO BE IRRIGATED, SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.2.CONTRACTOR SHALL PROVIDE LANDSCAPE ARCHITECT WITH MIN. 24 HOUR ADVANCE NOTICE OF PLANT INSTALLATION.3.ALL PLANTS SHALL BE PLANTED AT THE TIME OF DELIVERY DUE TO LIMITED STORAGE ON SITE. PLANTS IN THE SAME PLANTING BED SHALL BE PLANTED ATTHE SAME TIME. ANY PLANTS REMAINING UNPLANTED ON THE SITE FOR MORE THAN 24 HOURS SHALL BE PROTECTED AND MAINTAINED INCLUDING BUT NOTLIMITED TO PROVIDING WATER AND SHADE. ANY PLANTS THAT DIE OR ARE DAMAGED DUE TO ON-SITE STORAGE SHALL BE REPLACED AT THE CONTRACTOR'SEXPENSE.4.THERE WILL BE NO SUBSTITUTIONS OF PLANT MATERIAL WITHOUT PRIOR WRITTEN APPROVAL BY THE LANDSCAPE ARCHITECT.5.MATERIAL WILL BE INSPECTED AND APPROVED AT PLACE OF GROWTH BY THE LANDSCAPE ARCHITECT. HOWEVER, PLANT MATERIAL WHICH HAS BECOMEDAMAGED OR DISEASED OR WHICH IS UNACCEPTABLE TO THE LANDSCAPE ARCHITECT MAY BE REJECTED UPON DELIVERY TO THE SITE.6.SHOULD THERE BE ANY DISCREPANCIES BETWEEN THE QUANTITIES CALLED FOR ON THE PLANT LIST AND THOSE INDICATED ON THE PLAN, NOTIFYLANDSCAPE ARCHITECT FOR CLARIFICATION.7.AT ALL TIMES, THE SITE SHALL BE KEPT NEAT AND FREE OF DEBRIS LEFT FROM THE PLANTING OPERATION.8.ALL PLANT MATERIAL SHALL BE KEPT VIGOROUS, AND FREE OF ANY INJURY AND DEFECTS. ALL PLANT MATERIAL SHALL BE A TRUE REPRESENTATION OFTHEIR SPECIES.9.PLANT GROUPINGS AND LOCATIONS ARE DIAGRAMMATIC. THE LOCATION OF PLANTS SHALL BE APPROVED IN THE FIELD BY THE LANDSCAPE ARCHITECTPRIOR TO INSTALLATION. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO MAKE ADJUSTMENTS TO ANY AND ALL PLANTING LAYOUT IN THE FIELD AT NOADDITIONAL COST TO THE OWNER.10.ALL PLANT TAGS MUST REMAIN ON THE PLANT MATERIAL UNTIL THE LANDSCAPE ARCHITECT REVIEWS THE LAYOUT AND APPROVES THE QUANTITIES.11.PLANTING BEDS SHALL RECEIVE A 2" THICK LAYER OF MULCH, INDICATED ON THE PLANTING DETAILS.12.SEE SHEET L-400 FOR PLANT SCHEDULE.13.SEE L-820 FOR PLANTING DETAILS.14.SEE L-830 FOR SOIL DETAILS.14.SEE L-310 & L-311 FOR SOILS PLAN.8 8 8FHHBHB
<+
<+
<+
<+
DI
DIDIDI
DI
DI
DI
DI
DI DI MH
MH
MH
MH
MH
MHMH
MH
MH
MH
FUTURESCULPTURELOCATION20'42'19'40'-11"20'-1"TD1 TD1TD1
TD1
TD1
TD2
TD1
TD1
TD1
TD2
NS1
TD1
NS1
TD2
TD2
TD2
NS2
TD2
NS2
NS2
NS2
TD2
NS2
TD2
NS2TD2 TD2TD2TD2TD2NS2NS2 NS2
NS2
NS2
NS2 TD2 TD2TD2 TD2
NS2
TD2
NS1 TD2
NS2
TD2NS2 NS2
TD2
TD2
TD3
NS3TD2TD3 TD3TD2
TD3
TD2TD2
NS3
QB2NS1NS1NS1NS1NS1NS1TCTCTCTCTCTCTCNS1NS1NS1NS1NS1NS1NS1NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1
TCTC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
MV MV MV MV MV MV MVMVMVQPh2
QPh2
MVMV QPh1QPh1QPh1NS1
NOTE:
1.SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.SEE L-400 FOR PLANTING SCHEDULE
LEGEND
LIMIT OF WORK LINE
SHRUB AND GROUNDCOVER,
SEE L420 & L421
PROPOSED TREE PLANTING
EXISTING TREE
DI
FH
HB
STONE FLAG
BUILDING ENTRANCE
MH
EXISTING UTILITY STRUCTURES,
SEE CIVIL DWGS
PROPOSED UTILITY STRUCTURES,
SEE CIVIL DWGS
DI
MH
HOSE BIB, SEE MEP DWGS
PROPOSED FIRE HYDRANT,
SEE CIVIL DWGS
CB
<+YARD HYDRANT, SEE
IRRIGATION SPECS
LOG PATH
PROPOSED SHRUB PLANTING
NS2QPh
0 8'16'32'
SCALE: 1/16" = 1'-0"
NOTES:
1.ALL PLANTING AREAS TO BE IRRIGATED, SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.CONTRACTOR SHALL PROVIDE LANDSCAPE ARCHITECT WITH MIN. 24 HOUR ADVANCE NOTICE OF PLANT INSTALLATION.
3.ALL PLANTS SHALL BE PLANTED AT THE TIME OF DELIVERY DUE TO LIMITED STORAGE ON SITE. PLANTS IN THE SAME PLANTING BED SHALL BE PLANTED AT
THE SAME TIME. ANY PLANTS REMAINING UNPLANTED ON THE SITE FOR MORE THAN 24 HOURS SHALL BE PROTECTED AND MAINTAINED INCLUDING BUT NOT
LIMITED TO PROVIDING WATER AND SHADE. ANY PLANTS THAT DIE OR ARE DAMAGED DUE TO ON-SITE STORAGE SHALL BE REPLACED AT THE CONTRACTOR'S
EXPENSE.
4.THERE WILL BE NO SUBSTITUTIONS OF PLANT MATERIAL WITHOUT PRIOR WRITTEN APPROVAL BY THE LANDSCAPE ARCHITECT.
5.MATERIAL WILL BE INSPECTED AND APPROVED AT PLACE OF GROWTH BY THE LANDSCAPE ARCHITECT. HOWEVER, PLANT MATERIAL WHICH HAS BECOME
DAMAGED OR DISEASED OR WHICH IS UNACCEPTABLE TO THE LANDSCAPE ARCHITECT MAY BE REJECTED UPON DELIVERY TO THE SITE.
6.SHOULD THERE BE ANY DISCREPANCIES BETWEEN THE QUANTITIES CALLED FOR ON THE PLANT LIST AND THOSE INDICATED ON THE PLAN, NOTIFY
LANDSCAPE ARCHITECT FOR CLARIFICATION.
7.AT ALL TIMES, THE SITE SHALL BE KEPT NEAT AND FREE OF DEBRIS LEFT FROM THE PLANTING OPERATION.
8.ALL PLANT MATERIAL SHALL BE KEPT VIGOROUS, AND FREE OF ANY INJURY AND DEFECTS. ALL PLANT MATERIAL SHALL BE A TRUE REPRESENTATION OF
THEIR SPECIES.
9.PLANT GROUPINGS AND LOCATIONS ARE DIAGRAMMATIC. THE LOCATION OF PLANTS SHALL BE APPROVED IN THE FIELD BY THE LANDSCAPE ARCHITECT
PRIOR TO INSTALLATION. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO MAKE ADJUSTMENTS TO ANY AND ALL PLANTING LAYOUT IN THE FIELD AT NO
ADDITIONAL COST TO THE OWNER.
10.ALL PLANT TAGS MUST REMAIN ON THE PLANT MATERIAL UNTIL THE LANDSCAPE ARCHITECT REVIEWS THE LAYOUT AND APPROVES THE QUANTITIES.
11.PLANTING BEDS SHALL RECEIVE A 2" THICK LAYER OF MULCH, INDICATED ON THE PLANTING DETAILS.
12.SEE SHEET L-400 FOR PLANT SCHEDULE.
13.SEE L-820 FOR PLANTING DETAILS.
14.SEE L-830 FOR SOIL DETAILS.
15.SEE L-310 & L-311 FOR SOILS PLAN.
7
TTTT T
T TTT
T HISTORIC EASEMENTGAS
FH
FH
CB
WATER
MAIN
HB
HB
HB
HB
<+<+
DI
DI
DI
DI
MH
MH
MH
MHMH
MH
MH<+FUTURESCULPTURELOCATION
HB
MH
DI
ELECTRIC
TRANSFORMER20' TYP.20'-0" TYP.8'-8"11'-4"CL10'-2"9'-11"19'18'
QPQP QPQPQPQPh1QB2QM2QM2QM2QM2QB2QPh1QPh1QMa1QMa1QMa1
TC
QM1 QM1 QM1QMa1NS1NS1NS1NS1NS1NS1NS1
NS1
NS1 NS1
NS1
NS1NS1 NS1NS1NS1NS1NS1
NS1 NS1 NS1
NS1 NS1
NS1 NS1
NS1 NS1 TC
MV
MV
MV
NS1
QB1
QB1
MV MV MVMVMV
MV
MV MVMVMV
MV
MV
MV
MV
MV
MV
MV
MV
MV
MV
MV
MV
MV
MVMV
MV MV MVMVMV
MV
MV
MV MV MV
QM2 QPh1
QMa1
LEGEND
LIMIT OF WORK LINE
SHRUB AND GROUNDCOVER,
SEE L420 & L421
PROPOSED TREE PLANTING
EXISTING TREE
DI
FH
HB
STONE FLAG
BUILDING ENTRANCE
MH
EXISTING UTILITY STRUCTURES,
SEE CIVIL DWGS
PROPOSED UTILITY STRUCTURES,
SEE CIVIL DWGS
DI
MH
HOSE BIB, SEE MEP DWGS
PROPOSED FIRE HYDRANT,
SEE CIVIL DWGS
CB
<+YARD HYDRANT, SEE
IRRIGATION SPECS
LOG PATH
PROPOSED SHRUB PLANTING
NS2QPh
NOTE:
1.SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.SEE L-400 FOR PLANTING SCHEDULE
NOTES:1.ALL PLANTING AREAS TO BE IRRIGATED, SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.2.CONTRACTOR SHALL PROVIDE LANDSCAPE ARCHITECT WITH MIN. 24 HOUR ADVANCE NOTICE OF PLANT INSTALLATION.3.ALL PLANTS SHALL BE PLANTED AT THE TIME OF DELIVERY DUE TO LIMITED STORAGE ON SITE. PLANTS IN THE SAME PLANTING BED SHALL BE PLANTED ATTHE SAME TIME. ANY PLANTS REMAINING UNPLANTED ON THE SITE FOR MORE THAN 24 HOURS SHALL BE PROTECTED AND MAINTAINED INCLUDING BUT NOTLIMITED TO PROVIDING WATER AND SHADE. ANY PLANTS THAT DIE OR ARE DAMAGED DUE TO ON-SITE STORAGE SHALL BE REPLACED AT THE CONTRACTOR'SEXPENSE.4.THERE WILL BE NO SUBSTITUTIONS OF PLANT MATERIAL WITHOUT PRIOR WRITTEN APPROVAL BY THE LANDSCAPE ARCHITECT.5.MATERIAL WILL BE INSPECTED AND APPROVED AT PLACE OF GROWTH BY THE LANDSCAPE ARCHITECT. HOWEVER, PLANT MATERIAL WHICH HAS BECOMEDAMAGED OR DISEASED OR WHICH IS UNACCEPTABLE TO THE LANDSCAPE ARCHITECT MAY BE REJECTED UPON DELIVERY TO THE SITE.6.SHOULD THERE BE ANY DISCREPANCIES BETWEEN THE QUANTITIES CALLED FOR ON THE PLANT LIST AND THOSE INDICATED ON THE PLAN, NOTIFYLANDSCAPE ARCHITECT FOR CLARIFICATION.7.AT ALL TIMES, THE SITE SHALL BE KEPT NEAT AND FREE OF DEBRIS LEFT FROM THE PLANTING OPERATION.8.ALL PLANT MATERIAL SHALL BE KEPT VIGOROUS, AND FREE OF ANY INJURY AND DEFECTS. ALL PLANT MATERIAL SHALL BE A TRUE REPRESENTATION OFTHEIR SPECIES.9.PLANT GROUPINGS AND LOCATIONS ARE DIAGRAMMATIC. THE LOCATION OF PLANTS SHALL BE APPROVED IN THE FIELD BY THE LANDSCAPE ARCHITECTPRIOR TO INSTALLATION. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO MAKE ADJUSTMENTS TO ANY AND ALL PLANTING LAYOUT IN THE FIELD AT NOADDITIONAL COST TO THE OWNER.10.ALL PLANT TAGS MUST REMAIN ON THE PLANT MATERIAL UNTIL THE LANDSCAPE ARCHITECT REVIEWS THE LAYOUT AND APPROVES THE QUANTITIES.11.PLANTING BEDS SHALL RECEIVE A 2" THICK LAYER OF MULCH, INDICATED ON THE PLANTING DETAILS.12.SEE SHEET L-400 FOR PLANT SCHEDULE.13.SEE L-820 FOR PLANTING DETAILS.14.SEE L-830 FOR SOIL DETAILS.14.SEE L-310 & L-311 FOR SOILS PLAN.
8
8
8
FH
HB
HB
<+
<+
<+
<+
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
FUTURE
SCULPTURE
LOCATION
20'42'19'40'-11"20'-1"
TD1
TD1
TD1
TD1
TD1
TD2
TD1
TD1
TD1
TD2
NS1
TD1
NS1
TD2
TD2
TD2
NS2
TD2
NS2
NS2
NS2
TD2
NS2
TD2
NS2
TD2
TD2
TD2
TD2
TD2
NS2NS2
NS2
NS2
NS2
NS2
TD2
TD2TD2
TD2
NS2
TD2
NS1 TD2
NS2
TD2
NS2
NS2
TD2
TD2
TD3
NS3
TD2
TD3
TD3
TD2
TD3
TD2
TD2
NS3
QB2
NS1 NS1
NS1NS1
NS1 NS1
TC TC
TC TC
TC TC TC
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
MV MV MV MV MV MV MV
MVMV
QPh2
QPh2
MV
MV
QPh1
QPh1
QPh1
NS1
NOTE:
1.SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.SEE L-400 FOR PLANTING SCHEDULE
LEGEND
LIMIT OF WORK LINE
SHRUB AND GROUNDCOVER,
SEE L420 & L421
PROPOSED TREE PLANTING
EXISTING TREE
DI
FH
HB
STONE FLAG
BUILDING ENTRANCE
MH
EXISTING UTILITY STRUCTURES,
SEE CIVIL DWGS
PROPOSED UTILITY STRUCTURES,
SEE CIVIL DWGS
DI
MH
HOSE BIB, SEE MEP DWGS
PROPOSED FIRE HYDRANT,
SEE CIVIL DWGS
CB
<+YARD HYDRANT, SEE
IRRIGATION SPECS
LOG PATH
PROPOSED SHRUB PLANTING
NS2QPh
0 8'16'32'
SCALE: 1/16" = 1'-0"
NOTES:
1.ALL PLANTING AREAS TO BE IRRIGATED, SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.CONTRACTOR SHALL PROVIDE LANDSCAPE ARCHITECT WITH MIN. 24 HOUR ADVANCE NOTICE OF PLANT INSTALLATION.
3.ALL PLANTS SHALL BE PLANTED AT THE TIME OF DELIVERY DUE TO LIMITED STORAGE ON SITE. PLANTS IN THE SAME PLANTING BED SHALL BE PLANTED AT
THE SAME TIME. ANY PLANTS REMAINING UNPLANTED ON THE SITE FOR MORE THAN 24 HOURS SHALL BE PROTECTED AND MAINTAINED INCLUDING BUT NOT
LIMITED TO PROVIDING WATER AND SHADE. ANY PLANTS THAT DIE OR ARE DAMAGED DUE TO ON-SITE STORAGE SHALL BE REPLACED AT THE CONTRACTOR'S
EXPENSE.
4.THERE WILL BE NO SUBSTITUTIONS OF PLANT MATERIAL WITHOUT PRIOR WRITTEN APPROVAL BY THE LANDSCAPE ARCHITECT.
5.MATERIAL WILL BE INSPECTED AND APPROVED AT PLACE OF GROWTH BY THE LANDSCAPE ARCHITECT. HOWEVER, PLANT MATERIAL WHICH HAS BECOME
DAMAGED OR DISEASED OR WHICH IS UNACCEPTABLE TO THE LANDSCAPE ARCHITECT MAY BE REJECTED UPON DELIVERY TO THE SITE.
6.SHOULD THERE BE ANY DISCREPANCIES BETWEEN THE QUANTITIES CALLED FOR ON THE PLANT LIST AND THOSE INDICATED ON THE PLAN, NOTIFY
LANDSCAPE ARCHITECT FOR CLARIFICATION.
7.AT ALL TIMES, THE SITE SHALL BE KEPT NEAT AND FREE OF DEBRIS LEFT FROM THE PLANTING OPERATION.
8.ALL PLANT MATERIAL SHALL BE KEPT VIGOROUS, AND FREE OF ANY INJURY AND DEFECTS. ALL PLANT MATERIAL SHALL BE A TRUE REPRESENTATION OF
THEIR SPECIES.
9.PLANT GROUPINGS AND LOCATIONS ARE DIAGRAMMATIC. THE LOCATION OF PLANTS SHALL BE APPROVED IN THE FIELD BY THE LANDSCAPE ARCHITECT
PRIOR TO INSTALLATION. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO MAKE ADJUSTMENTS TO ANY AND ALL PLANTING LAYOUT IN THE FIELD AT NO
ADDITIONAL COST TO THE OWNER.
10.ALL PLANT TAGS MUST REMAIN ON THE PLANT MATERIAL UNTIL THE LANDSCAPE ARCHITECT REVIEWS THE LAYOUT AND APPROVES THE QUANTITIES.
11.PLANTING BEDS SHALL RECEIVE A 2" THICK LAYER OF MULCH, INDICATED ON THE PLANTING DETAILS.
12.SEE SHEET L-400 FOR PLANT SCHEDULE.
13.SEE L-820 FOR PLANTING DETAILS.
14.SEE L-830 FOR SOIL DETAILS.
15.SEE L-310 & L-311 FOR SOILS PLAN.
7TTT
T T
T TTT
T HISTORIC EASEMENTGAS
FH
FH
CB
WATER
MAIN
HB
HB
HB
HB
<+
<+
DI
DI
DI
DI
MH
MH
MH
MH
MH
MH
MH<+
FUTURE
SCULPTURE
LOCATION
HB
MH
DI
ELECTRIC
TRANSFORMER20' TYP.20'-0" TYP.
8'-8"11'-4"CL10'-2"9'-11"19'18'
QP
QP
QP
QPQP
QPh1QB2
QM2
QM2
QM2
QM2
QB2QPh1
QPh1QMa1 QMa1
QMa1
TC
QM1
QM1
QM1
QMa1
NS1 NS1 NS1
NS1
NS1
NS1
NS1
NS1
NS1 NS1
NS1
NS1
NS1
NS1
NS1
NS1
NS1
NS1
NS1 NS1 NS1
NS1 NS1
NS1 NS1
NS1 NS1 TC
MV
MV
MV
NS1
QB1
QB1
MV MV MVMVMV
MV
MV MVMVMV
MV
MV
MV
MV
MV
MV
MV
MV
MV
MV
MV
MV
MV
MVMV
MV MV MVMVMV
MV
MV
MV MV MV
QM2 QPh1
QMa1
LEGEND
LIMIT OF WORK LINE
SHRUB AND GROUNDCOVER,
SEE L420 & L421
PROPOSED TREE PLANTING
EXISTING TREE
DI
FH
HB
STONE FLAG
BUILDING ENTRANCE
MH
EXISTING UTILITY STRUCTURES,
SEE CIVIL DWGS
PROPOSED UTILITY STRUCTURES,
SEE CIVIL DWGS
DI
MH
HOSE BIB, SEE MEP DWGS
PROPOSED FIRE HYDRANT,
SEE CIVIL DWGS
CB
<+YARD HYDRANT, SEE
IRRIGATION SPECS
LOG PATH
PROPOSED SHRUB PLANTING
NS2QPh
NOTE:
1.SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.SEE L-400 FOR PLANTING SCHEDULE
NOTES:1.ALL PLANTING AREAS TO BE IRRIGATED, SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.2.CONTRACTOR SHALL PROVIDE LANDSCAPE ARCHITECT WITH MIN. 24 HOUR ADVANCE NOTICE OF PLANT INSTALLATION.3.ALL PLANTS SHALL BE PLANTED AT THE TIME OF DELIVERY DUE TO LIMITED STORAGE ON SITE. PLANTS IN THE SAME PLANTING BED SHALL BE PLANTED ATTHE SAME TIME. ANY PLANTS REMAINING UNPLANTED ON THE SITE FOR MORE THAN 24 HOURS SHALL BE PROTECTED AND MAINTAINED INCLUDING BUT NOTLIMITED TO PROVIDING WATER AND SHADE. ANY PLANTS THAT DIE OR ARE DAMAGED DUE TO ON-SITE STORAGE SHALL BE REPLACED AT THE CONTRACTOR'SEXPENSE.4.THERE WILL BE NO SUBSTITUTIONS OF PLANT MATERIAL WITHOUT PRIOR WRITTEN APPROVAL BY THE LANDSCAPE ARCHITECT.5.MATERIAL WILL BE INSPECTED AND APPROVED AT PLACE OF GROWTH BY THE LANDSCAPE ARCHITECT. HOWEVER, PLANT MATERIAL WHICH HAS BECOMEDAMAGED OR DISEASED OR WHICH IS UNACCEPTABLE TO THE LANDSCAPE ARCHITECT MAY BE REJECTED UPON DELIVERY TO THE SITE.6.SHOULD THERE BE ANY DISCREPANCIES BETWEEN THE QUANTITIES CALLED FOR ON THE PLANT LIST AND THOSE INDICATED ON THE PLAN, NOTIFYLANDSCAPE ARCHITECT FOR CLARIFICATION.7.AT ALL TIMES, THE SITE SHALL BE KEPT NEAT AND FREE OF DEBRIS LEFT FROM THE PLANTING OPERATION.8.ALL PLANT MATERIAL SHALL BE KEPT VIGOROUS, AND FREE OF ANY INJURY AND DEFECTS. ALL PLANT MATERIAL SHALL BE A TRUE REPRESENTATION OFTHEIR SPECIES.9.PLANT GROUPINGS AND LOCATIONS ARE DIAGRAMMATIC. THE LOCATION OF PLANTS SHALL BE APPROVED IN THE FIELD BY THE LANDSCAPE ARCHITECTPRIOR TO INSTALLATION. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO MAKE ADJUSTMENTS TO ANY AND ALL PLANTING LAYOUT IN THE FIELD AT NOADDITIONAL COST TO THE OWNER.10.ALL PLANT TAGS MUST REMAIN ON THE PLANT MATERIAL UNTIL THE LANDSCAPE ARCHITECT REVIEWS THE LAYOUT AND APPROVES THE QUANTITIES.11.PLANTING BEDS SHALL RECEIVE A 2" THICK LAYER OF MULCH, INDICATED ON THE PLANTING DETAILS.12.SEE SHEET L-400 FOR PLANT SCHEDULE.13.SEE L-820 FOR PLANTING DETAILS.14.SEE L-830 FOR SOIL DETAILS.14.SEE L-310 & L-311 FOR SOILS PLAN.
8
8
8
FH
HB
HB
<+
<+
<+
<+
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
FUTURE
SCULPTURE
LOCATION
20'42'19'40'-11"20'-1"
TD1
TD1
TD1
TD1
TD1
TD2
TD1
TD1
TD1
TD2
NS1
TD1
NS1
TD2
TD2
TD2
NS2
TD2
NS2
NS2
NS2
TD2
NS2
TD2
NS2
TD2
TD2
TD2
TD2
TD2
NS2NS2
NS2
NS2
NS2
NS2
TD2
TD2TD2
TD2
NS2
TD2
NS1 TD2
NS2
TD2
NS2
NS2
TD2
TD2
TD3
NS3
TD2
TD3
TD3
TD2
TD3
TD2
TD2
NS3
QB2
NS1 NS1
NS1NS1
NS1 NS1
TC TC
TC TC
TC TC TC
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
MV MV MV MV MV MV MV
MVMV
QPh2
QPh2
MV
MV
QPh1
QPh1
QPh1
NS1
NOTE:
1.SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.SEE L-400 FOR PLANTING SCHEDULE
LEGEND
LIMIT OF WORK LINE
SHRUB AND GROUNDCOVER,
SEE L420 & L421
PROPOSED TREE PLANTING
EXISTING TREE
DI
FH
HB
STONE FLAG
BUILDING ENTRANCE
MH
EXISTING UTILITY STRUCTURES,
SEE CIVIL DWGS
PROPOSED UTILITY STRUCTURES,
SEE CIVIL DWGS
DI
MH
HOSE BIB, SEE MEP DWGS
PROPOSED FIRE HYDRANT,
SEE CIVIL DWGS
CB
<+YARD HYDRANT, SEE
IRRIGATION SPECS
LOG PATH
PROPOSED SHRUB PLANTING
NS2QPh
0 8'16'32'
SCALE: 1/16" = 1'-0"
NOTES:
1.ALL PLANTING AREAS TO BE IRRIGATED, SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.CONTRACTOR SHALL PROVIDE LANDSCAPE ARCHITECT WITH MIN. 24 HOUR ADVANCE NOTICE OF PLANT INSTALLATION.
3.ALL PLANTS SHALL BE PLANTED AT THE TIME OF DELIVERY DUE TO LIMITED STORAGE ON SITE. PLANTS IN THE SAME PLANTING BED SHALL BE PLANTED AT
THE SAME TIME. ANY PLANTS REMAINING UNPLANTED ON THE SITE FOR MORE THAN 24 HOURS SHALL BE PROTECTED AND MAINTAINED INCLUDING BUT NOT
LIMITED TO PROVIDING WATER AND SHADE. ANY PLANTS THAT DIE OR ARE DAMAGED DUE TO ON-SITE STORAGE SHALL BE REPLACED AT THE CONTRACTOR'S
EXPENSE.
4.THERE WILL BE NO SUBSTITUTIONS OF PLANT MATERIAL WITHOUT PRIOR WRITTEN APPROVAL BY THE LANDSCAPE ARCHITECT.
5.MATERIAL WILL BE INSPECTED AND APPROVED AT PLACE OF GROWTH BY THE LANDSCAPE ARCHITECT. HOWEVER, PLANT MATERIAL WHICH HAS BECOME
DAMAGED OR DISEASED OR WHICH IS UNACCEPTABLE TO THE LANDSCAPE ARCHITECT MAY BE REJECTED UPON DELIVERY TO THE SITE.
6.SHOULD THERE BE ANY DISCREPANCIES BETWEEN THE QUANTITIES CALLED FOR ON THE PLANT LIST AND THOSE INDICATED ON THE PLAN, NOTIFY
LANDSCAPE ARCHITECT FOR CLARIFICATION.
7.AT ALL TIMES, THE SITE SHALL BE KEPT NEAT AND FREE OF DEBRIS LEFT FROM THE PLANTING OPERATION.
8.ALL PLANT MATERIAL SHALL BE KEPT VIGOROUS, AND FREE OF ANY INJURY AND DEFECTS. ALL PLANT MATERIAL SHALL BE A TRUE REPRESENTATION OF
THEIR SPECIES.
9.PLANT GROUPINGS AND LOCATIONS ARE DIAGRAMMATIC. THE LOCATION OF PLANTS SHALL BE APPROVED IN THE FIELD BY THE LANDSCAPE ARCHITECT
PRIOR TO INSTALLATION. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO MAKE ADJUSTMENTS TO ANY AND ALL PLANTING LAYOUT IN THE FIELD AT NO
ADDITIONAL COST TO THE OWNER.
10.ALL PLANT TAGS MUST REMAIN ON THE PLANT MATERIAL UNTIL THE LANDSCAPE ARCHITECT REVIEWS THE LAYOUT AND APPROVES THE QUANTITIES.
11.PLANTING BEDS SHALL RECEIVE A 2" THICK LAYER OF MULCH, INDICATED ON THE PLANTING DETAILS.
12.SEE SHEET L-400 FOR PLANT SCHEDULE.
13.SEE L-820 FOR PLANTING DETAILS.
14.SEE L-830 FOR SOIL DETAILS.
15.SEE L-310 & L-311 FOR SOILS PLAN.
7
DRAFT
ELEVATION , SIZES, AND DETAILS SHOWN ON SHEETS 14, 19-22
ELEVATION , FONT SIZE, AND DETAILS SHOWN ON SHEET 24 ELEVATION , SIZE, AND DETAILS SHOWN ON SHEET 8&25 FOR SIGN TYPE 120
ELEVATION , SIZE, AND DETAILS SHOWN ON SHEET 15 &22 ELEVATION , SIZE, AND DETAILS SHOWN ON SHEET 23
ELEVATION , SIZE, AND DETAILS SHOWN ON SHEET 16 & 25
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
12
PROJECT DESIGNERS
Page Southerland Page, Inc
Sign Type 120 - Waynding Directional – Location 068 Sign Type 120 - Waynding Directional – Location 058 Sign Type 120 - Waynding Directional – Location 064
Sign Type 120 - Waynding Directional – Location 072 Sign Type 120 - Waynding Directional – Location 070 Sign Type 120 - Waynding Directional – Location 056
Need and location for pedestrian waynding
directional in crescent lawn TBD.
Detailed Sign Locations Series 100TTT
T T
T TTT
T HISTORIC EASEMENTGAS
FH FHCBWATER
MAIN
HBHB
HB
HB
<+<+
DI
DI
DI
DI
MH
MHMHMHMH
MH
MH<+FUTURESCULPTURELOCATION
HB
MHDI
ELECTRIC
TRANSFORMER20' TYP.20'-0" TYP.8'-8"11'-4"CL10'-2"9'-11"19'18'
QPQP QPQPQPQPh1QB2QM2QM2QM2QM2QB2QPh1QPh1QMa1QMa1QMa1
TC
QM1 QM1 QM1QMa1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1
NS1NS1
NS1NS1
NS1NS1TC
MV MV MVNS1QB1QB1MVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMV MV MVQM2QPh1QMa1
LEGEND
LIMIT OF WORK LINE
SHRUB AND GROUNDCOVER,
SEE L420 & L421
PROPOSED TREE PLANTING
EXISTING TREE
DI
FH
HB
STONE FLAG
BUILDING ENTRANCE
MH
EXISTING UTILITY STRUCTURES,
SEE CIVIL DWGS
PROPOSED UTILITY STRUCTURES,
SEE CIVIL DWGS
DI
MH
HOSE BIB, SEE MEP DWGS
PROPOSED FIRE HYDRANT,
SEE CIVIL DWGS
CB
<+YARD HYDRANT, SEE
IRRIGATION SPECS
LOG PATH
PROPOSED SHRUB PLANTING
NS2QPh
NOTE:1.SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.SEE L-400 FOR PLANTING SCHEDULE
NOTES:1.ALL PLANTING AREAS TO BE IRRIGATED, SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.2.CONTRACTOR SHALL PROVIDE LANDSCAPE ARCHITECT WITH MIN. 24 HOUR ADVANCE NOTICE OF PLANT INSTALLATION.3.ALL PLANTS SHALL BE PLANTED AT THE TIME OF DELIVERY DUE TO LIMITED STORAGE ON SITE. PLANTS IN THE SAME PLANTING BED SHALL BE PLANTED ATTHE SAME TIME. ANY PLANTS REMAINING UNPLANTED ON THE SITE FOR MORE THAN 24 HOURS SHALL BE PROTECTED AND MAINTAINED INCLUDING BUT NOTLIMITED TO PROVIDING WATER AND SHADE. ANY PLANTS THAT DIE OR ARE DAMAGED DUE TO ON-SITE STORAGE SHALL BE REPLACED AT THE CONTRACTOR'SEXPENSE.4.THERE WILL BE NO SUBSTITUTIONS OF PLANT MATERIAL WITHOUT PRIOR WRITTEN APPROVAL BY THE LANDSCAPE ARCHITECT.5.MATERIAL WILL BE INSPECTED AND APPROVED AT PLACE OF GROWTH BY THE LANDSCAPE ARCHITECT. HOWEVER, PLANT MATERIAL WHICH HAS BECOMEDAMAGED OR DISEASED OR WHICH IS UNACCEPTABLE TO THE LANDSCAPE ARCHITECT MAY BE REJECTED UPON DELIVERY TO THE SITE.6.SHOULD THERE BE ANY DISCREPANCIES BETWEEN THE QUANTITIES CALLED FOR ON THE PLANT LIST AND THOSE INDICATED ON THE PLAN, NOTIFYLANDSCAPE ARCHITECT FOR CLARIFICATION.7.AT ALL TIMES, THE SITE SHALL BE KEPT NEAT AND FREE OF DEBRIS LEFT FROM THE PLANTING OPERATION.8.ALL PLANT MATERIAL SHALL BE KEPT VIGOROUS, AND FREE OF ANY INJURY AND DEFECTS. ALL PLANT MATERIAL SHALL BE A TRUE REPRESENTATION OFTHEIR SPECIES.9.PLANT GROUPINGS AND LOCATIONS ARE DIAGRAMMATIC. THE LOCATION OF PLANTS SHALL BE APPROVED IN THE FIELD BY THE LANDSCAPE ARCHITECTPRIOR TO INSTALLATION. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO MAKE ADJUSTMENTS TO ANY AND ALL PLANTING LAYOUT IN THE FIELD AT NOADDITIONAL COST TO THE OWNER.10.ALL PLANT TAGS MUST REMAIN ON THE PLANT MATERIAL UNTIL THE LANDSCAPE ARCHITECT REVIEWS THE LAYOUT AND APPROVES THE QUANTITIES.11.PLANTING BEDS SHALL RECEIVE A 2" THICK LAYER OF MULCH, INDICATED ON THE PLANTING DETAILS.12.SEE SHEET L-400 FOR PLANT SCHEDULE.13.SEE L-820 FOR PLANTING DETAILS.14.SEE L-830 FOR SOIL DETAILS.14.SEE L-310 & L-311 FOR SOILS PLAN.8 8 8
FH
HB
HB
<+
<+
<+
<+
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
FUTURE
SCULPTURE
LOCATION
20'42'19'40'-11"20'-1"
TD1
TD1
TD1
TD1
TD1
TD2
TD1
TD1
TD1
TD2
NS1
TD1
NS1
TD2
TD2
TD2
NS2
TD2
NS2
NS2
NS2
TD2
NS2
TD2
NS2
TD2
TD2
TD2
TD2
TD2
NS2
NS2
NS2
NS2
NS2
NS2
TD2
TD2TD2
TD2
NS2
TD2
NS1 TD2
NS2
TD2
NS2
NS2
TD2
TD2
TD3
NS3
TD2
TD3
TD3
TD2
TD3
TD2
TD2
NS3
QB2
NS1NS1
NS1NS1
NS1NS1
TCTC
TCTC
TCTC TC
NS1NS1NS1 NS1
NS1NS1NS1 NS1
NS1NS1NS1 NS1
NS1NS1NS1 NS1
NS1NS1NS1 NS1
NS1NS1NS1 NS1
NS1NS1NS1 NS1
NS1NS1NS1 NS1
NS1NS1NS1 NS1
NS1NS1NS1 NS1
NS1NS1NS1 NS1
NS1NS1NS1 NS1
NS1NS1NS1 NS1
NS1NS1NS1 NS1
NS1NS1NS1
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
MV MV MV MV MV MV MV
MVMV
QPh2
QPh2
MV
MV
QPh1
QPh1
QPh1
NS1
NOTE:
1.SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.SEE L-400 FOR PLANTING SCHEDULE
LEGEND
LIMIT OF WORK LINE
SHRUB AND GROUNDCOVER,
SEE L420 & L421
PROPOSED TREE PLANTING
EXISTING TREE
DI
FH
HB
STONE FLAG
BUILDING ENTRANCE
MH
EXISTING UTILITY STRUCTURES,
SEE CIVIL DWGS
PROPOSED UTILITY STRUCTURES,
SEE CIVIL DWGS
DI
MH
HOSE BIB, SEE MEP DWGS
PROPOSED FIRE HYDRANT,
SEE CIVIL DWGS
CB
<+YARD HYDRANT, SEE
IRRIGATION SPECS
LOG PATH
PROPOSED SHRUB PLANTING
NS2QPh
0 8'16'32'
SCALE: 1/16" = 1'-0"
NOTES:
1.ALL PLANTING AREAS TO BE IRRIGATED, SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.CONTRACTOR SHALL PROVIDE LANDSCAPE ARCHITECT WITH MIN. 24 HOUR ADVANCE NOTICE OF PLANT INSTALLATION.
3.ALL PLANTS SHALL BE PLANTED AT THE TIME OF DELIVERY DUE TO LIMITED STORAGE ON SITE. PLANTS IN THE SAME PLANTING BED SHALL BE PLANTED AT
THE SAME TIME. ANY PLANTS REMAINING UNPLANTED ON THE SITE FOR MORE THAN 24 HOURS SHALL BE PROTECTED AND MAINTAINED INCLUDING BUT NOT
LIMITED TO PROVIDING WATER AND SHADE. ANY PLANTS THAT DIE OR ARE DAMAGED DUE TO ON-SITE STORAGE SHALL BE REPLACED AT THE CONTRACTOR'S
EXPENSE.
4.THERE WILL BE NO SUBSTITUTIONS OF PLANT MATERIAL WITHOUT PRIOR WRITTEN APPROVAL BY THE LANDSCAPE ARCHITECT.
5.MATERIAL WILL BE INSPECTED AND APPROVED AT PLACE OF GROWTH BY THE LANDSCAPE ARCHITECT. HOWEVER, PLANT MATERIAL WHICH HAS BECOME
DAMAGED OR DISEASED OR WHICH IS UNACCEPTABLE TO THE LANDSCAPE ARCHITECT MAY BE REJECTED UPON DELIVERY TO THE SITE.
6.SHOULD THERE BE ANY DISCREPANCIES BETWEEN THE QUANTITIES CALLED FOR ON THE PLANT LIST AND THOSE INDICATED ON THE PLAN, NOTIFY
LANDSCAPE ARCHITECT FOR CLARIFICATION.
7.AT ALL TIMES, THE SITE SHALL BE KEPT NEAT AND FREE OF DEBRIS LEFT FROM THE PLANTING OPERATION.
8.ALL PLANT MATERIAL SHALL BE KEPT VIGOROUS, AND FREE OF ANY INJURY AND DEFECTS. ALL PLANT MATERIAL SHALL BE A TRUE REPRESENTATION OF
THEIR SPECIES.
9.PLANT GROUPINGS AND LOCATIONS ARE DIAGRAMMATIC. THE LOCATION OF PLANTS SHALL BE APPROVED IN THE FIELD BY THE LANDSCAPE ARCHITECT
PRIOR TO INSTALLATION. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO MAKE ADJUSTMENTS TO ANY AND ALL PLANTING LAYOUT IN THE FIELD AT NO
ADDITIONAL COST TO THE OWNER.
10.ALL PLANT TAGS MUST REMAIN ON THE PLANT MATERIAL UNTIL THE LANDSCAPE ARCHITECT REVIEWS THE LAYOUT AND APPROVES THE QUANTITIES.
11.PLANTING BEDS SHALL RECEIVE A 2" THICK LAYER OF MULCH, INDICATED ON THE PLANTING DETAILS.
12.SEE SHEET L-400 FOR PLANT SCHEDULE.
13.SEE L-820 FOR PLANTING DETAILS.
14.SEE L-830 FOR SOIL DETAILS.
15.SEE L-310 & L-311 FOR SOILS PLAN.
7 TTTT T
T TTT
T HISTORIC EASEMENTGAS
FH FHCB
WATER
MAIN
HBHB
HB
HB
<+<+
DI
DI
DI
DI
MH
MHMHMHMH
MH
MH<+FUTURESCULPTURELOCATION
HB
MH DI
ELECTRIC
TRANSFORMER20' TYP.20'-0" TYP.8'-8"11'-4"CL10'-2"9'-11"19'18'
QPQP QPQPQPQPh1QB2QM2QM2QM2QM2QB2QPh1QPh1QMa1QMa1QMa1
TC
QM1 QM1 QM1QMa1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1
NS1 NS1 NS1
NS1 NS1
NS1 NS1
NS1 NS1 TC
MV MV MVNS1QB1QB1MVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMV MV MVQM2QPh1QMa1
LEGEND
LIMIT OF WORK LINE
SHRUB AND GROUNDCOVER,
SEE L420 & L421
PROPOSED TREE PLANTING
EXISTING TREE
DI
FH
HB
STONE FLAG
BUILDING ENTRANCE
MH
EXISTING UTILITY STRUCTURES,
SEE CIVIL DWGS
PROPOSED UTILITY STRUCTURES,
SEE CIVIL DWGS
DI
MH
HOSE BIB, SEE MEP DWGS
PROPOSED FIRE HYDRANT,
SEE CIVIL DWGS
CB
<+YARD HYDRANT, SEE
IRRIGATION SPECS
LOG PATH
PROPOSED SHRUB PLANTING
NS2QPh
NOTE:
1.SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.SEE L-400 FOR PLANTING SCHEDULE
NOTES:1.ALL PLANTING AREAS TO BE IRRIGATED, SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.2.CONTRACTOR SHALL PROVIDE LANDSCAPE ARCHITECT WITH MIN. 24 HOUR ADVANCE NOTICE OF PLANT INSTALLATION.3.ALL PLANTS SHALL BE PLANTED AT THE TIME OF DELIVERY DUE TO LIMITED STORAGE ON SITE. PLANTS IN THE SAME PLANTING BED SHALL BE PLANTED ATTHE SAME TIME. ANY PLANTS REMAINING UNPLANTED ON THE SITE FOR MORE THAN 24 HOURS SHALL BE PROTECTED AND MAINTAINED INCLUDING BUT NOTLIMITED TO PROVIDING WATER AND SHADE. ANY PLANTS THAT DIE OR ARE DAMAGED DUE TO ON-SITE STORAGE SHALL BE REPLACED AT THE CONTRACTOR'SEXPENSE.4.THERE WILL BE NO SUBSTITUTIONS OF PLANT MATERIAL WITHOUT PRIOR WRITTEN APPROVAL BY THE LANDSCAPE ARCHITECT.5.MATERIAL WILL BE INSPECTED AND APPROVED AT PLACE OF GROWTH BY THE LANDSCAPE ARCHITECT. HOWEVER, PLANT MATERIAL WHICH HAS BECOMEDAMAGED OR DISEASED OR WHICH IS UNACCEPTABLE TO THE LANDSCAPE ARCHITECT MAY BE REJECTED UPON DELIVERY TO THE SITE.6.SHOULD THERE BE ANY DISCREPANCIES BETWEEN THE QUANTITIES CALLED FOR ON THE PLANT LIST AND THOSE INDICATED ON THE PLAN, NOTIFYLANDSCAPE ARCHITECT FOR CLARIFICATION.7.AT ALL TIMES, THE SITE SHALL BE KEPT NEAT AND FREE OF DEBRIS LEFT FROM THE PLANTING OPERATION.8.ALL PLANT MATERIAL SHALL BE KEPT VIGOROUS, AND FREE OF ANY INJURY AND DEFECTS. ALL PLANT MATERIAL SHALL BE A TRUE REPRESENTATION OFTHEIR SPECIES.9.PLANT GROUPINGS AND LOCATIONS ARE DIAGRAMMATIC. THE LOCATION OF PLANTS SHALL BE APPROVED IN THE FIELD BY THE LANDSCAPE ARCHITECTPRIOR TO INSTALLATION. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO MAKE ADJUSTMENTS TO ANY AND ALL PLANTING LAYOUT IN THE FIELD AT NOADDITIONAL COST TO THE OWNER.10.ALL PLANT TAGS MUST REMAIN ON THE PLANT MATERIAL UNTIL THE LANDSCAPE ARCHITECT REVIEWS THE LAYOUT AND APPROVES THE QUANTITIES.11.PLANTING BEDS SHALL RECEIVE A 2" THICK LAYER OF MULCH, INDICATED ON THE PLANTING DETAILS.12.SEE SHEET L-400 FOR PLANT SCHEDULE.13.SEE L-820 FOR PLANTING DETAILS.14.SEE L-830 FOR SOIL DETAILS.14.SEE L-310 & L-311 FOR SOILS PLAN.8 8 8
FH
HB
HB
<+
<+
<+
<+
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
FUTURE
SCULPTURE
LOCATION
20'42'19'40'-11"20'-1"
TD1
TD1
TD1
TD1
TD1
TD2
TD1
TD1
TD1
TD2
NS1
TD1
NS1
TD2
TD2
TD2
NS2
TD2
NS2
NS2
NS2
TD2
NS2
TD2
NS2
TD2
TD2
TD2
TD2
TD2
NS2
NS2
NS2
NS2
NS2
NS2
TD2
TD2TD2
TD2
NS2
TD2
NS1 TD2
NS2
TD2
NS2
NS2
TD2
TD2
TD3
NS3
TD2
TD3
TD3
TD2
TD3
TD2
TD2
NS3
QB2
NS1 NS1
NS1NS1
NS1 NS1
TC TC
TC TC
TC TC TC
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
MV MV MV MV MV MV MV
MVMV
QPh2
QPh2
MV
MV
QPh1
QPh1
QPh1
NS1
NOTE:
1.SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.SEE L-400 FOR PLANTING SCHEDULE
LEGEND
LIMIT OF WORK LINE
SHRUB AND GROUNDCOVER,
SEE L420 & L421
PROPOSED TREE PLANTING
EXISTING TREE
DI
FH
HB
STONE FLAG
BUILDING ENTRANCE
MH
EXISTING UTILITY STRUCTURES,
SEE CIVIL DWGS
PROPOSED UTILITY STRUCTURES,
SEE CIVIL DWGS
DI
MH
HOSE BIB, SEE MEP DWGS
PROPOSED FIRE HYDRANT,
SEE CIVIL DWGS
CB
<+YARD HYDRANT, SEE
IRRIGATION SPECS
LOG PATH
PROPOSED SHRUB PLANTING
NS2QPh
0 8'16'32'
SCALE: 1/16" = 1'-0"
NOTES:
1.ALL PLANTING AREAS TO BE IRRIGATED, SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.CONTRACTOR SHALL PROVIDE LANDSCAPE ARCHITECT WITH MIN. 24 HOUR ADVANCE NOTICE OF PLANT INSTALLATION.
3.ALL PLANTS SHALL BE PLANTED AT THE TIME OF DELIVERY DUE TO LIMITED STORAGE ON SITE. PLANTS IN THE SAME PLANTING BED SHALL BE PLANTED AT
THE SAME TIME. ANY PLANTS REMAINING UNPLANTED ON THE SITE FOR MORE THAN 24 HOURS SHALL BE PROTECTED AND MAINTAINED INCLUDING BUT NOT
LIMITED TO PROVIDING WATER AND SHADE. ANY PLANTS THAT DIE OR ARE DAMAGED DUE TO ON-SITE STORAGE SHALL BE REPLACED AT THE CONTRACTOR'S
EXPENSE.
4.THERE WILL BE NO SUBSTITUTIONS OF PLANT MATERIAL WITHOUT PRIOR WRITTEN APPROVAL BY THE LANDSCAPE ARCHITECT.
5.MATERIAL WILL BE INSPECTED AND APPROVED AT PLACE OF GROWTH BY THE LANDSCAPE ARCHITECT. HOWEVER, PLANT MATERIAL WHICH HAS BECOME
DAMAGED OR DISEASED OR WHICH IS UNACCEPTABLE TO THE LANDSCAPE ARCHITECT MAY BE REJECTED UPON DELIVERY TO THE SITE.
6.SHOULD THERE BE ANY DISCREPANCIES BETWEEN THE QUANTITIES CALLED FOR ON THE PLANT LIST AND THOSE INDICATED ON THE PLAN, NOTIFY
LANDSCAPE ARCHITECT FOR CLARIFICATION.
7.AT ALL TIMES, THE SITE SHALL BE KEPT NEAT AND FREE OF DEBRIS LEFT FROM THE PLANTING OPERATION.
8.ALL PLANT MATERIAL SHALL BE KEPT VIGOROUS, AND FREE OF ANY INJURY AND DEFECTS. ALL PLANT MATERIAL SHALL BE A TRUE REPRESENTATION OF
THEIR SPECIES.
9.PLANT GROUPINGS AND LOCATIONS ARE DIAGRAMMATIC. THE LOCATION OF PLANTS SHALL BE APPROVED IN THE FIELD BY THE LANDSCAPE ARCHITECT
PRIOR TO INSTALLATION. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO MAKE ADJUSTMENTS TO ANY AND ALL PLANTING LAYOUT IN THE FIELD AT NO
ADDITIONAL COST TO THE OWNER.
10.ALL PLANT TAGS MUST REMAIN ON THE PLANT MATERIAL UNTIL THE LANDSCAPE ARCHITECT REVIEWS THE LAYOUT AND APPROVES THE QUANTITIES.
11.PLANTING BEDS SHALL RECEIVE A 2" THICK LAYER OF MULCH, INDICATED ON THE PLANTING DETAILS.
12.SEE SHEET L-400 FOR PLANT SCHEDULE.
13.SEE L-820 FOR PLANTING DETAILS.
14.SEE L-830 FOR SOIL DETAILS.
15.SEE L-310 & L-311 FOR SOILS PLAN.
7TTTTTTTTTTHISTORIC EASEMENTGASFH FHCBWATERMAINHBHBHB HB<+<+DIDIDI DI MHMHMHMHMHMHMH<+FUTURESCULPTURELOCATION HBMHDIELECTRICTRANSFORMER20' TYP.20'-0" TYP.8'-8"11'-4"CL10'-2"9'-11"19'18'QPQP QPQPQPQPh1QB2QM2QM2QM2QM2QB2QPh1QPh1QMa1QMa1QMa1TCQM1QM1QM1QMa1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1TCMVMV MVNS1QB1QB1MVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMV MV MVQM2QPh1QMa1 LEGENDLIMIT OF WORK LINESHRUB AND GROUNDCOVER,SEE L420 & L421PROPOSED TREE PLANTINGEXISTING TREEDIFHHBSTONE FLAGBUILDING ENTRANCEMHEXISTING UTILITY STRUCTURES,SEE CIVIL DWGSPROPOSED UTILITY STRUCTURES,SEE CIVIL DWGSDIMHHOSE BIB, SEE MEP DWGSPROPOSED FIRE HYDRANT,SEE CIVIL DWGSCB<+YARD HYDRANT, SEEIRRIGATION SPECSLOG PATHPROPOSED SHRUB PLANTINGNS2QPhNOTE:1.SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.2.SEE L-400 FOR PLANTING SCHEDULENOTES:1.ALL PLANTING AREAS TO BE IRRIGATED, SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.2.CONTRACTOR SHALL PROVIDE LANDSCAPE ARCHITECT WITH MIN. 24 HOUR ADVANCE NOTICE OF PLANT INSTALLATION.3.ALL PLANTS SHALL BE PLANTED AT THE TIME OF DELIVERY DUE TO LIMITED STORAGE ON SITE. PLANTS IN THE SAME PLANTING BED SHALL BE PLANTED ATTHE SAME TIME. ANY PLANTS REMAINING UNPLANTED ON THE SITE FOR MORE THAN 24 HOURS SHALL BE PROTECTED AND MAINTAINED INCLUDING BUT NOTLIMITED TO PROVIDING WATER AND SHADE. ANY PLANTS THAT DIE OR ARE DAMAGED DUE TO ON-SITE STORAGE SHALL BE REPLACED AT THE CONTRACTOR'SEXPENSE.4.THERE WILL BE NO SUBSTITUTIONS OF PLANT MATERIAL WITHOUT PRIOR WRITTEN APPROVAL BY THE LANDSCAPE ARCHITECT.5.MATERIAL WILL BE INSPECTED AND APPROVED AT PLACE OF GROWTH BY THE LANDSCAPE ARCHITECT. HOWEVER, PLANT MATERIAL WHICH HAS BECOMEDAMAGED OR DISEASED OR WHICH IS UNACCEPTABLE TO THE LANDSCAPE ARCHITECT MAY BE REJECTED UPON DELIVERY TO THE SITE.6.SHOULD THERE BE ANY DISCREPANCIES BETWEEN THE QUANTITIES CALLED FOR ON THE PLANT LIST AND THOSE INDICATED ON THE PLAN, NOTIFYLANDSCAPE ARCHITECT FOR CLARIFICATION.7.AT ALL TIMES, THE SITE SHALL BE KEPT NEAT AND FREE OF DEBRIS LEFT FROM THE PLANTING OPERATION.8.ALL PLANT MATERIAL SHALL BE KEPT VIGOROUS, AND FREE OF ANY INJURY AND DEFECTS. ALL PLANT MATERIAL SHALL BE A TRUE REPRESENTATION OFTHEIR SPECIES.9.PLANT GROUPINGS AND LOCATIONS ARE DIAGRAMMATIC. THE LOCATION OF PLANTS SHALL BE APPROVED IN THE FIELD BY THE LANDSCAPE ARCHITECTPRIOR TO INSTALLATION. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO MAKE ADJUSTMENTS TO ANY AND ALL PLANTING LAYOUT IN THE FIELD AT NOADDITIONAL COST TO THE OWNER.10.ALL PLANT TAGS MUST REMAIN ON THE PLANT MATERIAL UNTIL THE LANDSCAPE ARCHITECT REVIEWS THE LAYOUT AND APPROVES THE QUANTITIES.11.PLANTING BEDS SHALL RECEIVE A 2" THICK LAYER OF MULCH, INDICATED ON THE PLANTING DETAILS.12.SEE SHEET L-400 FOR PLANT SCHEDULE.13.SEE L-820 FOR PLANTING DETAILS.14.SEE L-830 FOR SOIL DETAILS.14.SEE L-310 & L-311 FOR SOILS PLAN.8 8 8
FH
HB
HB
<+
<+
<+
<+
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
FUTURE
SCULPTURE
LOCATION
20'42'19'40'-11"20'-1"
TD1
TD1
TD1
TD1
TD1
TD2
TD1
TD1
TD1
TD2
NS1
TD1
NS1
TD2
TD2
TD2
NS2
TD2
NS2
NS2
NS2
TD2
NS2
TD2
NS2
TD2
TD2
TD2
TD2
TD2
NS2NS2
NS2
NS2
NS2
NS2
TD2
TD2TD2
TD2
NS2
TD2
NS1 TD2
NS2
TD2
NS2
NS2
TD2
TD2
TD3
NS3
TD2
TD3
TD3
TD2
TD3
TD2
TD2
NS3
QB2
NS1NS1
NS1NS1
NS1NS1
TCTC
TCTC
TCTCTC
NS1NS1NS1NS1
NS1NS1NS1NS1
NS1NS1NS1NS1
NS1NS1NS1NS1
NS1NS1NS1NS1
NS1NS1NS1NS1
NS1NS1NS1NS1
NS1NS1NS1NS1
NS1NS1NS1NS1
NS1NS1NS1NS1
NS1NS1NS1NS1
NS1NS1NS1NS1
NS1NS1NS1NS1
NS1NS1NS1NS1
NS1NS1NS1
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
MV MV MV MV MV MV MV
MVMV
QPh2
QPh2
MV
MV
QPh1
QPh1
QPh1
NS1
NOTE:
1.SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.SEE L-400 FOR PLANTING SCHEDULE
LEGEND
LIMIT OF WORK LINE
SHRUB AND GROUNDCOVER,
SEE L420 & L421
PROPOSED TREE PLANTING
EXISTING TREE
DI
FH
HB
STONE FLAG
BUILDING ENTRANCE
MH
EXISTING UTILITY STRUCTURES,
SEE CIVIL DWGS
PROPOSED UTILITY STRUCTURES,
SEE CIVIL DWGS
DI
MH
HOSE BIB, SEE MEP DWGS
PROPOSED FIRE HYDRANT,
SEE CIVIL DWGS
CB
<+YARD HYDRANT, SEE
IRRIGATION SPECS
LOG PATH
PROPOSED SHRUB PLANTING
NS2QPh
0 8'16'32'
SCALE: 1/16" = 1'-0"
NOTES:
1.ALL PLANTING AREAS TO BE IRRIGATED, SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.CONTRACTOR SHALL PROVIDE LANDSCAPE ARCHITECT WITH MIN. 24 HOUR ADVANCE NOTICE OF PLANT INSTALLATION.
3.ALL PLANTS SHALL BE PLANTED AT THE TIME OF DELIVERY DUE TO LIMITED STORAGE ON SITE. PLANTS IN THE SAME PLANTING BED SHALL BE PLANTED AT
THE SAME TIME. ANY PLANTS REMAINING UNPLANTED ON THE SITE FOR MORE THAN 24 HOURS SHALL BE PROTECTED AND MAINTAINED INCLUDING BUT NOT
LIMITED TO PROVIDING WATER AND SHADE. ANY PLANTS THAT DIE OR ARE DAMAGED DUE TO ON-SITE STORAGE SHALL BE REPLACED AT THE CONTRACTOR'S
EXPENSE.
4.THERE WILL BE NO SUBSTITUTIONS OF PLANT MATERIAL WITHOUT PRIOR WRITTEN APPROVAL BY THE LANDSCAPE ARCHITECT.
5.MATERIAL WILL BE INSPECTED AND APPROVED AT PLACE OF GROWTH BY THE LANDSCAPE ARCHITECT. HOWEVER, PLANT MATERIAL WHICH HAS BECOME
DAMAGED OR DISEASED OR WHICH IS UNACCEPTABLE TO THE LANDSCAPE ARCHITECT MAY BE REJECTED UPON DELIVERY TO THE SITE.
6.SHOULD THERE BE ANY DISCREPANCIES BETWEEN THE QUANTITIES CALLED FOR ON THE PLANT LIST AND THOSE INDICATED ON THE PLAN, NOTIFY
LANDSCAPE ARCHITECT FOR CLARIFICATION.
7.AT ALL TIMES, THE SITE SHALL BE KEPT NEAT AND FREE OF DEBRIS LEFT FROM THE PLANTING OPERATION.
8.ALL PLANT MATERIAL SHALL BE KEPT VIGOROUS, AND FREE OF ANY INJURY AND DEFECTS. ALL PLANT MATERIAL SHALL BE A TRUE REPRESENTATION OF
THEIR SPECIES.
9.PLANT GROUPINGS AND LOCATIONS ARE DIAGRAMMATIC. THE LOCATION OF PLANTS SHALL BE APPROVED IN THE FIELD BY THE LANDSCAPE ARCHITECT
PRIOR TO INSTALLATION. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO MAKE ADJUSTMENTS TO ANY AND ALL PLANTING LAYOUT IN THE FIELD AT NO
ADDITIONAL COST TO THE OWNER.
10.ALL PLANT TAGS MUST REMAIN ON THE PLANT MATERIAL UNTIL THE LANDSCAPE ARCHITECT REVIEWS THE LAYOUT AND APPROVES THE QUANTITIES.
11.PLANTING BEDS SHALL RECEIVE A 2" THICK LAYER OF MULCH, INDICATED ON THE PLANTING DETAILS.
12.SEE SHEET L-400 FOR PLANT SCHEDULE.
13.SEE L-820 FOR PLANTING DETAILS.
14.SEE L-830 FOR SOIL DETAILS.
15.SEE L-310 & L-311 FOR SOILS PLAN.
7TTT T TTTTTT HISTORIC EASEMENTGASFH FHCBWATERMAINHBHBHB HB<+<+DI
DI
DI
DI
MHMHMHMHMHMHMH<+FUTURESCULPTURELOCATION HBMHDIELECTRIC
TRANSFORMER20' TYP.20'-0" TYP.8'-8"11'-4"CL10'-2"9'-11"19'18'QPQP QPQPQPQPh1QB2QM2QM2QM2QM2QB2QPh1QPh1QMa1QMa1QMa1TCQM1QM1QM1QMa1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1NS1TCMVMV MVNS1QB1QB1MVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMVMV MV MVQM2QPh1QMa1 LEGENDLIMIT OF WORK LINESHRUB AND GROUNDCOVER,SEE L420 & L421PROPOSED TREE PLANTINGEXISTING TREEDIFHHBSTONE FLAGBUILDING ENTRANCEMHEXISTING UTILITY STRUCTURES,SEE CIVIL DWGSPROPOSED UTILITY STRUCTURES,SEE CIVIL DWGSDIMHHOSE BIB, SEE MEP DWGSPROPOSED FIRE HYDRANT,SEE CIVIL DWGSCB<+YARD HYDRANT, SEEIRRIGATION SPECSLOG PATHPROPOSED SHRUB PLANTINGNS2QPhNOTE:1.SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.2.SEE L-400 FOR PLANTING SCHEDULENOTES:1.ALL PLANTING AREAS TO BE IRRIGATED, SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.2.CONTRACTOR SHALL PROVIDE LANDSCAPE ARCHITECT WITH MIN. 24 HOUR ADVANCE NOTICE OF PLANT INSTALLATION.3.ALL PLANTS SHALL BE PLANTED AT THE TIME OF DELIVERY DUE TO LIMITED STORAGE ON SITE. PLANTS IN THE SAME PLANTING BED SHALL BE PLANTED ATTHE SAME TIME. ANY PLANTS REMAINING UNPLANTED ON THE SITE FOR MORE THAN 24 HOURS SHALL BE PROTECTED AND MAINTAINED INCLUDING BUT NOTLIMITED TO PROVIDING WATER AND SHADE. ANY PLANTS THAT DIE OR ARE DAMAGED DUE TO ON-SITE STORAGE SHALL BE REPLACED AT THE CONTRACTOR'SEXPENSE.4.THERE WILL BE NO SUBSTITUTIONS OF PLANT MATERIAL WITHOUT PRIOR WRITTEN APPROVAL BY THE LANDSCAPE ARCHITECT.5.MATERIAL WILL BE INSPECTED AND APPROVED AT PLACE OF GROWTH BY THE LANDSCAPE ARCHITECT. HOWEVER, PLANT MATERIAL WHICH HAS BECOMEDAMAGED OR DISEASED OR WHICH IS UNACCEPTABLE TO THE LANDSCAPE ARCHITECT MAY BE REJECTED UPON DELIVERY TO THE SITE.6.SHOULD THERE BE ANY DISCREPANCIES BETWEEN THE QUANTITIES CALLED FOR ON THE PLANT LIST AND THOSE INDICATED ON THE PLAN, NOTIFYLANDSCAPE ARCHITECT FOR CLARIFICATION.7.AT ALL TIMES, THE SITE SHALL BE KEPT NEAT AND FREE OF DEBRIS LEFT FROM THE PLANTING OPERATION.8.ALL PLANT MATERIAL SHALL BE KEPT VIGOROUS, AND FREE OF ANY INJURY AND DEFECTS. ALL PLANT MATERIAL SHALL BE A TRUE REPRESENTATION OFTHEIR SPECIES.9.PLANT GROUPINGS AND LOCATIONS ARE DIAGRAMMATIC. THE LOCATION OF PLANTS SHALL BE APPROVED IN THE FIELD BY THE LANDSCAPE ARCHITECTPRIOR TO INSTALLATION. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO MAKE ADJUSTMENTS TO ANY AND ALL PLANTING LAYOUT IN THE FIELD AT NOADDITIONAL COST TO THE OWNER.10.ALL PLANT TAGS MUST REMAIN ON THE PLANT MATERIAL UNTIL THE LANDSCAPE ARCHITECT REVIEWS THE LAYOUT AND APPROVES THE QUANTITIES.11.PLANTING BEDS SHALL RECEIVE A 2" THICK LAYER OF MULCH, INDICATED ON THE PLANTING DETAILS.12.SEE SHEET L-400 FOR PLANT SCHEDULE.13.SEE L-820 FOR PLANTING DETAILS.14.SEE L-830 FOR SOIL DETAILS.14.SEE L-310 & L-311 FOR SOILS PLAN.8 8 8
FH
HB
HB
<+
<+
<+
<+
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
FUTURE
SCULPTURE
LOCATION
20'42'19'40'-11"20'-1"
TD1
TD1
TD1
TD1
TD1
TD2
TD1
TD1
TD1
TD2
NS1
TD1
NS1
TD2
TD2
TD2
NS2
TD2
NS2
NS2
NS2
TD2
NS2
TD2
NS2
TD2
TD2
TD2
TD2
TD2
NS2
NS2
NS2
NS2
NS2
NS2
TD2
TD2TD2
TD2
NS2
TD2
NS1 TD2
NS2
TD2
NS2
NS2
TD2
TD2
TD3
NS3
TD2
TD3
TD3
TD2
TD3
TD2
TD2
NS3
QB2
NS1 NS1
NS1NS1
NS1 NS1
TC TC
TC TC
TC TC TC
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
MV MV MV MV MV MV MV
MVMV
QPh2
QPh2
MV
MV
QPh1
QPh1
QPh1
NS1
NOTE:
1.SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.SEE L-400 FOR PLANTING SCHEDULE
LEGEND
LIMIT OF WORK LINE
SHRUB AND GROUNDCOVER,
SEE L420 & L421
PROPOSED TREE PLANTING
EXISTING TREE
DI
FH
HB
STONE FLAG
BUILDING ENTRANCE
MH
EXISTING UTILITY STRUCTURES,
SEE CIVIL DWGS
PROPOSED UTILITY STRUCTURES,
SEE CIVIL DWGS
DI
MH
HOSE BIB, SEE MEP DWGS
PROPOSED FIRE HYDRANT,
SEE CIVIL DWGS
CB
<+YARD HYDRANT, SEE
IRRIGATION SPECS
LOG PATH
PROPOSED SHRUB PLANTING
NS2QPh
0 8'16'32'
SCALE: 1/16" = 1'-0"
NOTES:
1.ALL PLANTING AREAS TO BE IRRIGATED, SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.CONTRACTOR SHALL PROVIDE LANDSCAPE ARCHITECT WITH MIN. 24 HOUR ADVANCE NOTICE OF PLANT INSTALLATION.
3.ALL PLANTS SHALL BE PLANTED AT THE TIME OF DELIVERY DUE TO LIMITED STORAGE ON SITE. PLANTS IN THE SAME PLANTING BED SHALL BE PLANTED AT
THE SAME TIME. ANY PLANTS REMAINING UNPLANTED ON THE SITE FOR MORE THAN 24 HOURS SHALL BE PROTECTED AND MAINTAINED INCLUDING BUT NOT
LIMITED TO PROVIDING WATER AND SHADE. ANY PLANTS THAT DIE OR ARE DAMAGED DUE TO ON-SITE STORAGE SHALL BE REPLACED AT THE CONTRACTOR'S
EXPENSE.
4.THERE WILL BE NO SUBSTITUTIONS OF PLANT MATERIAL WITHOUT PRIOR WRITTEN APPROVAL BY THE LANDSCAPE ARCHITECT.
5.MATERIAL WILL BE INSPECTED AND APPROVED AT PLACE OF GROWTH BY THE LANDSCAPE ARCHITECT. HOWEVER, PLANT MATERIAL WHICH HAS BECOME
DAMAGED OR DISEASED OR WHICH IS UNACCEPTABLE TO THE LANDSCAPE ARCHITECT MAY BE REJECTED UPON DELIVERY TO THE SITE.
6.SHOULD THERE BE ANY DISCREPANCIES BETWEEN THE QUANTITIES CALLED FOR ON THE PLANT LIST AND THOSE INDICATED ON THE PLAN, NOTIFY
LANDSCAPE ARCHITECT FOR CLARIFICATION.
7.AT ALL TIMES, THE SITE SHALL BE KEPT NEAT AND FREE OF DEBRIS LEFT FROM THE PLANTING OPERATION.
8.ALL PLANT MATERIAL SHALL BE KEPT VIGOROUS, AND FREE OF ANY INJURY AND DEFECTS. ALL PLANT MATERIAL SHALL BE A TRUE REPRESENTATION OF
THEIR SPECIES.
9.PLANT GROUPINGS AND LOCATIONS ARE DIAGRAMMATIC. THE LOCATION OF PLANTS SHALL BE APPROVED IN THE FIELD BY THE LANDSCAPE ARCHITECT
PRIOR TO INSTALLATION. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO MAKE ADJUSTMENTS TO ANY AND ALL PLANTING LAYOUT IN THE FIELD AT NO
ADDITIONAL COST TO THE OWNER.
10.ALL PLANT TAGS MUST REMAIN ON THE PLANT MATERIAL UNTIL THE LANDSCAPE ARCHITECT REVIEWS THE LAYOUT AND APPROVES THE QUANTITIES.
11.PLANTING BEDS SHALL RECEIVE A 2" THICK LAYER OF MULCH, INDICATED ON THE PLANTING DETAILS.
12.SEE SHEET L-400 FOR PLANT SCHEDULE.
13.SEE L-820 FOR PLANTING DETAILS.
14.SEE L-830 FOR SOIL DETAILS.
15.SEE L-310 & L-311 FOR SOILS PLAN.
7
TTTT T
T TTT
T HISTORIC EASEMENTGAS
FH
FH
CB
WATER
MAIN
HB
HB
HB
HB
<+
<+
DI
DI
DI
DI
MH
MH
MH
MH
MH
MH
MH
<+
FUTURE
SCULPTURE
LOCATION
HB
MH
DI
ELECTRIC
TRANSFORMER20' TYP.20'-0" TYP.
8'-8"11'-4"CL10'-2"9'-11"19'18'
QP
QP
QP
QP
QP
QPh1QB2
QM2
QM2
QM2
QM2
QB2QPh1
QPh1QMa1 QMa1
QMa1
TC
QM1
QM1
QM1
QMa1
NS1 NS1 NS1
NS1
NS1
NS1
NS1
NS1
NS1 NS1
NS1
NS1
NS1
NS1
NS1
NS1
NS1
NS1
NS1 NS1 NS1
NS1 NS1
NS1 NS1
NS1 NS1 TC
MV
MV
MV
NS1
QB1
QB1
MV MV MVMVMV
MV
MV MVMVMV
MV
MV
MV
MV
MV
MV
MV
MV
MV
MV
MV
MV
MV
MVMV
MV MV MVMVMV
MV
MV
MV MV MV
QM2 QPh1
QMa1
LEGEND
LIMIT OF WORK LINE
SHRUB AND GROUNDCOVER,
SEE L420 & L421
PROPOSED TREE PLANTING
EXISTING TREE
DI
FH
HB
STONE FLAG
BUILDING ENTRANCE
MH
EXISTING UTILITY STRUCTURES,
SEE CIVIL DWGS
PROPOSED UTILITY STRUCTURES,
SEE CIVIL DWGS
DI
MH
HOSE BIB, SEE MEP DWGS
PROPOSED FIRE HYDRANT,
SEE CIVIL DWGS
CB
<+YARD HYDRANT, SEE
IRRIGATION SPECS
LOG PATH
PROPOSED SHRUB PLANTING
NS2QPh
NOTE:
1.SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.SEE L-400 FOR PLANTING SCHEDULE
NOTES:1.ALL PLANTING AREAS TO BE IRRIGATED, SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.2.CONTRACTOR SHALL PROVIDE LANDSCAPE ARCHITECT WITH MIN. 24 HOUR ADVANCE NOTICE OF PLANT INSTALLATION.3.ALL PLANTS SHALL BE PLANTED AT THE TIME OF DELIVERY DUE TO LIMITED STORAGE ON SITE. PLANTS IN THE SAME PLANTING BED SHALL BE PLANTED ATTHE SAME TIME. ANY PLANTS REMAINING UNPLANTED ON THE SITE FOR MORE THAN 24 HOURS SHALL BE PROTECTED AND MAINTAINED INCLUDING BUT NOTLIMITED TO PROVIDING WATER AND SHADE. ANY PLANTS THAT DIE OR ARE DAMAGED DUE TO ON-SITE STORAGE SHALL BE REPLACED AT THE CONTRACTOR'SEXPENSE.4.THERE WILL BE NO SUBSTITUTIONS OF PLANT MATERIAL WITHOUT PRIOR WRITTEN APPROVAL BY THE LANDSCAPE ARCHITECT.5.MATERIAL WILL BE INSPECTED AND APPROVED AT PLACE OF GROWTH BY THE LANDSCAPE ARCHITECT. HOWEVER, PLANT MATERIAL WHICH HAS BECOMEDAMAGED OR DISEASED OR WHICH IS UNACCEPTABLE TO THE LANDSCAPE ARCHITECT MAY BE REJECTED UPON DELIVERY TO THE SITE.
6.SHOULD THERE BE ANY DISCREPANCIES BETWEEN THE QUANTITIES CALLED FOR ON THE PLANT LIST AND THOSE INDICATED ON THE PLAN, NOTIFY
LANDSCAPE ARCHITECT FOR CLARIFICATION.
7.AT ALL TIMES, THE SITE SHALL BE KEPT NEAT AND FREE OF DEBRIS LEFT FROM THE PLANTING OPERATION.
8.ALL PLANT MATERIAL SHALL BE KEPT VIGOROUS, AND FREE OF ANY INJURY AND DEFECTS. ALL PLANT MATERIAL SHALL BE A TRUE REPRESENTATION OF
THEIR SPECIES.
9.PLANT GROUPINGS AND LOCATIONS ARE DIAGRAMMATIC. THE LOCATION OF PLANTS SHALL BE APPROVED IN THE FIELD BY THE LANDSCAPE ARCHITECT
PRIOR TO INSTALLATION. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO MAKE ADJUSTMENTS TO ANY AND ALL PLANTING LAYOUT IN THE FIELD AT NO
ADDITIONAL COST TO THE OWNER.
10.ALL PLANT TAGS MUST REMAIN ON THE PLANT MATERIAL UNTIL THE LANDSCAPE ARCHITECT REVIEWS THE LAYOUT AND APPROVES THE QUANTITIES.
11.PLANTING BEDS SHALL RECEIVE A 2" THICK LAYER OF MULCH, INDICATED ON THE PLANTING DETAILS.
12.SEE SHEET L-400 FOR PLANT SCHEDULE.
13.SEE L-820 FOR PLANTING DETAILS.
14.SEE L-830 FOR SOIL DETAILS.
14.SEE L-310 & L-311 FOR SOILS PLAN.
8
8
8
FH
HB
HB
<+
<+
<+
<+
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
FUTURE
SCULPTURE
LOCATION
20'42'19'40'-11"20'-1"
TD1
TD1
TD1
TD1
TD1
TD2
TD1
TD1
TD1
TD2
NS1
TD1
NS1
TD2
TD2
TD2
NS2
TD2
NS2
NS2
NS2
TD2
NS2
TD2
NS2
TD2
TD2
TD2
TD2
TD2
NS2NS2
NS2
NS2
NS2
NS2
TD2
TD2TD2
TD2
NS2
TD2
NS1 TD2
NS2
TD2
NS2
NS2
TD2
TD2
TD3
NS3
TD2
TD3
TD3
TD2
TD3
TD2
TD2
NS3
QB2
NS1 NS1
NS1NS1
NS1 NS1
TC TC
TC TC
TC TC TC
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
MV MV MV MV MV MV MV
MVMV
QPh2
QPh2
MV
MV
QPh1
QPh1
QPh1
NS1
NOTE:
1.SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.SEE L-400 FOR PLANTING SCHEDULE
LEGEND
LIMIT OF WORK LINE
SHRUB AND GROUNDCOVER,
SEE L420 & L421
PROPOSED TREE PLANTING
EXISTING TREE
DI
FH
HB
STONE FLAG
BUILDING ENTRANCE
MH
EXISTING UTILITY STRUCTURES,
SEE CIVIL DWGS
PROPOSED UTILITY STRUCTURES,
SEE CIVIL DWGS
DI
MH
HOSE BIB, SEE MEP DWGS
PROPOSED FIRE HYDRANT,
SEE CIVIL DWGS
CB
<+YARD HYDRANT, SEE
IRRIGATION SPECS
LOG PATH
PROPOSED SHRUB PLANTING
NS2QPh
0 8'16'32'
SCALE: 1/16" = 1'-0"
NOTES:
1.ALL PLANTING AREAS TO BE IRRIGATED, SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.CONTRACTOR SHALL PROVIDE LANDSCAPE ARCHITECT WITH MIN. 24 HOUR ADVANCE NOTICE OF PLANT INSTALLATION.
3.ALL PLANTS SHALL BE PLANTED AT THE TIME OF DELIVERY DUE TO LIMITED STORAGE ON SITE. PLANTS IN THE SAME PLANTING BED SHALL BE PLANTED AT
THE SAME TIME. ANY PLANTS REMAINING UNPLANTED ON THE SITE FOR MORE THAN 24 HOURS SHALL BE PROTECTED AND MAINTAINED INCLUDING BUT NOT
LIMITED TO PROVIDING WATER AND SHADE. ANY PLANTS THAT DIE OR ARE DAMAGED DUE TO ON-SITE STORAGE SHALL BE REPLACED AT THE CONTRACTOR'S
EXPENSE.
4.THERE WILL BE NO SUBSTITUTIONS OF PLANT MATERIAL WITHOUT PRIOR WRITTEN APPROVAL BY THE LANDSCAPE ARCHITECT.
5.MATERIAL WILL BE INSPECTED AND APPROVED AT PLACE OF GROWTH BY THE LANDSCAPE ARCHITECT. HOWEVER, PLANT MATERIAL WHICH HAS BECOME
DAMAGED OR DISEASED OR WHICH IS UNACCEPTABLE TO THE LANDSCAPE ARCHITECT MAY BE REJECTED UPON DELIVERY TO THE SITE.
6.SHOULD THERE BE ANY DISCREPANCIES BETWEEN THE QUANTITIES CALLED FOR ON THE PLANT LIST AND THOSE INDICATED ON THE PLAN, NOTIFY
LANDSCAPE ARCHITECT FOR CLARIFICATION.
7.AT ALL TIMES, THE SITE SHALL BE KEPT NEAT AND FREE OF DEBRIS LEFT FROM THE PLANTING OPERATION.
8.ALL PLANT MATERIAL SHALL BE KEPT VIGOROUS, AND FREE OF ANY INJURY AND DEFECTS. ALL PLANT MATERIAL SHALL BE A TRUE REPRESENTATION OF
THEIR SPECIES.
9.PLANT GROUPINGS AND LOCATIONS ARE DIAGRAMMATIC. THE LOCATION OF PLANTS SHALL BE APPROVED IN THE FIELD BY THE LANDSCAPE ARCHITECT
PRIOR TO INSTALLATION. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO MAKE ADJUSTMENTS TO ANY AND ALL PLANTING LAYOUT IN THE FIELD AT NO
ADDITIONAL COST TO THE OWNER.
10.ALL PLANT TAGS MUST REMAIN ON THE PLANT MATERIAL UNTIL THE LANDSCAPE ARCHITECT REVIEWS THE LAYOUT AND APPROVES THE QUANTITIES.
11.PLANTING BEDS SHALL RECEIVE A 2" THICK LAYER OF MULCH, INDICATED ON THE PLANTING DETAILS.
12.SEE SHEET L-400 FOR PLANT SCHEDULE.
13.SEE L-820 FOR PLANTING DETAILS.
14.SEE L-830 FOR SOIL DETAILS.
15.SEE L-310 & L-311 FOR SOILS PLAN.
7
DRAFT
ELEVATION , SIZE, AND DETAILS SHOWN ON SHEET 16 & 25 ELEVATION , SIZE, AND DETAILS SHOWN ON SHEET 16 & 25 ELEVATION , SIZE, AND DETAILS SHOWN ON SHEET 16 & 25
ELEVATION , SIZE, AND DETAILS SHOWN ON SHEET 25 ELEVATION , SIZE, AND DETAILS SHOWN ON SHEET 25
Sign Types 131 & 132 - Courtyard Entrance Graphics – Locations 016 & 018 Sign Types 131 & 132 - Terrace Entrance Graphics – Locations 042 & 044 Sign Type 130 - Building Address – Location 014
Detailed Sign Locations Series 100
Refer to Sign Location Plans for the following sign type locations:
140 - Vehicular Regulatory
150 - Accessible Parking ID
Sign locations for accessible parking identication and "do not
enter" signs per Civil Engineer drawings; refer to C-301 and C-302
for details TTTT TTTTTT HISTORIC EASEMENTGASFH FHCBWATERMAINHBHBHB
HB
<+<+DI
DI
DI
DI
MHMHMHMHMHMHMH<+FUTURESCULPTURELOCATION HBMHDI
ELECTRIC
TRANSFORMER
TD1 TD1NS1 TD1TD1NS1 NS2TD2TD2NS2 TD2TD2NS2TD2TD2TD2TD2TD2TD2NS2TD2TD2TD2TD2QPQPQPQPQPQPh1QBQM2QMa1QM2QM2QM2QM2QM2QM2QM2QM2QM1QM2
QM2
QB QBQBQBQB
QB
QPh1 QPh1QPh1QPh1QPh1QPh1QPh1QPh1QMa1QMa1QMa1QMa1QMa1 QMa1
QMa1
QMa1 QMa1
QMa1
QMa1 NS1QM1QM1QM1QM2QMa1QM2QMa1QM2QBNS3 TD3NS3TD320' TYP.20'-0" TYP.8'-8"11'-4"CL10'-2"9'-11"19'18'LEGENDLIMIT OF WORK LINESHRUB AND GROUNDCOVER,SEE L420 & L421PROPOSED TREE PLANTINGEXISTING TREEDI
FH
HB STONE FLAGBUILDING ENTRANCEMHEXISTING UTILITY STRUCTURES,SEE CIVIL DWGSPROPOSED UTILITY STRUCTURES,SEE CIVIL DWGSDIMHHOSE BIB, SEE MEP DWGS
PROPOSED FIRE HYDRANT,
SEE CIVIL DWGS
CB
<+YARD HYDRANT, SEE
IRRIGATION SPECS
LOG PATHPROPOSED SHRUB PLANTINGNS2QPhNOTE:1.SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.2.SEE L-400 FOR PLANTING SCHEDULENOTES:1.ALL PLANTING AREAS TO BE IRRIGATED, SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.2.CONTRACTOR SHALL PROVIDE LANDSCAPE ARCHITECT WITH MIN. 24 HOUR ADVANCE NOTICE OF PLANT INSTALLATION.3.ALL PLANTS SHALL BE PLANTED AT THE TIME OF DELIVERY DUE TO LIMITED STORAGE ON SITE. PLANTS IN THE SAME PLANTING BED SHALL BE PLANTED ATTHE SAME TIME. ANY PLANTS REMAINING UNPLANTED ON THE SITE FOR MORE THAN 24 HOURS SHALL BE PROTECTED AND MAINTAINED INCLUDING BUT NOTLIMITED TO PROVIDING WATER AND SHADE. ANY PLANTS THAT DIE OR ARE DAMAGED DUE TO ON-SITE STORAGE SHALL BE REPLACED AT THE CONTRACTOR'SEXPENSE.4.THERE WILL BE NO SUBSTITUTIONS OF PLANT MATERIAL WITHOUT PRIOR WRITTEN APPROVAL BY THE LANDSCAPE ARCHITECT.5.MATERIAL WILL BE INSPECTED AND APPROVED AT PLACE OF GROWTH BY THE LANDSCAPE ARCHITECT. HOWEVER, PLANT MATERIAL WHICH HAS BECOMEDAMAGED OR DISEASED OR WHICH IS UNACCEPTABLE TO THE LANDSCAPE ARCHITECT MAY BE REJECTED UPON DELIVERY TO THE SITE.6.SHOULD THERE BE ANY DISCREPANCIES BETWEEN THE QUANTITIES CALLED FOR ON THE PLANT LIST AND THOSE INDICATED ON THE PLAN, NOTIFYLANDSCAPE ARCHITECT FOR CLARIFICATION.7.AT ALL TIMES, THE SITE SHALL BE KEPT NEAT AND FREE OF DEBRIS LEFT FROM THE PLANTING OPERATION.8.ALL PLANT MATERIAL SHALL BE KEPT VIGOROUS, AND FREE OF ANY INJURY AND DEFECTS. ALL PLANT MATERIAL SHALL BE A TRUE REPRESENTATION OFTHEIR SPECIES.9.PLANT GROUPINGS AND LOCATIONS ARE DIAGRAMMATIC. THE LOCATION OF PLANTS SHALL BE APPROVED IN THE FIELD BY THE LANDSCAPE ARCHITECTPRIOR TO INSTALLATION. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO MAKE ADJUSTMENTS TO ANY AND ALL PLANTING LAYOUT IN THE FIELD AT NOADDITIONAL COST TO THE OWNER.10.ALL PLANT TAGS MUST REMAIN ON THE PLANT MATERIAL UNTIL THE LANDSCAPE ARCHITECT REVIEWS THE LAYOUT AND APPROVES THE QUANTITIES.11.PLANTING BEDS SHALL RECEIVE A 2" THICK LAYER OF MULCH, INDICATED ON THE PLANTING DETAILS.12.SEE SHEET L-400 FOR PLANT SCHEDULE.13.SEE L-820 FOR PLANTING DETAILS.14.SEE L-830 FOR SOIL DETAILS.14.SEE L-310 & L-311 FOR SOILS PLAN.
TD1
TD1
TD1
NS1
TD1
TD1
TD2
TD1
TD1
TD1
TD2
NS1
TD1
NS1
TD2
TD2
TD2
NS2
TD2
NS2
NS2
NS2
TD2
NS2
TD2
NS2
TD2
TD2 TD2
TD2
TD2NS2
NS2
NS2
NS2
NS2
NS2
TD2
TD2
TD2
TD2
NS2
TD2
NS1
TD2
NS2
TD2
NS2
NS2
QB
QB
TD2
TD2
QM2
QM2
QM2
QM2QM
QM2
QM2
QM2 QM2
QM2
QM2
QM2 QM2
QM2
QM
QM2
QM QM2
QM2
QM2
QM2 QM2
QM2
QB
QB
QB
QB
QB
QB
QB
QB
QB
QB QB
QB
QB
QB
QB
QBQB
QBQB
QB
QPh1
QPh1
QPh1
QPh1
QPh1
QPh1 QPh1
QPh1
QPh1
QPh1
QPh1
QPh1 QPh1
QPh1
QPh1
QPh1
QPh1
QPh1 QPh1
QPh1
QPh1
QPh1QPh1QPh1
QPh1
QPh1 QPh1
QMa1
QMa1
QMa1
QMa1
QMa1
QMa1
QMa1
QMa1
QMa1
QMa1
QMa1 QMa1
QMa1QMa1
QMa1
QMa1
QMa1QMa1
QMa1QMa1QMa1
QMa1
QMa1 QMa1
QMa1
QMa1
QMa1
QMa1
QMa1
QMa1
TD3
QMa1
QB
QMa1
NS3
TD2
TD2
TD3
TD3
TD2
TD2
TD3
TD2
TD2
NS3
QPh1 TD2
TD2TD3
QPh2
QPh2
QMa2
FH
HB
HB
<+
<+
<+
<+
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
FUTURE
SCULPTURE
LOCATION
FUTURE
SCULPTURE
LOCATION
FUTURE
SCULPTURE
LOCATION
FUTURE
SCULPTURE
LOCATION
FUTURE
SCULPTURE
LOCATION
20'42'19'40'-11"20'-1"
NOTE:
1.SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.SEE L-400 FOR PLANTING SCHEDULE
LEGEND
LIMIT OF WORK LINE
SHRUB AND GROUNDCOVER,
SEE L420 & L421
PROPOSED TREE PLANTING
EXISTING TREE
DI
FH
HB
STONE FLAG
BUILDING ENTRANCE
MH
EXISTING UTILITY STRUCTURES,
SEE CIVIL DWGS
PROPOSED UTILITY STRUCTURES,
SEE CIVIL DWGS
DI
MH
HOSE BIB, SEE MEP DWGS
PROPOSED FIRE HYDRANT,
SEE CIVIL DWGS
CB
<+YARD HYDRANT, SEE
IRRIGATION SPECS
LOG PATH
PROPOSED SHRUB PLANTING
NS2QPh
0 8'16'32'
SCALE: 1/16" = 1'-0"
NOTES:
1.ALL PLANTING AREAS TO BE IRRIGATED, SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.CONTRACTOR SHALL PROVIDE LANDSCAPE ARCHITECT WITH MIN. 24 HOUR ADVANCE NOTICE OF PLANT INSTALLATION.
3.ALL PLANTS SHALL BE PLANTED AT THE TIME OF DELIVERY DUE TO LIMITED STORAGE ON SITE. PLANTS IN THE SAME PLANTING BED SHALL BE PLANTED AT
THE SAME TIME. ANY PLANTS REMAINING UNPLANTED ON THE SITE FOR MORE THAN 24 HOURS SHALL BE PROTECTED AND MAINTAINED INCLUDING BUT NOT
LIMITED TO PROVIDING WATER AND SHADE. ANY PLANTS THAT DIE OR ARE DAMAGED DUE TO ON-SITE STORAGE SHALL BE REPLACED AT THE CONTRACTOR'S
EXPENSE.
4.THERE WILL BE NO SUBSTITUTIONS OF PLANT MATERIAL WITHOUT PRIOR WRITTEN APPROVAL BY THE LANDSCAPE ARCHITECT.
5.MATERIAL WILL BE INSPECTED AND APPROVED AT PLACE OF GROWTH BY THE LANDSCAPE ARCHITECT. HOWEVER, PLANT MATERIAL WHICH HAS BECOME
DAMAGED OR DISEASED OR WHICH IS UNACCEPTABLE TO THE LANDSCAPE ARCHITECT MAY BE REJECTED UPON DELIVERY TO THE SITE.
6.SHOULD THERE BE ANY DISCREPANCIES BETWEEN THE QUANTITIES CALLED FOR ON THE PLANT LIST AND THOSE INDICATED ON THE PLAN, NOTIFY
LANDSCAPE ARCHITECT FOR CLARIFICATION.
7.AT ALL TIMES, THE SITE SHALL BE KEPT NEAT AND FREE OF DEBRIS LEFT FROM THE PLANTING OPERATION.
8.ALL PLANT MATERIAL SHALL BE KEPT VIGOROUS, AND FREE OF ANY INJURY AND DEFECTS. ALL PLANT MATERIAL SHALL BE A TRUE REPRESENTATION OF
THEIR SPECIES.
9.PLANT GROUPINGS AND LOCATIONS ARE DIAGRAMMATIC. THE LOCATION OF PLANTS SHALL BE APPROVED IN THE FIELD BY THE LANDSCAPE ARCHITECT
PRIOR TO INSTALLATION. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO MAKE ADJUSTMENTS TO ANY AND ALL PLANTING LAYOUT IN THE FIELD AT NO
ADDITIONAL COST TO THE OWNER.
10.ALL PLANT TAGS MUST REMAIN ON THE PLANT MATERIAL UNTIL THE LANDSCAPE ARCHITECT REVIEWS THE LAYOUT AND APPROVES THE QUANTITIES.
11.PLANTING BEDS SHALL RECEIVE A 2" THICK LAYER OF MULCH, INDICATED ON THE PLANTING DETAILS.
12.SEE SHEET L-400 FOR PLANT SCHEDULE.
13.SEE L-820 FOR PLANTING DETAILS.
14.SEE L-830 FOR SOIL DETAILS.
15.SEE L-310 & L-311 FOR SOILS PLAN.TTTT T
TTT
T
T HISTORIC EASEMENTGAS
FH
FH
CB
WATER
MAIN
HB
HB
HB
HB
<+<+
DI
DI
DI
DI
MH
MH
MH
MHMH
MH
MH<+FUTURESCULPTURELOCATION
HB
MH
DI
ELECTRIC
TRANSFORMER
TD1
TD1
NS1
TD1
TD1
NS1
NS2
TD2
TD2
NS2
TD2
TD2
NS2
TD2
TD2
TD2
TD2
TD2
TD2
NS2
TD2TD2TD2 TD2 QPQP QPQPQPQPh1QBQM2QMa1QM2QM2QM2QM2QM2QM2QM2QM2
QM1
QM2
QM2
QBQB
QB
QB
QB
QB
QPh1QPh1QPh1QPh1
QPh1
QPh1
QPh1
QPh1
QMa1QMa1QMa1QMa1QMa1QMa1
QMa1
QMa1
QMa1
QMa1
QMa1
NS1
QM1 QM1 QM1QM2QMa1QM2QMa1QM2
QB
NS3
TD3
NS3
TD320' TYP.20'-0" TYP.8'-8"11'-4"CL10'-2"9'-11"19'18'
LEGEND
LIMIT OF WORK LINE
SHRUB AND GROUNDCOVER,
SEE L420 & L421
PROPOSED TREE PLANTING
EXISTING TREE
DI
FH
HB
STONE FLAG
BUILDING ENTRANCE
MH
EXISTING UTILITY STRUCTURES,
SEE CIVIL DWGS
PROPOSED UTILITY STRUCTURES,
SEE CIVIL DWGS
DI
MH
HOSE BIB, SEE MEP DWGS
PROPOSED FIRE HYDRANT,
SEE CIVIL DWGS
CB
<+YARD HYDRANT, SEE
IRRIGATION SPECS
LOG PATH
PROPOSED SHRUB PLANTING
NS2QPh
NOTE:
1.SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.SEE L-400 FOR PLANTING SCHEDULE
NOTES:1.ALL PLANTING AREAS TO BE IRRIGATED, SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.2.CONTRACTOR SHALL PROVIDE LANDSCAPE ARCHITECT WITH MIN. 24 HOUR ADVANCE NOTICE OF PLANT INSTALLATION.3.ALL PLANTS SHALL BE PLANTED AT THE TIME OF DELIVERY DUE TO LIMITED STORAGE ON SITE. PLANTS IN THE SAME PLANTING BED SHALL BE PLANTED ATTHE SAME TIME. ANY PLANTS REMAINING UNPLANTED ON THE SITE FOR MORE THAN 24 HOURS SHALL BE PROTECTED AND MAINTAINED INCLUDING BUT NOTLIMITED TO PROVIDING WATER AND SHADE. ANY PLANTS THAT DIE OR ARE DAMAGED DUE TO ON-SITE STORAGE SHALL BE REPLACED AT THE CONTRACTOR'SEXPENSE.4.THERE WILL BE NO SUBSTITUTIONS OF PLANT MATERIAL WITHOUT PRIOR WRITTEN APPROVAL BY THE LANDSCAPE ARCHITECT.5.MATERIAL WILL BE INSPECTED AND APPROVED AT PLACE OF GROWTH BY THE LANDSCAPE ARCHITECT. HOWEVER, PLANT MATERIAL WHICH HAS BECOMEDAMAGED OR DISEASED OR WHICH IS UNACCEPTABLE TO THE LANDSCAPE ARCHITECT MAY BE REJECTED UPON DELIVERY TO THE SITE.6.SHOULD THERE BE ANY DISCREPANCIES BETWEEN THE QUANTITIES CALLED FOR ON THE PLANT LIST AND THOSE INDICATED ON THE PLAN, NOTIFYLANDSCAPE ARCHITECT FOR CLARIFICATION.7.AT ALL TIMES, THE SITE SHALL BE KEPT NEAT AND FREE OF DEBRIS LEFT FROM THE PLANTING OPERATION.8.ALL PLANT MATERIAL SHALL BE KEPT VIGOROUS, AND FREE OF ANY INJURY AND DEFECTS. ALL PLANT MATERIAL SHALL BE A TRUE REPRESENTATION OFTHEIR SPECIES.9.PLANT GROUPINGS AND LOCATIONS ARE DIAGRAMMATIC. THE LOCATION OF PLANTS SHALL BE APPROVED IN THE FIELD BY THE LANDSCAPE ARCHITECTPRIOR TO INSTALLATION. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO MAKE ADJUSTMENTS TO ANY AND ALL PLANTING LAYOUT IN THE FIELD AT NOADDITIONAL COST TO THE OWNER.10.ALL PLANT TAGS MUST REMAIN ON THE PLANT MATERIAL UNTIL THE LANDSCAPE ARCHITECT REVIEWS THE LAYOUT AND APPROVES THE QUANTITIES.11.PLANTING BEDS SHALL RECEIVE A 2" THICK LAYER OF MULCH, INDICATED ON THE PLANTING DETAILS.12.SEE SHEET L-400 FOR PLANT SCHEDULE.13.SEE L-820 FOR PLANTING DETAILS.14.SEE L-830 FOR SOIL DETAILS.14.SEE L-310 & L-311 FOR SOILS PLAN.
TD1
TD1
TD1
NS1
TD1
TD1
TD2
TD1
TD1
TD1
TD2
NS1
TD1
NS1
TD2
TD2
TD2
NS2
TD2
NS2
NS2
NS2
TD2
NS2
TD2
NS2
TD2
TD2 TD2
TD2
TD2NS2
NS2
NS2
NS2
NS2
NS2
TD2
TD2
TD2
TD2
NS2
TD2
NS1
TD2
NS2
TD2
NS2
NS2
QB
QB
TD2
TD2
QM2
QM2
QM2
QM2QM
QM2
QM2
QM2QM2
QM2
QM2
QM2QM2
QM2
QM
QM2
QMQM2
QM2
QM2
QM2QM2
QM2
QB
QB
QB
QB
QB
QB
QB
QB
QB
QBQB
QB
QB
QB
QB
QBQB
QBQB
QB
QPh1
QPh1
QPh1
QPh1
QPh1
QPh1QPh1
QPh1
QPh1
QPh1
QPh1
QPh1QPh1
QPh1
QPh1
QPh1
QPh1
QPh1QPh1
QPh1
QPh1
QPh1QPh1QPh1
QPh1
QPh1QPh1
QMa1
QMa1
QMa1
QMa1
QMa1
QMa1
QMa1
QMa1
QMa1
QMa1
QMa1QMa1
QMa1QMa1
QMa1
QMa1
QMa1QMa1
QMa1QMa1QMa1
QMa1
QMa1QMa1
QMa1
QMa1
QMa1
QMa1
QMa1
QMa1
TD3
QMa1
QB
QMa1
NS3
TD2
TD2
TD3
TD3
TD2
TD2
TD3
TD2
TD2
NS3
QPh1 TD2
TD2TD3
QPh2
QPh2
QMa2
FH
HB
HB
<+
<+
<+
<+
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
FUTURE
SCULPTURE
LOCATION
FUTURE
SCULPTURE
LOCATION
FUTURE
SCULPTURE
LOCATION
FUTURE
SCULPTURE
LOCATION
FUTURE
SCULPTURE
LOCATION
20'42'19'40'-11"20'-1"
NOTE:
1.SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.SEE L-400 FOR PLANTING SCHEDULE
LEGEND
LIMIT OF WORK LINE
SHRUB AND GROUNDCOVER,
SEE L420 & L421
PROPOSED TREE PLANTING
EXISTING TREE
DI
FH
HB
STONE FLAG
BUILDING ENTRANCE
MH
EXISTING UTILITY STRUCTURES,
SEE CIVIL DWGS
PROPOSED UTILITY STRUCTURES,
SEE CIVIL DWGS
DI
MH
HOSE BIB, SEE MEP DWGS
PROPOSED FIRE HYDRANT,
SEE CIVIL DWGS
CB
<+YARD HYDRANT, SEE
IRRIGATION SPECS
LOG PATH
PROPOSED SHRUB PLANTING
NS2QPh
0 8'16'32'
SCALE: 1/16" = 1'-0"
NOTES:
1.ALL PLANTING AREAS TO BE IRRIGATED, SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.CONTRACTOR SHALL PROVIDE LANDSCAPE ARCHITECT WITH MIN. 24 HOUR ADVANCE NOTICE OF PLANT INSTALLATION.
3.ALL PLANTS SHALL BE PLANTED AT THE TIME OF DELIVERY DUE TO LIMITED STORAGE ON SITE. PLANTS IN THE SAME PLANTING BED SHALL BE PLANTED AT
THE SAME TIME. ANY PLANTS REMAINING UNPLANTED ON THE SITE FOR MORE THAN 24 HOURS SHALL BE PROTECTED AND MAINTAINED INCLUDING BUT NOT
LIMITED TO PROVIDING WATER AND SHADE. ANY PLANTS THAT DIE OR ARE DAMAGED DUE TO ON-SITE STORAGE SHALL BE REPLACED AT THE CONTRACTOR'S
EXPENSE.
4.THERE WILL BE NO SUBSTITUTIONS OF PLANT MATERIAL WITHOUT PRIOR WRITTEN APPROVAL BY THE LANDSCAPE ARCHITECT.
5.MATERIAL WILL BE INSPECTED AND APPROVED AT PLACE OF GROWTH BY THE LANDSCAPE ARCHITECT. HOWEVER, PLANT MATERIAL WHICH HAS BECOME
DAMAGED OR DISEASED OR WHICH IS UNACCEPTABLE TO THE LANDSCAPE ARCHITECT MAY BE REJECTED UPON DELIVERY TO THE SITE.
6.SHOULD THERE BE ANY DISCREPANCIES BETWEEN THE QUANTITIES CALLED FOR ON THE PLANT LIST AND THOSE INDICATED ON THE PLAN, NOTIFY
LANDSCAPE ARCHITECT FOR CLARIFICATION.
7.AT ALL TIMES, THE SITE SHALL BE KEPT NEAT AND FREE OF DEBRIS LEFT FROM THE PLANTING OPERATION.
8.ALL PLANT MATERIAL SHALL BE KEPT VIGOROUS, AND FREE OF ANY INJURY AND DEFECTS. ALL PLANT MATERIAL SHALL BE A TRUE REPRESENTATION OF
THEIR SPECIES.
9.PLANT GROUPINGS AND LOCATIONS ARE DIAGRAMMATIC. THE LOCATION OF PLANTS SHALL BE APPROVED IN THE FIELD BY THE LANDSCAPE ARCHITECT
PRIOR TO INSTALLATION. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO MAKE ADJUSTMENTS TO ANY AND ALL PLANTING LAYOUT IN THE FIELD AT NO
ADDITIONAL COST TO THE OWNER.
10.ALL PLANT TAGS MUST REMAIN ON THE PLANT MATERIAL UNTIL THE LANDSCAPE ARCHITECT REVIEWS THE LAYOUT AND APPROVES THE QUANTITIES.
11.PLANTING BEDS SHALL RECEIVE A 2" THICK LAYER OF MULCH, INDICATED ON THE PLANTING DETAILS.
12.SEE SHEET L-400 FOR PLANT SCHEDULE.
13.SEE L-820 FOR PLANTING DETAILS.
14.SEE L-830 FOR SOIL DETAILS.
15.SEE L-310 & L-311 FOR SOILS PLAN.TTTT T
T TTT
T HISTORIC EASEMENTGAS
FH
FH
CB
WATER
MAIN
HB
HB
HB
HB
<+<+
DI
DI
DI
DI
MH
MH
MH
MHMH
MH
MH<+FUTURESCULPTURELOCATION
HB
MH
DI
ELECTRIC
TRANSFORMER
TD1
TD1
NS1
TD1
TD1
NS1
NS2
TD2
TD2
NS2
TD2
TD2
NS2
TD2
TD2
TD2
TD2
TD2
TD2
NS2
TD2
TD2
TD2 TD2
QPQP
QP
QPQPQPh1QBQM2QMa1QM2QM2QM2QM2QM2QM2
QM2
QM2
QM1
QM2
QM2
QB QB
QB
QB
QB
QB
QPh1 QPh1QPh1QPh1
QPh1
QPh1
QPh1
QPh1
QMa1QMa1QMa1
QMa1
QMa1 QMa1
QMa1
QMa1
QMa1
QMa1
QMa1
NS1
QM1 QM1
QM1
QM2 QMa1 QM2 QMa1QM2
QB
NS3
TD3
NS3
TD320' TYP.20'-0" TYP.8'-8"11'-4"CL10'-2"9'-11"19'18'
LEGEND
LIMIT OF WORK LINE
SHRUB AND GROUNDCOVER,
SEE L420 & L421
PROPOSED TREE PLANTING
EXISTING TREE
DI
FH
HB
STONE FLAG
BUILDING ENTRANCE
MH
EXISTING UTILITY STRUCTURES,
SEE CIVIL DWGS
PROPOSED UTILITY STRUCTURES,
SEE CIVIL DWGS
DI
MH
HOSE BIB, SEE MEP DWGS
PROPOSED FIRE HYDRANT,
SEE CIVIL DWGS
CB
<+YARD HYDRANT, SEE
IRRIGATION SPECS
LOG PATH
PROPOSED SHRUB PLANTING
NS2QPh
NOTE:
1.SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.SEE L-400 FOR PLANTING SCHEDULE
NOTES:1.ALL PLANTING AREAS TO BE IRRIGATED, SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.2.CONTRACTOR SHALL PROVIDE LANDSCAPE ARCHITECT WITH MIN. 24 HOUR ADVANCE NOTICE OF PLANT INSTALLATION.3.ALL PLANTS SHALL BE PLANTED AT THE TIME OF DELIVERY DUE TO LIMITED STORAGE ON SITE. PLANTS IN THE SAME PLANTING BED SHALL BE PLANTED ATTHE SAME TIME. ANY PLANTS REMAINING UNPLANTED ON THE SITE FOR MORE THAN 24 HOURS SHALL BE PROTECTED AND MAINTAINED INCLUDING BUT NOTLIMITED TO PROVIDING WATER AND SHADE. ANY PLANTS THAT DIE OR ARE DAMAGED DUE TO ON-SITE STORAGE SHALL BE REPLACED AT THE CONTRACTOR'SEXPENSE.4.THERE WILL BE NO SUBSTITUTIONS OF PLANT MATERIAL WITHOUT PRIOR WRITTEN APPROVAL BY THE LANDSCAPE ARCHITECT.5.MATERIAL WILL BE INSPECTED AND APPROVED AT PLACE OF GROWTH BY THE LANDSCAPE ARCHITECT. HOWEVER, PLANT MATERIAL WHICH HAS BECOMEDAMAGED OR DISEASED OR WHICH IS UNACCEPTABLE TO THE LANDSCAPE ARCHITECT MAY BE REJECTED UPON DELIVERY TO THE SITE.6.SHOULD THERE BE ANY DISCREPANCIES BETWEEN THE QUANTITIES CALLED FOR ON THE PLANT LIST AND THOSE INDICATED ON THE PLAN, NOTIFYLANDSCAPE ARCHITECT FOR CLARIFICATION.7.AT ALL TIMES, THE SITE SHALL BE KEPT NEAT AND FREE OF DEBRIS LEFT FROM THE PLANTING OPERATION.8.ALL PLANT MATERIAL SHALL BE KEPT VIGOROUS, AND FREE OF ANY INJURY AND DEFECTS. ALL PLANT MATERIAL SHALL BE A TRUE REPRESENTATION OFTHEIR SPECIES.9.PLANT GROUPINGS AND LOCATIONS ARE DIAGRAMMATIC. THE LOCATION OF PLANTS SHALL BE APPROVED IN THE FIELD BY THE LANDSCAPE ARCHITECTPRIOR TO INSTALLATION. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO MAKE ADJUSTMENTS TO ANY AND ALL PLANTING LAYOUT IN THE FIELD AT NOADDITIONAL COST TO THE OWNER.10.ALL PLANT TAGS MUST REMAIN ON THE PLANT MATERIAL UNTIL THE LANDSCAPE ARCHITECT REVIEWS THE LAYOUT AND APPROVES THE QUANTITIES.11.PLANTING BEDS SHALL RECEIVE A 2" THICK LAYER OF MULCH, INDICATED ON THE PLANTING DETAILS.12.SEE SHEET L-400 FOR PLANT SCHEDULE.13.SEE L-820 FOR PLANTING DETAILS.14.SEE L-830 FOR SOIL DETAILS.14.SEE L-310 & L-311 FOR SOILS PLAN.
TD1
TD1
TD1
NS1
TD1
TD1
TD2
TD1
TD1
TD1
TD2
NS1
TD1
NS1
TD2
TD2
TD2
NS2
TD2
NS2
NS2
NS2
TD2
NS2
TD2
NS2
TD2
TD2 TD2
TD2
TD2NS2
NS2
NS2
NS2
NS2
NS2
TD2
TD2
TD2
TD2
NS2
TD2
NS1
TD2
NS2
TD2
NS2
NS2
QB
QB
TD2
TD2
QM2
QM2
QM2
QM2QM
QM2
QM2
QM2 QM2
QM2
QM2
QM2 QM2
QM2
QM
QM2
QM QM2
QM2
QM2
QM2 QM2
QM2
QB
QB
QB
QB
QB
QB
QB
QB
QB
QB QB
QB
QB
QB
QB
QBQB
QBQB
QB
QPh1
QPh1
QPh1
QPh1
QPh1
QPh1 QPh1
QPh1
QPh1
QPh1
QPh1
QPh1 QPh1
QPh1
QPh1
QPh1
QPh1
QPh1 QPh1
QPh1
QPh1
QPh1QPh1QPh1
QPh1
QPh1 QPh1
QMa1
QMa1
QMa1
QMa1
QMa1
QMa1
QMa1
QMa1
QMa1
QMa1
QMa1 QMa1
QMa1QMa1
QMa1
QMa1
QMa1QMa1
QMa1QMa1QMa1
QMa1
QMa1 QMa1
QMa1
QMa1
QMa1
QMa1
QMa1
QMa1
TD3
QMa1
QB
QMa1
NS3
TD2
TD2
TD3
TD3
TD2
TD2
TD3
TD2
TD2
NS3
QPh1 TD2
TD2TD3
QPh2
QPh2
QMa2
FH
HB
HB
<+
<+
<+
<+
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
MH
MH
MH
MH
MH
MH
MH
MH
MH
MH
FUTURE
SCULPTURE
LOCATION
FUTURE
SCULPTURE
LOCATION
FUTURE
SCULPTURE
LOCATION
FUTURE
SCULPTURE
LOCATION
FUTURE
SCULPTURE
LOCATION
20'42'19'40'-11"20'-1"
NOTE:
1.SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.SEE L-400 FOR PLANTING SCHEDULE
LEGEND
LIMIT OF WORK LINE
SHRUB AND GROUNDCOVER,
SEE L420 & L421
PROPOSED TREE PLANTING
EXISTING TREE
DI
FH
HB
STONE FLAG
BUILDING ENTRANCE
MH
EXISTING UTILITY STRUCTURES,
SEE CIVIL DWGS
PROPOSED UTILITY STRUCTURES,
SEE CIVIL DWGS
DI
MH
HOSE BIB, SEE MEP DWGS
PROPOSED FIRE HYDRANT,
SEE CIVIL DWGS
CB
<+YARD HYDRANT, SEE
IRRIGATION SPECS
LOG PATH
PROPOSED SHRUB PLANTING
NS2QPh
0 8'16'32'
SCALE: 1/16" = 1'-0"
NOTES:
1.ALL PLANTING AREAS TO BE IRRIGATED, SEE IRRIGATION DRAWINGS AND SPECIFICATIONS.
2.CONTRACTOR SHALL PROVIDE LANDSCAPE ARCHITECT WITH MIN. 24 HOUR ADVANCE NOTICE OF PLANT INSTALLATION.
3.ALL PLANTS SHALL BE PLANTED AT THE TIME OF DELIVERY DUE TO LIMITED STORAGE ON SITE. PLANTS IN THE SAME PLANTING BED SHALL BE PLANTED AT
THE SAME TIME. ANY PLANTS REMAINING UNPLANTED ON THE SITE FOR MORE THAN 24 HOURS SHALL BE PROTECTED AND MAINTAINED INCLUDING BUT NOT
LIMITED TO PROVIDING WATER AND SHADE. ANY PLANTS THAT DIE OR ARE DAMAGED DUE TO ON-SITE STORAGE SHALL BE REPLACED AT THE CONTRACTOR'S
EXPENSE.
4.THERE WILL BE NO SUBSTITUTIONS OF PLANT MATERIAL WITHOUT PRIOR WRITTEN APPROVAL BY THE LANDSCAPE ARCHITECT.
5.MATERIAL WILL BE INSPECTED AND APPROVED AT PLACE OF GROWTH BY THE LANDSCAPE ARCHITECT. HOWEVER, PLANT MATERIAL WHICH HAS BECOME
DAMAGED OR DISEASED OR WHICH IS UNACCEPTABLE TO THE LANDSCAPE ARCHITECT MAY BE REJECTED UPON DELIVERY TO THE SITE.
6.SHOULD THERE BE ANY DISCREPANCIES BETWEEN THE QUANTITIES CALLED FOR ON THE PLANT LIST AND THOSE INDICATED ON THE PLAN, NOTIFY
LANDSCAPE ARCHITECT FOR CLARIFICATION.
7.AT ALL TIMES, THE SITE SHALL BE KEPT NEAT AND FREE OF DEBRIS LEFT FROM THE PLANTING OPERATION.
8.ALL PLANT MATERIAL SHALL BE KEPT VIGOROUS, AND FREE OF ANY INJURY AND DEFECTS. ALL PLANT MATERIAL SHALL BE A TRUE REPRESENTATION OF
THEIR SPECIES.
9.PLANT GROUPINGS AND LOCATIONS ARE DIAGRAMMATIC. THE LOCATION OF PLANTS SHALL BE APPROVED IN THE FIELD BY THE LANDSCAPE ARCHITECT
PRIOR TO INSTALLATION. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO MAKE ADJUSTMENTS TO ANY AND ALL PLANTING LAYOUT IN THE FIELD AT NO
ADDITIONAL COST TO THE OWNER.
10.ALL PLANT TAGS MUST REMAIN ON THE PLANT MATERIAL UNTIL THE LANDSCAPE ARCHITECT REVIEWS THE LAYOUT AND APPROVES THE QUANTITIES.
11.PLANTING BEDS SHALL RECEIVE A 2" THICK LAYER OF MULCH, INDICATED ON THE PLANTING DETAILS.
12.SEE SHEET L-400 FOR PLANT SCHEDULE.
13.SEE L-820 FOR PLANTING DETAILS.
14.SEE L-830 FOR SOIL DETAILS.
15.SEE L-310 & L-311 FOR SOILS PLAN.
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
13
PROJECT DESIGNERS
Page Southerland Page, Inc
ELEVATION , SIZE, AND DETAILS SHOWN ON SHEET 29 ELEVATION , SIZE, AND DETAILS SHOWN ON SHEET 29 ELEVATION , SIZE, AND DETAILS SHOWN ON SHEET 28
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
14
PROJECT DESIGNERS
Page Southerland Page, Inc
<+
DI
<+
S-RA (5)
S-FG (76)
S-FG (70)
S-PL (5)
S-IGp (3)
S-IGv (6)
S-IGp (4)
S-IGv (3)
S-IGp (14)
S-IGp (7)
S-IGv (5)
S-PL (5)
S-PL (3)S-IGv (13)
S-PL (5)
S-IGv (10)
S-IGv (10)
S-IGp (15)S-PL (3)
S-PL (3)
S-IGv (7)
S-PL (7)
S-VN (1)
S-IP (7)
S-IGv (8)
S-IGv (5)
S-IGp (4)
S-IGp (4)
Scale: 1/16" = 1'-0"
17'-0" from Street102'-0" from Drive
Sign edge oriented
to sidewalk
Detailed Sign Location Primary Monument ID – Location 054
DRAFT
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
15
PROJECT DESIGNERS
Page Southerland Page, Inc
DI
DI
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1 NS1
NS1 NS1 NS1
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
Scale: 1/16" = 1'-0"
28'-0" from Street
8'-0" from Drive
Sign face aligned
with hardscape
Detailed Sign Location Secondary Monument ID – Location 074
DRAFT
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
16
PROJECT DESIGNERS
Page Southerland Page, Inc
WATER
MAIN
MH
MH
S-PL (5)
S-PL (5)
S-IGv (2)
S-IGv (16)
S-IGp (1)
S-IGp (2)
S-IGp (7)
S-IGp (5)
DIS-RA (15)
S-RA (16)
S-RA (11)
S-PL (4)
S-PL (5)
S-IGv (3)
S-IGv (14)
S-IGp (23)
S-IGv (15)
0' - 0"
S-MC (72)
Scale: 1/4" = 1'-0"
1'-6" from Sidewalk
3'-0" from edge of Hardscape
1'-6" from Curb
1'-6" from Path
1'-6" from Path
3'-0" from Curb
Location 058Typical Installation Diagram Location 064
Detailed Sign Locations Wayfinding Directionals
DRAFT
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
17
PROJECT DESIGNERS
Page Southerland Page, Inc
Scale: 1/32" = 1'-0"Scale: 1/4" = 1'-0"Typical Installation Diagram
15'-6" from Street
EQ EQ84'-0" to Center 84'-0" to Center
Detailed Sign Locations Freestanding Banners
DRAFT
Note:
Refer to Crescent Lawn landscape plans for nal locations
ELEVATION , SIZE, AND DETAILS SHOWN ON SHEET 26 & 27
Series 100
Sign Type Sheets
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
18
PROJECT DESIGNERS
Page Southerland Page, Inc
1 West Elevation
Scale: 1/4" = 1'-0"
2 East Elevation
Scale: 1/4" = 1'-0"
5
7
4
45'-0"40'-0" Cabinet Width
3 Plan View
Scale: 1/4" = 1'-0"
6
2'-0"
2'-0"
7'-6"
2'-0"
1'-3"
2'-0"
26°
154°
26°
154°
NOTESSign Type 100 Primary Monument ID (1 of 3)
Dimensions
40'-0" W x 3'-9" H x 2'-0" D Sign Cabinet
40'-0" W x (Varies) x 2'-0" D Concrete Base
44'-0" W x 6'-0" H Exposed Hardscape
Fabrication
Double-sided fabricated metal sign cabinet
with internal tube frame structure, powder-
coated nish, exposed concrete base, and
pin-mounted letters.
Sign cabinet faces to be free of exposed
hardware. Any visible face seams to be
equally spaced. All corners to be welded and
nished.
Cast-in-place concrete base with engineered
below-grade foundation (TBD sign
contractor) and inset linear lighting. Base to
follow cabinet angle and feature 1" reveal
around cabinet perimeter.
2" deep fabricated metal letters, painted C1
with UV-resistant clear coat in satin nish.
Letters to be pin-mounted with 5/8" spacers
nished to match color C3.
Lighting & Electrical
Design basis: Lumenpulse Lumenfacade
Inground xture with wall-washer optics
(LOI-WW).
Embedded linear LED xtures (3000k) with
continuous illumination, wall-washer optics,
and diffused lens. Distance from monument
sign TBD sign fabricator based on xture
specication.
Fixture housing to be approved for exterior
wet applications. Illumination to be even with
no shadows or hot spots.
All electrical to be concealed from norm
view. Sign Contractor is responsible for all
electrical coordination.
Coordination
Sign Contractor to coordinate with General
Contractor to have building power brought to
illuminated sign locations.
Final location and integration with plantings
to be coordinated with Landscape Architect.
DRAFTPROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
19
PROJECT DESIGNERS
Page Southerland Page, Inc
4 Monument Sign Section
Scale: 1" = 1'-0"5 North Elevation
Scale: 1/2" = 1'-0"
6 South Elevation
Scale: 1/2" = 1'-0"
Cast-in-place concrete sign
base with smooth face nish Finished grade
2" Deep fabricated channel letter
Fabricated metal sign cabinet bolted in place to
concrete base with fully concealed attachments;
All panel seams to be equally spaced
1" Reveal
Metal tube frame structure with bracing
as needed; Final interior structure TBD
Sign Contractor
Water-proofed top access panel with
counter-sunk, tamper-resistant hardware
Engineered below-grade concrete
foundation (TBD sign contractor) with
exposed hardscape; top to be ush
with nished grade
Embedded wall washer xture
2'-0"1'-6" ALIGNConcealed conduit for LED light xture
NOTESSign Type 100 Primary Monument ID (2 of 3)
Dimensions
40'-0" W x 3'-9" H x 2'-0" D Sign Cabinet
40'-0" W x (Varies) x 2'-0" D Concrete Base
44'-0" W x 6'-0" H Exposed Hardscape
Fabrication
Double-sided fabricated metal sign cabinet
with internal tube frame structure, powder-
coated nish, exposed concrete base, and
pin-mounted letters.
Sign cabinet faces to be free of exposed
hardware. Any visible face seams to be
equally spaced. All corners to be welded and
nished.
Cast-in-place concrete base with engineered
below-grade foundation (TBD sign
contractor) and inset linear lighting. Base to
follow cabinet angle and feature 1" reveal
around cabinet perimeter.
2" deep fabricated metal letters, painted C1
with UV-resistant clear coat in satin nish.
Letters to be pin-mounted with 5/8" spacers
nished to match color C3.
Lighting & Electrical
Design basis: Lumenpulse Lumenfacade
Inground xture with wall-washer optics
(LOI-WW).
Embedded linear LED xtures (3000k) with
continuous illumination, wall-washer optics,
and diffused lens. Distance from monument
sign TBD sign fabricator based on xture
specication.
Fixture housing to be approved for exterior
wet applications. Illumination to be even with
no shadows or hot spots.
All electrical to be concealed from norm
view. Sign Contractor is responsible for all
electrical coordination.
Coordination
Sign Contractor to coordinate with General
Contractor to have building power brought to
illuminated sign locations.
Final location and integration with plantings
to be coordinated with Landscape Architect.
DRAFTPROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
20
PROJECT DESIGNERS
Page Southerland Page, Inc
7 Layout Detail
Scale: 1/2" = 1'-0"
8 Lighting Reference Images
NTS
9 1/2"
9 1/2"
NOTESSign Type 100 Primary Monument ID (3 of 3)
Design Basis:
Lumenpulse Lumenfacade Inground LOI (Wallwash optics)
Dimensions
40'-0" W x 3'-9" H x 2'-0" D Sign Cabinet
40'-0" W x (Varies) x 2'-0" D Concrete Base
44'-0" W x 6'-0" H Exposed Hardscape
Fabrication
Double-sided fabricated metal sign cabinet
with internal tube frame structure, powder-
coated nish, exposed concrete base, and
pin-mounted letters.
Sign cabinet faces to be free of exposed
hardware. Any visible face seams to be
equally spaced. All corners to be welded and
nished.
Cast-in-place concrete base with engineered
below-grade foundation (TBD sign
contractor) and inset linear lighting. Base to
follow cabinet angle and feature 1" reveal
around cabinet perimeter.
2" deep fabricated metal letters, painted C1
with UV-resistant clear coat in satin nish.
Letters to be pin-mounted with 5/8" spacers
nished to match color C3.
Lighting & Electrical
Design basis: Lumenpulse Lumenfacade
Inground xture with wall-washer optics
(LOI-WW).
Embedded linear LED xtures (3000k) with
continuous illumination, wall-washer optics,
and diffused lens. Distance from monument
sign TBD sign fabricator based on xture
specication.
Fixture housing to be approved for exterior
wet applications. Illumination to be even with
no shadows or hot spots.
All electrical to be concealed from norm
view. Sign Contractor is responsible for all
electrical coordination.
Coordination
Sign Contractor to coordinate with General
Contractor to have building power brought to
illuminated sign locations.
Final location and integration with plantings
to be coordinated with Landscape Architect.
DRAFTPROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
21
PROJECT DESIGNERS
Page Southerland Page, Inc
2 South Elevation
Scale: 1/4" = 1'-0"3 Side View
Scale: 1/4" = 1'-0"
1 Plan View
Scale: 1/4" = 1'-0"
4 North Elevation –Night View
Scale: 1/4" = 1'-0"
Sign Type 101 Secondary Monument ID NOTES
Dimensions
28'-0" W x 3'-9" H x 2'-0" D Sign Cabinet
28'-0" W x (Varies) x 2'-0" D Concrete Base
32'-0" W x 6'-0" H Exposed Hardscape
Fabrication
Double-sided fabricated metal sign cabinet
with internal tube frame structure, powder-
coated nish, exposed concrete base, and
pin-mounted letters.
Sign cabinet faces to be free of exposed
hardware. Any visible face seams to be
equally spaced. All corners to be welded and
nished.
Cast-in-place concrete base with engineered
below-grade foundation (TBD sign
contractor) and inset linear lighting. Base to
follow cabinet angle and feature 1" reveal
around cabinet perimeter.
2" deep fabricated metal letters, painted C1
with UV-resistant clear coat in satin nish.
Letters to be pin-mounted with 5/8" spacers
nished to match color C3.
Lighting & Electrical
Design basis: Lumenpulse Lumenfacade
Inground xture with wall-washer optics
(LOI-WW).
Embedded linear LED xtures (3000k) with
continuous illumination, wall-washer optics,
and diffused lens. Distance from monument
sign TBD sign fabricator based on xture
specication.
Fixture housing to be approved for exterior
wet applications. Illumination to be even with
no shadows or hot spots.
All electrical to be concealed from norm
view. Sign Contractor is responsible for all
electrical coordination.
Coordination
Sign Contractor to coordinate with General
Contractor to have building power brought to
illuminated sign locations.
Final location and integration with plantings
to be coordinated with Landscape Architect.
DRAFTPROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
22
PROJECT DESIGNERS
Page Southerland Page, Inc
Note:
Refer to Sign Type 100 for drawing details
NOTESSign Type 102 Courtyard Arrival ID
Dimensions
4 1/2" H x 3/8" D Letters
Fabrication
3/8" thick water-jet-cut stainless steel
letters with non-directional brushed face,
sandblasted returns, and protective clear
coat; pin-mounted to building facade with
1/4" standoffs painted to match building
facade.
Material: M2
Content
Content shown for illustrative purposes only.
Coordination
Final wall placement to be coordinated with
Landscape Architect for unobscured view.
Owner to provide donor name.
DRAFT
4 1/2"
Placeholder Name 1937 Courtyard Entrance
2'-0" from edge of wall
9'-8" AFF
2 North Courtyard –West Elevation
Scale: 1/8" = 1'-0"
1 Detail
Scale: 3/4" = 1'-0"
Placeholder Name 1937 Courtyard Entrance
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
23
PROJECT DESIGNERS
Page Southerland Page, Inc
NOTES
Dimensions
4 1/2" H x 3/8" D Letters
Fabrication
3/8" thick water-jet-cut stainless steel
letters with non-directional brushed face,
sandblasted returns, and protective clear
coat; pin-mounted to building facade with
1/4" standoffs painted to match building
facade.
Material: M2
Content
Content shown for illustrative purposes only.
Coordination
Final wall placement to be coordinated with
Landscape Architect for unobscured view.
Owner to provide donor name.
Sign Type 103 Terrace Arrival ID
DRAFT
Baseline aligns to
top of window on
West Elevation
Approx 9'-8" AFF
2'-0" from edge of wall
4 1/2"
Placeholder Name Park Entrance
2 South Entrance Wall –North Elevation
Scale: 1/8" = 1'-0"
1 Detail
Scale: 3/4" = 1'-0"
Placeholder Name Park Entrance
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
24
PROJECT DESIGNERS
Page Southerland Page, Inc
NOTES
1'- 9"
2"
2'-5"3'-2"7'-6"4
1 Elevation
Scale: 3/4" = 1'-0"2 Side Elevation
Scale: 3/4" = 1'-0"
Water-proofed top access panel with
counter-sunk, tamper-resistant hardware
3 Plan View
Scale: 1" = 1'-0"1'-6" 1'-6" C L
4 Cabinet Section
Scale: 3" = 1'-0"EQEQMetal tube frame with welded
L-brackets
Fabricated metal sign sleeve
with formed returns;
friction-tted onto brackets
Screenprinted graphics
Fabricated metal sign sleeve,
installed over bolted metal
frame; No exposed hardware
on sign face and returns
Metal tube frame structure with
bracing as needed; Bolted to
concrete foundation, Final interior
structure TBD Sign Contractor
Embedded wall washer xture
Bottom edge of sign
to touch hardscale
with no gaps
Finished grade
Engineered below-grade concrete
foundation (TBD sign contractor) with
exposed hardscape; top to be ush
with nished grade
Concealed conduit for LED light xture
Sign Type 120 Wayfinding Directional
Dimensions
1'-9" W x 7'-6" H x 2" D Sign Cabinet
2'-5" W x 3'-2" H Exposed Hardscape
Fabrication
Double-sided metal cabinet with internal
tube frame structure and screen-printed
letters.
Sign cabinet faces to be free of exposed
hardware. All corners to be welded and
nished. Cabinet painted in color C3, and
graphics screen-printed in color C1. Sign to
be nished with UV-resistant clear coat in
satin nish.
Engineered below grade foundation with
exposed concrete base (TBD sign contractor)
and inset linear lighting.
Lighting & Electrical
Design basis: Lumenpulse Lumenfacade
Inground xture with wall-washer optics
(LOI-WW).
Embedded linear LED xtures (3000k) with
continuous illumination, wall-washer optics,
and diffused lens. Distance from monument
sign TBD sign fabricator based on xture
specication.
Fixture housing to be approved for exterior
wet applications. Illumination to be even with
no shadows or hot spots.
All electrical to be concealed from norm
view. Sign Contractor is responsible for all
electrical coordination.
Coordination
Sign Contractor to coordinate with General
Contractor to have building power brought to
illuminated sign locations.
Final location and integration with plantings
to be coordinated with Landscape Architect.
DRAFTPROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
25
PROJECT DESIGNERS
Page Southerland Page, Inc
5'-0"
3"
2"
6"15'-0"10'-0" AFF
3 East Elevation
Scale: 3/8" = 1'-0"
1 Plan View
Scale: 1 1/2" = 1'-0"1'-6" C L
Approx. 5'-6"
Metal pole
Cover plate; bottom edge of plate
to touch hardscape with no gaps
Attachment plate mechanically
fastened to structural foundation
2 Section – Pole Base Detail
Scale: 3" = 1'-0"
Engineered below-grade concrete
foundation (TBD sign contractor) with
exposed hardscape; top to be ush
with nished grade
Concealed conduit for potential
integrated light xture
NOTES
Dimensions
5'-0" W x 15'-0" H Banner Material
6'-0" W x 25'-6" H Overall Pole Structure
Fabrication
6" metal pole with fabricated banner
brackets and no visible seams; mechanically
fastened to structural concrete base with
attachment plate; attachments to be
concealed with decorative cover plate.
Color: C2
Double-sided vinyl banner with wind slits to
reduce wind load. Sign Contractor to submit
sample of graphics on proposed material(s)
for approval prior to fabrication.
Engineered below grade foundation
with exposed concrete base (TBD sign
contractor).
Lighting & Electrical
Integrated lighting TBD pending further
review of existing lighting conditions and
approval of banner elements.
Brackets and xtures for down-lighting
of banner faces to be detailed per Sign
Contractor.
Fixture housing to be approved for exterior
wet applications. Illumination to be even with
no shadows or hot spots.
All electrical to be concealed from norm
view. Sign Contractor is responsible for all
electrical coordination.
Coordination
Sign Contractor to coordinate with General
Contractor to have building power brought to
illuminated sign locations.
Location and integration with plantings to be
coordinated with Landscape Architect.
Content
Banner artwork provided by Owner.
Sign Type 125 Freestanding Banner
DRAFT
Integrated LED xture with diffused
wall washer lens; vinyl banner faces
to be evenly illuminated
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
26
PROJECT DESIGNERS
Page Southerland Page, Inc
Sign Type 125 Freestanding Banner
8 Lighting Reference Images
NTS4Cabinet Section
NOTES
Dimensions
5'-0" W x 15'-0" H Banner Material
6'-0" W x 25'-6" H Overall Pole Structure
Fabrication
6" metal pole with fabricated banner
brackets and no visible seams; mechanically
fastened to structural concrete base with
attachment plate; attachments to be
concealed with decorative cover plate.
Color: C2
Double-sided vinyl banner with wind slits to
reduce wind load. Sign Contractor to submit
sample of graphics on proposed material(s)
for approval prior to fabrication.
Engineered below grade foundation
with exposed concrete base (TBD sign
contractor).
Lighting & Electrical
Integrated lighting TBD pending further
review of existing lighting conditions and
approval of banner elements.
Brackets and xtures for down-lighting
of banner faces to be detailed per Sign
Contractor.
Fixture housing to be approved for exterior
wet applications. Illumination to be even with
no shadows or hot spots.
All electrical to be concealed from norm
view. Sign Contractor is responsible for all
electrical coordination.
Coordination
Sign Contractor to coordinate with General
Contractor to have building power brought to
illuminated sign locations.
Location and integration with plantings to be
coordinated with Landscape Architect.
Content
Banner artwork provided by Owner.
DRAFTPROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
27
PROJECT DESIGNERS
Page Southerland Page, Inc
2 Building Exterior –North Elevation
Scale: 1/8" = 1'-0"
1 Letter Detail
Scale: 1" = 1'-0"
Side View
5011'-0"
501501 10'-0" AFF
1'-6" from wall edge
NOTES
Dimensions
1'-0" H x 1 1/2" D
Fabrication
Fabricated metal letters painted on all sides;
pin-mounted to brick facade with 1/2"
standoffs.
Letter Color: C1
Standoff Color: C3
Sign Type 130 Building Address
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
28
PROJECT DESIGNERS
Page Southerland Page, Inc
1 North Courtyard Entrance – Installation Elevation
Scale: 1" = 1'-0"
2 Sign Type 131 – Courtyard Layout
Scale: 1 1/2" = 1'-0"
3 Sign Type 132 – Typical Detail
Scale: 1 1/2" = 1'-0"
No smoking within 25 feet of building
entrances, exits, and operable windows.
Approx. 1'-0"
11"
1937 Courtyard Entrance
Mon–Fri 10:00 AM–6 PM
Saturday 10:30 AM–9 PM
Sunday CLOSED
1937 Courtyard Entrance
Mon–Fri 10:00 AM–6 PM
Saturday 10:30 AM–9 PM
Sunday CLOSED
No smoking within 25 feet of building
entrances, exits, and operable windows.
3 1/2" AFF
5'-9" AFF
C L
3 1/2"
NOTESSign Types 131 & 132 Entrance Graphics & No Smoking Vinyl
Dimensions
Approx. 1'-0" W
Fabrication
Cut translucent vinyl applied to second-
surface (interior surface) of glass.
Vinyl: V1, V2
Content
Owner to provide hours of operation and
conrm nal content.
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
29
PROJECT DESIGNERS
Page Southerland Page, Inc
1 South Park Entrance – Installation Elevation
Scale: 1" = 1'-0"
No smoking within 25 feet of building
entrances, exits, and operable windows.
Park Entrance
Mon–Fri 10:00 AM–6 PM
Saturday 10:30 AM–9 PM
Sunday CLOSED
2 Sign Type 131 – Park Layout
Scale: 1 1/2" = 1'-0"
3 Sign Type 132 – Typical Detail
Scale: 1 1/2" = 1'-0"
Approx. 1'-0"
11"
Park Entrance
Mon–Fri 10:00 AM–6 PM
Saturday 10:30 AM–9 PM
Sunday CLOSED
No smoking within 25 feet of building
entrances, exits, and operable windows.
5'-9" AFF
3 1/2" AFF
3 1/2"
NOTESSign Types 131 & 132 Entrance Graphics & No Smoking Vinyl
Dimensions
Approx. 1'-0" W
Fabrication
Cut translucent vinyl applied to second-
surface (interior surface) of glass.
Vinyl: V1, V2
Content
Owner to provide hours of operation and
conrm nal content.
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
30
PROJECT DESIGNERS
Page Southerland Page, Inc
NOTES
1'-0"
1'-10"
5'-0" AFF
Reserved
Parking
Van Accessible
Reserved
Parking
Loading
Dock
Authorized
Vehicles Only
Pick-up
and
Drop-off
No Parking
Authorized
Vehicles
Only
Electric
Vehicle
Parking
1 Typical Elevation
Scale: 3/4" = 1'-0"2 Elevation Detail
Scale: 1 1/2" = 1'-0"3 Section
Scale: 1 1/2" = 1'-0"
Reserved
Parking
Van Accessible
Sign Types 140, 150, & 151 Vehicular Parking & Regulatory Signage
Dimensions
1'-0" W x 1'-10" H Sign Panel
2" DIA Sign Pole
Fabrication
1/8" aluminum panel and back plate painted
on all sides with silkscreened graphics;
mounted to 2" DIA painted pole with capped
top; panels to extend 1/2" above top of
pole. Back plate mounted to sign pole with
counter-sunk fasteners. Sign panel mounted
to back plate with thin VHB tape and silicone
adhesive to hide fasteners; minimal seam
between panels.
Sign Pole Color: C2
Sign Panel & Backplate Color: C3
Graphic & Messaging Color: C1
All exterior pole-mounted signs to receive
UV-resistant clear coat in satin nish. Any
required exposed mounting plate at base of
sign to be painted to match pole.
For signs regulated by local, state, or federal
level codes or regulations, Sign Contractor
to produce sign panel per governing code
or regulations and use pole details per Civil
Engineer drawings.
Coordination
Engineered below grade foundation; see
plan details for base conditions and typical
installation diagrams for structural and
foundation details. Sign Contractor to survey
sign locations to determine appropriate
mounting method.
Sign locations per Civil Engineer drawings;
refer to C-310 and C-302 for details
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
31
PROJECT DESIGNERS
Page Southerland Page, Inc
Note:
Per Owner input, additional signs will be
added in parking area that display the
City's "prohibited handguns" policy.
NOTES
Detail A
Pole located in paving area, ush with
subsurface structure, with pavers over pier.
Detail B
Pole located on concrete surface, ush with
nal elevation.
Detail C
Pole located in planting area.
Expansion joint specications are to match
current Landscape specications.
Sign locations per Civil Engineer drawings;
refer to C-310 and C-302 for details
Sign locations may be adjusted in eld based
on actual paver layout.
Signs to align to paver joints, hardscape
expansion joints and major Landscape
elements as available.
Typical Pole Installation Diagrams
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
32
PROJECT DESIGNERS
Page Southerland Page, Inc
sidewalk/flatwork surface
galvanized steel mounting
plate attached to concrete
with deep epoxy anchors;
grind anchors flush to mounting
nuts; paint plate and anchors
to match pole
continuous concrete surface
with no high/low spots
paver substrate
paver surface
engineered below
grade foundation
pole flush to
paver surface
continuous paver surface
with no high/low spots
engineered below
grade foundation
engineered below grade
foundation; top to be flush
to area flatwork finished grade
B C
finished grade
sign pole
sign pole
escutcheon cover plate
A
sign pole
Note:
Structural engineer to review footings
and substructure for all signs
Series 100
Graphic Layouts
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
33
PROJECT DESIGNERS
Page Southerland Page, Inc
Measurements Color Key
3/4"
1"
3"
11"
Build View Layout Diagram
1937 Courtyard Entrance
Mon–Fri 10:00 AM–6 PM
Saturday 10:30 AM–9 PM
Sunday CLOSED
1937 Courtyard Entrance
Mon–Fri 10:00 AM–6 PM
Saturday 10:30 AM–9 PM
Sunday CLOSED
NOTES
Dimensions
Approximately 1'-0" W
Sign Content
Content and sign layout shown for illustrative
purposes only. Refer to message schedule
for exact messaging and location specic
information. Typesetting is detailed in the
General Requirements.
Margins and Spacing
See Measurement Color Guides for margins
and type spacing.
Colors
Logo – V1 & V2
Text – V1
Fabrication
Refer to Sign Type Sheet for additional
details.
Sign Type 131 Entrance Graphics
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
34
PROJECT DESIGNERS
Page Southerland Page, Inc
Measurements Color Key
7/16"
5/8"
1"
3 1/2"
Build View Layout Diagram
No smoking within 25 feet of building
entrances, exits, and operable windows.
No smoking within 25 feet of building
entrances, exits, and operable windows.
NOTES
Dimensions
Approximately 11" W
Sign Content
Content and sign layout shown for illustrative
purposes only. Refer to message schedule
for exact messaging and location specic
information. Typesetting is detailed in the
General Requirements.
Leading maintains a ratio of 120% of font
size.
Margins and Spacing
See Measurement Color Guides for margins
and type spacing.
Colors
Logo – V1
Text – V1
Fabrication
Refer to Sign Type Sheet for additional
details.
Sign Type 132 No Smoking Vinyl
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
35
PROJECT DESIGNERS
Page Southerland Page, Inc
Measurements Color Key
1/2"
1"
1 1/4"
1 3/4"
Build View Layout Diagram
Loading
Dock
Authorized
Vehicles Only
Loading
Dock
Authorized
Vehicles Only
NOTES
Dimensions
1'-0" W x 1'-10" H Sign Panel
Sign Content
Content and sign layout shown for illustrative
purposes only. Refer to message schedule
for exact messaging and location specic
information. Typesetting is detailed in the
General Requirements.
Margins and Spacing
See Measurement Color Guides for margins
and type spacing.
Colors
Sign/Plaque – C3
Text – C1
Fabrication
Refer to Sign Type Sheet for additional
details.
Sign Type 140 Vehicular Regulatory Message
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
36
PROJECT DESIGNERS
Page Southerland Page, Inc
Build View Layout Diagram
Reserved
Parking
Van Accessible
Reserved
Parking
Van Accessible
Measurements Color Key
1"'
1 1/4"
1 3/4"
7"
NOTESSign Type 150 Accessible Parking ID
Dimensions
1'-0" W x 1'-10" H Sign Panel
Sign Content
Content and sign layout shown for illustrative
purposes only. Refer to message schedule
for exact messaging and location specic
information. Typesetting is detailed in the
General Requirements.
Margins and Spacing
See Measurement Color Guides for margins
and type spacing.
Colors
Sign/Plaque – C3
Text – C1
Fabrication
Refer to Sign Type Sheet for additional
details.
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
37
PROJECT DESIGNERS
Page Southerland Page, Inc
1 1/4"
1 3/4"
3 3/4"
5 3/8"
Measurements Color Key
Build View Layout Diagram
Electric
Vehicle
Parking
Electric
Vehicle
Parking
NOTESSign Type 151 Parking ID, Other
Dimensions
1'-0" W x 1'-10" H Sign Panel
Sign Content
Content and sign layout shown for illustrative
purposes only. Refer to message schedule
for exact messaging and location specic
information. Typesetting is detailed in the
General Requirements.
Margins and Spacing
See Measurement Color Guides for margins
and type spacing.
Colors
Sign/Plaque – C3
Text – C1
Fabrication
Refer to Sign Type Sheet for additional
details.
*Not in current scope of work
PROJECT
Arkansas Museum of Fine Arts
LITTLE ROCK, ARKANSAS
DATE
18 February 2021
PAGE
38
PROJECT DESIGNERS
Page Southerland Page, Inc
4LZZHNL:JOLK\SL
(YRHUZHZ(Y[Z*LU[LY)HZL)\PSKPUN:PNUHNL
56;-69*65:;9<*;065
)HZL)\PSKPUN
:PNU
3VJH[PVU 3L]LS +LZJYPW[PVU 4LZZHNL:PNU;`WL 5V[LZ
+V5V[,U[LY :PNUSVJH[PVUWLY*P]PS=LOPJ\SHY9LN\SH[VY`:P[L7SHU
9LZLY]LK7HYRPUN
BHJJLZZPIPSP[`Z`TIVSD
:PNUSVJH[PVUWLY*P]PS(JJLZZPISL7HYRPUN0+:P[L7SHU
9LZLY]LK7HYRPUN
BHJJLZZPIPSP[`Z`TIVSD
:PNUSVJH[PVUWLY*P]PS(JJLZZPISL7HYRPUN0+:P[L7SHU
7PJR\WHUK+YVWVMM
5V7HYRPUN
=LOPJ\SHY9LN\SH[VY`:P[L7SHU
(\[OVYPaLK=LOPJSLZ6US`=LOPJ\SHY9LN\SH[VY`:P[L7SHU
3VHKPUN+VJR
(\[OVYPaLK=LOPJSLZ6US`
=LOPJ\SHY9LN\SH[VY`:P[L7SHU
)\PSKPUN(KKYLZZ:P[L7SHU
9LMLY[VKLZPNUSH`V\[
MVYJVU[LU[
,U[YHUJL.YHWOPJZ:P[L7SHU
UVZTVRPUNPJVU
UVVWLUJHYY`PJVU
5VZTVRPUN^P[OPUMLL[VMI\PSKPUN
LU[YHUJLZL_P[ZHUKVWLYHISL
^PUKV^Z
0UJ\SZPVUVMVWLUJHYY`
PJVU[VILJVUMPYTLKI`
JSPLU[
5V:TVRPUN=PU`S:P[L7SHU
+V5V[)SVJR=LOPJ\SHY9LN\SH[VY`:P[L7SHU
9LZLY]LK7HYRPUN
HJJLZZPIPSP[`Z`TIVS
:PNUSVJH[PVUWLY*P]PS(JJLZZPISL7HYRPUN0+:P[L7SHU
9LZLY]LK7HYRPUN
HJJLZZPIPSP[`Z`TIVS
:PNUSVJH[PVUWLY*P]PS(JJLZZPISL7HYRPUN0+:P[L7SHU
9LZLY]LK7HYRPUN
HJJLZZPIPSP[`Z`TIVS
:PNUSVJH[PVUWLY*P]PS(JJLZZPISL7HYRPUN0+:P[L7SHU
9LZLY]LK7HYRPUN
=HU(JJLZZPISL
HJJLZZPIPSP[`Z`TIVS
:PNUSVJH[PVUWLY*P]PS(JJLZZPISL7HYRPUN0+:P[L7SHU
9LZLY]LK7HYRPUN
=HU(JJLZZPISL
HJJLZZPIPSP[`Z`TIVS
:PNUSVJH[PVUWLY*P]PS(JJLZZPISL7HYRPUN0+:P[L7SHU
9LZLY]LK7HYRPUN
=HU(JJLZZPISL
HJJLZZPIPSP[`Z`TIVS
:PNUSVJH[PVUWLY*P]PS(JJLZZPISL7HYRPUN0+:P[L7SHU
9LZLY]LK7HYRPUN
=HU(JJLZZPISL
HJJLZZPIPSP[`Z`TIVS
:PNUSVJH[PVUWLY*P]PS(JJLZZPISL7HYRPUN0+:P[L7SHU
9LZLY]LK7HYRPUN
=HU(JJLZZPISL
HJJLZZPIPSP[`Z`TIVS
:PNUSVJH[PVUWLY*P]PS(JJLZZPISL7HYRPUN0+:P[L7SHU
9LZLY]LK7HYRPUN
=HU(JJLZZPISL
HJJLZZPIPSP[`Z`TIVS
:PNUSVJH[PVUWLY*P]PS(JJLZZPISL7HYRPUN0+:P[L7SHU
+V5V[,U[LY :PNUSVJH[PVUWLY*P]PS=LOPJ\SHY9LN\SH[VY`:P[L7SHU
UVZTVRPUNPJVU
UVVWLUJHYY`PJVU
5VZTVRPUN^P[OPUMLL[VMI\PSKPUN
LU[YHUJLZL_P[ZHUKVWLYHISL
^PUKV^Z
0UJ\SZPVUVMVWLUJHYY`
PJVU[VILJVUMPYTLKI`
JSPLU[
5V:TVRPUN=PU`S:P[L7SHU
7HNLVM
4LZZHNL:JOLK\SL
(YRHUZHZ(Y[Z*LU[LY)HZL)\PSKPUN:PNUHNL
56;-69*65:;9<*;065
)HZL)\PSKPUN
:PNU
3VJH[PVU 3L]LS +LZJYPW[PVU 4LZZHNL:PNU;`WL 5V[LZ
9LMLY[VKLZPNUSH`V\[
MVYJVU[LU[
,U[YHUJL.YHWOPJZ:P[L7SHU
7PJR\WHUK+YVWVMM
5V7HYRPUN
=LOPJ\SHY9LN\SH[VY`:P[L7SHU
,_P[\W[V33:[HPY,_P[+PYLJ[PVUHS)HZLTLU[
Z[HPYZ`TIVS
,_P[:[HPY?
BIYHPSSLD
:[HPY0+[VILJVUMPYTLK:[HPY0+6JJ\WHUJ`:PKL)HZLTLU[
,_P[
BIYHPSSLD
,_P[0+3V^LY3L]LS
BIYHPSSLD
2PSU9VVT
9VVT0+^P[O5HTL
:WLJPHS[`
3V^LY3L]LS
BIYHPSSLD
9VVT0+3V^LY3L]LS
BIYHPSSLD
9VVT0+3V^LY3L]LS
BIYHPSSLD
(Y[:[\KPV
9VVT0+^P[O5HTL3V^LY3L]LS
BIYHPSSLD
9VVT0+3V^LY3L]LS
BIYHPSSLD
*LYHTPJZ:[\KPV
9VVT0+^P[O5HTL
:WLJPHS[`
3V^LY3L]LS
BIYHPSSLD
4L[HSZ:[\KPV
9VVT0+^P[O5HTL
:WLJPHS[`
3V^LY3L]LS
BIYHPSSLD
.SHZZ:[\KPV
9VVT0+^P[O5HTL
:WLJPHS[`
3V^LY3L]LS
BIYHPSSLD
:[\KPV
9VVT0+^P[O5HTL3V^LY3L]LS
BIYHPSSLD
,SLJ[YPJHS
9VVT0+^P[O5HTL3V^LY3L]LS
7HNLVM
4LZZHNL:JOLK\SL
(YRHUZHZ(Y[Z*LU[LY,_WLYPLU[PHS.YHWOPJZ:PNUHNL
56;-69*65:;9<*;065
,_WLYPLU[PHS.YHWOPJZ
:PNU
3VJH[PVU 3L]LS +LZJYPW[PVU 4LZZHNL:PNU;`WL 5V[LZ
-YLLZ[HUKPUN)HUULY:P[L7SHU
-YLLZ[HUKPUN)HUULY:P[L7SHU
-YLLZ[HUKPUN)HUULY:P[L7SHU
(YRHUZHZ4\ZL\TVM-PUL(Y[Z +V\ISLZPKLKZPNU7YPTHY`4VU\TLU[0+:P[L7SHU
(KKP[PVUHS^H`MPUPKUN
MVY*YLZJLU[3H^U;)+
>H`MPUKPUN+PYLJ[PVUHS:P[L7SHU
;)+>H`MPUKPUN+PYLJ[PVUHS:P[L7SHU
*V\Y[`HYK,U[YHUJL 6^ULY[VJVUMPYTKVUVY
UHTL
*V\Y[`HYK(YYP]HS0+:P[L7SHU
BUVY[OZPKLD
\WHYYV^
7HYRPUN
SLM[HYYV^
3VHKPUN+VJR
BZV\[OZPKLD
YPNO[HYYV^
3VHKPUN+VJR
>H`MPUKPUN+PYLJ[PVUHS:P[L7SHU
;)+>H`MPUKPUN+PYLJ[PVUHS:P[L7SHU
7HYR,U[YHUJL 6^ULY[VJVUMPYTKVUVY
UHTL
;LYYHJL(YYP]HS0+:P[L7SHU
BUVY[OZPKLD
\WHYYV^
7PJR\WHUK+YVWVMM
SLM[HYYV^
7HYRPUN
BZV\[OZPKLD
YPNO[HYYV^
7HYRPUN
>H`MPUKPUN+PYLJ[PVUHS:P[L7SHU
;)+>H`MPUKPUN+PYLJ[PVUHS:P[L7SHU
;)+>H`MPUKPUN+PYLJ[PVUHS:P[L7SHU
(YRHUZHZ4\ZL\TVM-PUL(Y[Z +V\ISLZPKLKZPNU:LJVUKHY`4VU\TLU[0+:P[L7SHU
\WHYYV^
7PJR\WHUK+YVWVMM
SLM[HYYV^
7HYRPUN
>H`MPUKPUN+PYLJ[PVUHS:P[L7SHU
.9(5+;6;(3
7HNLVM