Loading...
HomeMy WebLinkAboutA3.1 INT ELEV.PC9BASEMENT EAST - HVAC 1/4" = 1'-0"BASEMENT WEST - BREAK ROOM 1/4" = 1'-0"1 2 3 4 5 6 Drawing Property of Heiple+Wiedower Architects PLLC 2017c A3.1 Date: 7/12/17 Heiple+Wiedower Architects 319 President Clinton Ave. Ste. 201 Little Rock, AR PH:501-707-0115 INT. ELEVATIONS & DETAILS Little Rock, Arkansas INFRASTRUCTURE UPGRADES 2017 RENOVATIONS MACARTHUR MUSEUM OF ARKANSAS MILITARY HISTORY P.O. Box 242523 Little Rock, AR ( t ) 501-372-6927 W.H. Grant & Assocs, Inc. Engrs8 9 7 PREPARE & PAINT EXISTING RAILING IN PLACE - EXCEPT WHERE NOTED TO BE REPLACED. REPLACEMENT MATERIAL TO BE TREATED WOOD - PAINT WHEN CURED INSPECT TERMITE SHIELD REMOVE & REPLACE PORCH DECKING WITH TREATED T&G WOOD- PAINT WHEN CURED INSTALL TR. WD. SHIMS AT BACK OF PORCH TO PROVIDE MIN. 1/8" /FOOT SLOPE ON PORCH SECTION @ BACK PORCH 1" = 1'-0" REMOVE, PREPARE, PAINT & REINSTALL EXISTING DOWNSPOUT 8'-0" LIMESTONE TO REMAIN 10 AFTER FLOORING REMOVAL INSPECT ALL FRAMING & NOTIFY ENGINEER OF ALL CONDITIONS NEW CONCRETE GRADE BEAM - 4" X 12" EXTERIOR GRADE REMOVABLE LATTICE PANELS ADJACENT TO HVAC EQUIPMENT BRICK COLUMN BEYOND TAMPERPROOF REMOVABLE SET SCREWS ATTACHING PANELS TO FRAME TAMPERPROOF REMOVABLE SET SCREWS ATTACHING PANELS TO FRAME HW16-708 HWH CABINET SPRINKLER PIPING MASONRY WALL EXISTING WDW TO BE REMOVED & REPLACED W/DUCT & WALL AROUND RETURN DUCT PHONE BOARD WATER HEATER & ENCLOSURE TO BE REMOVED SUPPLY DUCT EXISTING WDW TO BE REMOVED & REPLACED W/DUCT & WALL AROUND RETURN DUCT SUPPLY DUCT FIRST FLOOR WEST GALLERY 1/4" = 1'-0" FIRST FLOOR EAST GALLERY 1/4" = 1'-0" EXISTING GYP. BD. CHASE TO BE REMOVEDNEW MTL. STUD & GYP. BD. MECH. CHASE ADD WOOD BASE TO MATCH EXISTING @ NEW CHASE REMOVE EXISTING GYP. BD., FURR DOWNS & PATCH PERIMETER NEW MTL. STUD & GYP. BD. MECH. CHASE ADD WOOD BASE TO MATCH EXISTING @ NEW CHASE - SALVAGE WHEN POSSIBLE EXIST'G WOOD WINDOW TO REMAIN EXIST'G WOOD WINDOW TO REMAIN PAINT WOOD TRIM AROUND WINDOW PAINT WOOD TRIM AROUND WINDOW SPRINKLER PIPING SECOND FLOOR EAST GALLERY 1/4" = 1'-0"SECOND FLOOR WEST GALLERY 1/4" = 1'-0" NEW MTL. STUD & GYP. BD. MECH. CHASE ADD WOOD BASE TO MATCH EXISTING @ NEW CHASE - SALVAGE WHEN POSSIBLE PAINT WOOD TRIM AROUND WINDOW EXIST'G WOOD WINDOW TO REMAIN EXIST'G WOOD WINDOW TO REMAIN REMOVE EXISTING GYP. BD., FURR DOWNS & PATCH PERIMETER ADD WOOD BASE TO MATCH EXISTING @ NEW CHASE - SALVAGE WHEN POSSIBLE NEW MTL. STUD & GYP. BD. MECH. CHASE REMOVE EXISTING GYP. BD., FURR DOWNS & PATCH PERIMETER PAINT WOOD TRIM AROUND WINDOW 6'-0"4'-0" GATE PROVIDE CHAIN LINK FENCE HINGES FOR GATE PROVIDE CHAIN LINK GATE LATCH W/PROVISION FOR OWNER FURNISHED PAD LOCK CONCRETE POST GALV. STEEL GATE FRAME 2X6 TREATED 2 X 6 W/ IPE TRIM TOP, BOTTOM SIDES & CENTER 1X4 IPE @ 4" O.C. FASTENED TO STL. GATE VERT. 1X4 6" CONCRETE POST 6' TALL SCREEN MATERIAL MOUNTED TO POSTS 4" CONCRETE SLAB W/ WWF AROUND EQUIPMENT PAD 6" CONCRETE PAD FOR HVAC EQUIPMENTFINISH GRADE #3 REBARS EACH WAY #3 REBAR @ 12" O.C. EACH WAY 1'-0"1'-6"GATE ELEVATION 3/4" = 1'-0" SECTION @ CONDENSING UNIT 3/4" = 1'-0" CONDENSING UNIT CONDENSER YARD 1/4" = 1'-0"3'-0"3'-1 1/4"1"1" 1"3'-1 1/4"1"7'-2"1"1"7'-0" 1"1"3'-1 1/4"1"7'-2"1"1"3'-1 1/4"1"3'-0"3"8'-6"8'-6"8'-6"4'-6"3"3"4'-6"4'-6"3"26'-0"14'-0"96" GREENSCREEN PANEL FASTENED TO 6" CONCRETE FENCE POST 48" GREENSCREEN PANEL FASTENED TO 6" CONCRETE FENCE POST 48" GREENSCREEN PANEL FASTENED TO 6" CONCRETE FENCE POST 6"X6" CONCRETE FENCE POST -SEE 9/A3.1 96" GREENSCREEN PANEL FASTENED TO 6" CONCRETE FENCE POST 2'-8 1/2"5'-9"5'-9"2'-8 1/2"2X6 TREATED 2 X 6 W/ IPE TRIM TOP & BOTTOM 2X6 TREATED 2 X 6 W/ IPE TRIM TOP, BOTTOM SIDES & CENTER 1X4 IPE @ 4" O.C. CONC. FOOTING UNDER EQUIPMENT & SIDEWALK UNDER REST OF ENCLOSURE SEE DTL. 9/A3.1FOR FOOTING INFORMATION