HomeMy WebLinkAboutA3.1 INT ELEV.PC9BASEMENT EAST - HVAC
1/4" = 1'-0"BASEMENT WEST - BREAK ROOM
1/4" = 1'-0"1 2
3 4
5 6
Drawing Property of Heiple+Wiedower Architects PLLC 2017c A3.1
Date: 7/12/17
Heiple+Wiedower Architects
319 President Clinton Ave. Ste. 201 Little Rock, AR
PH:501-707-0115
INT. ELEVATIONS &
DETAILS
Little Rock, Arkansas
INFRASTRUCTURE
UPGRADES
2017 RENOVATIONS
MACARTHUR MUSEUM
OF ARKANSAS
MILITARY HISTORY
P.O. Box 242523 Little Rock, AR
( t ) 501-372-6927
W.H. Grant & Assocs, Inc. Engrs8
9
7
PREPARE & PAINT EXISTING RAILING IN
PLACE - EXCEPT WHERE NOTED TO BE
REPLACED. REPLACEMENT MATERIAL TO
BE TREATED WOOD - PAINT WHEN CURED
INSPECT TERMITE SHIELD
REMOVE & REPLACE PORCH DECKING
WITH TREATED T&G WOOD- PAINT WHEN
CURED
INSTALL TR. WD. SHIMS AT BACK OF
PORCH TO PROVIDE MIN. 1/8" /FOOT
SLOPE ON PORCH
SECTION @ BACK PORCH
1" = 1'-0"
REMOVE, PREPARE, PAINT & REINSTALL
EXISTING DOWNSPOUT
8'-0"
LIMESTONE
TO REMAIN
10
AFTER FLOORING REMOVAL
INSPECT ALL FRAMING &
NOTIFY ENGINEER OF ALL
CONDITIONS
NEW CONCRETE
GRADE
BEAM - 4" X 12"
EXTERIOR GRADE
REMOVABLE LATTICE
PANELS ADJACENT TO
HVAC EQUIPMENT
BRICK COLUMN
BEYOND
TAMPERPROOF
REMOVABLE SET
SCREWS ATTACHING
PANELS TO FRAME
TAMPERPROOF
REMOVABLE SET
SCREWS ATTACHING
PANELS TO FRAME
HW16-708
HWH
CABINET
SPRINKLER PIPING
MASONRY WALL
EXISTING WDW TO BE
REMOVED & REPLACED
W/DUCT & WALL AROUND
RETURN
DUCT
PHONE
BOARD
WATER HEATER &
ENCLOSURE TO
BE REMOVED
SUPPLY DUCT
EXISTING WDW TO BE
REMOVED & REPLACED
W/DUCT & WALL AROUND
RETURN DUCT
SUPPLY DUCT
FIRST FLOOR WEST GALLERY
1/4" = 1'-0"
FIRST FLOOR EAST GALLERY
1/4" = 1'-0"
EXISTING GYP. BD. CHASE
TO BE REMOVEDNEW MTL. STUD &
GYP. BD. MECH.
CHASE
ADD WOOD BASE TO MATCH
EXISTING @ NEW CHASE
REMOVE EXISTING GYP. BD.,
FURR DOWNS & PATCH
PERIMETER
NEW MTL. STUD &
GYP. BD. MECH.
CHASE
ADD WOOD BASE TO
MATCH EXISTING @
NEW CHASE - SALVAGE
WHEN POSSIBLE
EXIST'G WOOD
WINDOW TO REMAIN
EXIST'G WOOD
WINDOW TO REMAIN
PAINT WOOD TRIM
AROUND WINDOW
PAINT WOOD TRIM
AROUND WINDOW
SPRINKLER PIPING
SECOND FLOOR EAST GALLERY
1/4" = 1'-0"SECOND FLOOR WEST GALLERY
1/4" = 1'-0"
NEW MTL. STUD &
GYP. BD. MECH.
CHASE
ADD WOOD BASE TO
MATCH EXISTING @
NEW CHASE - SALVAGE
WHEN POSSIBLE
PAINT WOOD TRIM
AROUND WINDOW
EXIST'G WOOD
WINDOW TO REMAIN EXIST'G WOOD
WINDOW TO REMAIN
REMOVE EXISTING GYP. BD.,
FURR DOWNS & PATCH
PERIMETER
ADD WOOD BASE TO
MATCH EXISTING @
NEW CHASE - SALVAGE
WHEN POSSIBLE
NEW MTL. STUD &
GYP. BD. MECH.
CHASE
REMOVE EXISTING GYP. BD.,
FURR DOWNS & PATCH
PERIMETER PAINT WOOD TRIM
AROUND WINDOW
6'-0"4'-0" GATE
PROVIDE CHAIN LINK FENCE
HINGES FOR GATE
PROVIDE CHAIN
LINK GATE LATCH
W/PROVISION FOR
OWNER FURNISHED
PAD LOCK
CONCRETE POST
GALV. STEEL
GATE FRAME 2X6 TREATED 2 X 6
W/ IPE TRIM TOP, BOTTOM
SIDES & CENTER
1X4 IPE @ 4" O.C. FASTENED TO STL.
GATE
VERT. 1X4
6" CONCRETE POST
6' TALL
SCREEN MATERIAL MOUNTED
TO POSTS
4" CONCRETE SLAB W/
WWF AROUND
EQUIPMENT PAD
6" CONCRETE PAD
FOR HVAC EQUIPMENTFINISH GRADE
#3 REBARS
EACH WAY
#3 REBAR @ 12" O.C.
EACH WAY
1'-0"1'-6"GATE ELEVATION
3/4" = 1'-0"
SECTION @ CONDENSING UNIT
3/4" = 1'-0"
CONDENSING
UNIT
CONDENSER YARD
1/4" = 1'-0"3'-0"3'-1 1/4"1"1"
1"3'-1 1/4"1"7'-2"1"1"7'-0"
1"1"3'-1 1/4"1"7'-2"1"1"3'-1 1/4"1"3'-0"3"8'-6"8'-6"8'-6"4'-6"3"3"4'-6"4'-6"3"26'-0"14'-0"96" GREENSCREEN PANEL FASTENED
TO 6" CONCRETE FENCE POST
48" GREENSCREEN
PANEL FASTENED
TO 6" CONCRETE
FENCE POST
48" GREENSCREEN
PANEL FASTENED
TO 6" CONCRETE
FENCE POST
6"X6" CONCRETE
FENCE POST -SEE
9/A3.1
96" GREENSCREEN PANEL FASTENED
TO 6" CONCRETE FENCE POST 2'-8 1/2"5'-9"5'-9"2'-8 1/2"2X6 TREATED 2 X 6
W/ IPE TRIM TOP & BOTTOM
2X6 TREATED 2 X 6
W/ IPE TRIM TOP, BOTTOM
SIDES & CENTER
1X4 IPE @ 4" O.C.
CONC. FOOTING UNDER
EQUIPMENT & SIDEWALK
UNDER REST OF ENCLOSURE
SEE DTL. 9/A3.1FOR FOOTING
INFORMATION