Loading...
HomeMy WebLinkAboutFASSLER HALL1 2 3 4 DEPARTMENT OF PLANNING AND DEVELOPMENT 723 West Markham Street Little Rock, Arkansas 72201-1334 Phone: (501) 371-4790 Fax:(501) 399-3435 www.littlerock.gov APPLICATION FOR A CERTIFICATE OF APPROPRIATENESS Application Date: {.0 lU Date of Public Hearin Address of Property: U r� Legal Description of Property: �U 5. Property Owner (Printed Name, Address, Phone, Email): C'_env\,a� QQ wcA�v (T, 11 CAcle ► I- 6. Owner's Agent: (Printed Name, Address, Phone, Email): HDC File # HA -K- t - 0 at 5:00 p.m. hr rYl !�vrev �aao1 7. Name f Applicant as it will appear on all correspondence and in Staff report: �Gm,�. MUSS 8. Brief Project Description: 9. Estimated Cost of Improvements:1b \1 3001 0L1�-� 10. Zoning Classification: Is the proposed change a permitted use? 11. Signature of Owner or Agent: --cc (The owner will need to authorize any Agent or person to represent them at the public hearing See page 5). Yes) No NOTE: Should there be changes during construction (design, materials, size, etc.) from the approved COA, applicant shall notify Commission staff and take appropriate actions. Approval by the Commission does not excuse applicant or property from compliance with other applicable codes, ordinances or policies of the city unless stated by the Commission or staff. Responsibility for identifying such codes, ordinances, or policies rests with the applicant, owner, or agent. (This section to be completed by staff): Little Rock Historic District Commission Action Denied _ Withdrawn _ Approved _ Approved with Conditions _ See Attached Conditions Staff Signature: Date: Page 1 of 5 Revised 12/2/2016 D Brief Project Description Description: The project consists of a 7,400 SF renovation of the first floor to the two-story Paragon Building at 311 E. Capitol Ave. in Little Rock, Arkansas for the purposes of a restaurant. The project also proposes a 6,400 SF exterior patio to the west to be access from new openings in the building, and to be fully fenced in from the street. Additional exterior improvements include painting the east, west, and south facades, and the attachment of metal letters on the north facade.