Loading...
HomeMy WebLinkAboutdraft checklist for little rockComplete Streets Checklist December 2, 2013 City of Little Rock Complete Streets Checklist The City of Little Rock will endeavor to plan for, design and construct all new City transportation improvement projects to provide appropriate accommodations for pedestrians, bicyclists, transit riders and persons of all abilities; while at the same time designing projects that promote safe, economical operation for all users. Complete Streets may be achieved through single projects or incrementally through a series of smaller improvements or maintenance activities over time. The checklist was developed to ensure City of Little Rock projects meet these goals and help to sort through potentially conflicting modal priorities. Project Name. Project Engineer: Project Manager: Classifications What is the Street Classification? ❑ Principal Arterial ❑ Minor Arterial ❑ Collector ❑ Local ❑ Minor Residential Average Daily Traffic (if available): Describe this project: Page 1 1 Complete Streets Checklist Sidewalk Maintenance Are existing sidewalks within the project area in good condition? ❑Yes ❑No If "no" will they be repaired as part of this project? ❑Yes ❑No If "no", is there a plan to repair sidewalks in the near future? ❑Yes ❑No On -Street Parking Does the project area include curb side parking? ❑Yes ❑No If "yes" describe accommodations for alternate travel modes conflicting with parking: Master Bike Plan Are there Master Bike Plan recommendations for the project area? ❑Yes ❑No Describe any recommendations NOT included in this projects and reason for deferral: Central Arkansas Transit Plan Are there Central Arkansas Transit Plan recommendations for bus stop configuration or facilities in the project area? ❑Yes ❑No Describe any recommendations NOT included in this projects and reason for deferral: Page 12 Complete Streets Checklist Streetscape Concept Plans Is there a Streetscape Concept Plan with recommendations for this project area? ❑Yes ❑No Describe any recommendations included in this project: Other Plans Have other significant plan(s) been completed within the project area (e.g. Neighborhood, City or Federal Projects) ❑Yes ❑No Describe any recommendations included in this project: Exceptions In the following unusual or extraordinary circumstances, Complete Streets principles will not apply: 1) accommodation is not necessary on corridors where non -motorized use is prohibited; 2) cost of accommodation is excessively disproportionate to the need or probable use; 3) a documented absence of current or future need; 4) accommodation is not practical due to severe topological constraints. Is there a plan to implement Complete Streets principles incrementally through a series of smaller improvements or maintenance activities over time at the project location? Page 13 Complete Streets Checklist Does the Project Team recommend any exception to Complete Streets for this project? Bicycle / Pedestrian Coordinator Comments: Note: the Complete Streets Ordinance requires the Director of Public Works to issue a documented exception concluding that the application of Complete Streets principles is unnecessary or inappropriate because it would be contrary to public safety; or where other available means or factors indicate an absence of need, including future need. Public Works Director's Comments: Page 14