HomeMy WebLinkAboutordinance 16622ORDINANCES NO. 16,622
AN ORDINANCE TO AMEND THE MASTER STREET
PLAN, ADDING SEVERAL CROSS-SECTION DESIGNS
AND MAKING CHENAL/FINANCIAL CENTER PARKWAY
A PARKWAY CLASSIFICATION AND FOR OTHER
MATTERS.
WHEREAS, additional roadway cross-sections are needed to
better clarify the City's Street Plan; and,
WHEREAS, A street option with open ditches is desirable for
the outlining rural -suburban large lot developments; and,
WHEREAS, the standards for Chenal/Financial Center Parkway
need to be better defined and clarified.
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF DIRECTORS OF
THE CITY OF LITTLE ROCK, ARKANSAS.
SECTION 1. That the Master Street Plan text in the chapter
entitled "Design Standards" is amended to add the attached street
cross-sections: 1) Divided principal arterial (Parkway) Stage 1
and Stage 2; 2) Principal arterial - Stage 1 and Stage 2; 3)
Industrial street with open drainage; 4) Residential street with
open drainage; and 5) Minor Arterial - Urban Section.
SECTION 2. That the Master Street Plan text in the Chapter
entitled "Road Classifications" is amended to add the attached
text for Suburbal Residential and Principal Arterial -Parkway.
SECTION 3. That the Master Street Plan Text in the chapter
entitled "Functional Classification of Street System, Expressway"
is amended as follows:
Delete
Description From To
Chenal Parkway Cantrell Road I-430 Interchange
SECTION 4. That the Master Street Plan text in the chapter
entitled "Functional Classification of Street System, Principal
Arterial" is amended as follows:
Add
Description
Chenal Parkway
From
Cantrell Road
To
I-430 Interchange
0-7Z
JV -2-
SECTION 5. That the item in section 4 is footnoted to
require a 'Parkway' section with 6 lanes from Shackleford to
Ranis Road (West) and a 4 lane section North of Ranis Road to
Cantrell Road.
SECTION 6: That the Master Street Plan map is amended to
change Chenal/Financial Center Parkway from Expressway to
f Principal Arterial.
}
i
f
PASSED: march 15, 1994
ATTEST:
City Clerk Robbie Hancock
APPROVED:
in Dailey
S
18?
rr r� rr r r r
Q
S
2
r
188
3�
��
xCU cc
L 3 O
c 3
cr
dId
�w c13
C Oa
0
LL CL v
C
(D 0Y
m
wY
O��Z
'
4
UU
NOW 1 12' clear
zone no utili
110' RIGHT OF WAY
60' (5 LAMES) PAVEMENT
@12' ea.
k,
E
fit, y''w:,:'ar.:,•:;• r r e� .-, ; F::s-�::: �y'.:
PRINCIPAL. ARTERIAL
Stage 1 (initial) construction
110' RIGHT
;idewatx 84'(6LANES) P,
ity zone @12' ea.
PRINCIPAL ARTERIAL
stage 2 (final) construction
184
12' clear x229 l sidewalk
no utilities & utinly, zone
13' sidewalk
utility zon
07Z
D-5
J_-
4 -
cc4 -
cc
t
U
b
C
CO G
N m
a
W
>
c�
CL
185
J_-
4 -
cc4 -
cc
t
U
b
C
CO G
N m
a
O
W
>
c�
CL
m
N
O
3r
z
co
co
od
O
Q O
ccw..
c
0
,•s:titi•
Q O
t
co
w-00
:.:�:•
�y Al
D6P
LLJ
a 0
-
O
LO
F— `'!
fsr Li
z?i f�ti f.
U
�
•''
IfI
v/ DIY
"r 1r+y
J
:?ii; }•;
EC •E
i•�•'.Iya
O
>
c�
CL
m
N
O
3r
a
co
co
od
O
L
cl
O (�
c
0
GDW
t
co
w-00
D6P
r 186
10' R/W a 36' + 12' x ditch depth
utility (60' R/W minimum)
easement
(PROPOSED)
RESIDENTIAL STREET with open drainage
0 -72-
D
-72D 7
r r inn MM r r r r ■r r r rr r r
187
L•nP E3 11AJ
1
(PROPOSED)
1
MINOR ARTERIAL -- URBAN SECTION
(for redevelopment in existing urban area,
subject to approval of city engineer.)
City Engineer may require greater
width where conditions permit.