Wlater,
We'll rate them all Class 2 then. Once the BFCC stuff gets settled, I will send out the email you and I discussed
recommending that they be revised to Class 2 lanes. We'll incorporate feedback, then revise the plan and go.
Thanks for the help on this Walter.
Ed
edwin cromwell levy, ala, teed ap
director, architectural
elevy@cromwell.com
501.372.2900 w
501.960.6145 c
101 south spring street
little rock, ar 72201
From: "Malone, Walter" <WMalone@littlerock.org>
To: <ed.levy@cromwell.com>
Date: 05/12/2011 02:13 PM
Subject: RE: Class III on Arterials
I am just saying that if the reason for them not to be a Class III is either high speed or high volume then they
should all be changed. One if not both is true for these routes. A Class I would require more ROW and paving
and I thought the group was trying to get a system in place at lower costs.
So the best option if all of this is true is to either develop an alternate route that does the same thing on lower
volume/speed roads and/or to have the bike routes be class II.
Walter
-----Original Message -----
From: ed.levy@cromwell.com [mailt_o:ed_.lev_ cromwell.com]
Sent: Thursday, May 12, 2011 1:41 PM
To: Malone, Walter
Subject: RE: Class III on Arterials
For all of them?
5/16/2011
Page 2 of 3
Ed
edwin cromwell levy, aia, leed ap
director, architectural
elevy@cromwell.com
501.372.2900 w
501.960.6145 c
101 south spring street
little rock, ar 72201
From: "Malone, Walter" <WMalone@littlerock.org>
To: <ed.levy@cromwell.com>
Date: 05/11/2011 01:45 PM
Subject: RE: Class III on Arterials
If the issue for the change is either high speed of vehicles or high volume of vehicles then none should be Class
3. Class 1 would require additional ROW, therefore I would stay away from Class 1, if possible. Either an
alternate location (parallel) or Class 2 would be my suggestion.
Walter
-----Original Message -----
From: ed.levy@cromwell.com [mail o:e .leyy@cromweli.com]
Sent: Wednesday, May 11, 2011 1:17 PM
To: Malone, Walter
Subject: Re: Class III on Arterials
Walter,
There are a lot of these I am not familiar with. Can you make a recommendation as to which should be changed
to Class 1 and which to Class 2? Are any of them okay as a Class 3?
Ed
edwin cromwell levy, aia, teed ap
director, architectural
elevy@cromwell.com
501.372.2900 w
501.960.6145 c
101 south spring street
little rock, ar 72201
5/16/2011
Page 3 of 3
From: "Malone, Walter" <WMalone@littlerock.org>
To: "Ed Levy (E-mail)" <eclevy@cromwell.com>
Date: 05/03/2011 12:05 PM
Subject: Class III on Arterials
Ed, here is the list of Class III on Arterials (I might have missed one some place
but think it is complete).
<<CLASS III on Arterials.doc>>
Note that some are outside the City Limits (we can not sign out there but could ask
the county to sign them). If it is noted that the route is 'proposed to upgrade to
Class II', that means that the 'Implementation Plan' shows as Class II but the
Master Plan shows as a Class II. So should be upgraded at some point.
Walter
[attachment "CLASS III on Arterials.doc" deleted by Edwin C Levy/Cromwell]
5/16/2011
CLASS III on Arterials:
12th Street
36th Street
65th Street
65th Street
Alexander Road
Arch Street
Baseline Road
Bond
Bowman Road
Cantrell Road
Chester
Chenal Parkway
Chenonceau Blvd
Colonel Glenn Road
David O Dodd
Denny Road
Dixon Road
Ferndale Cut -Off Road
Forbing Road
Fourche Damn Pike
Frazier Pike
Geyer Springs Road
Hinson Road
John Barrow Road
La Harpe
Mabelvale Pike
Main Street
Markham/3`d Street
Markham
Harrison to Woodrow (proposed to upgraded to class II)
Shackleford Road to Colonel Glenn Road
University Avenue to Geyer Springs Road
Patterson to Arch Street Pike
Alexander to Sardis Road
Roosevelt Road to Baseline Road
Stagecoach Road to Arch Street Pike
6th Street to Frazier Pike
Mara Lynn to Lawson Road
Rodney Parham to City Limits (Ferndale Cut-off Road area)
La Harpe to 7`h Street
Chenonceau Blvd to Northfield
Cantrell Road to Chenal Parkway
36th Street to University Ave (proposed to upgraded to class II)
Lawson Road to Stagecoach Road
In City Limits (Kanis Road to Wildwood Lane area)
Springer to Arch Street Pike
Cantrell Road to Denny Road
University Avenue to Geyer Springs Road (to west is a Collector)
I-430 to Frazier Pike (north of I-430 is Collector)
Bond to Fourche Damn Pike
65th Street to Mitchell
Taylor Loop to Rodney Parham Road
Markham to 36th Street (proposed to upgraded to class II)
Chester to Markham
Baseline Road to Mabelvale
Daisy G. Bates to Roosevelt Road
Kavanaugh Blvd to World Avenue
Natural Resources Drive to Rodney Parham Road
Pinnacle Valley Road Cantrell Road to HWY 300 (proposed to upgraded to class II)
Rodney Parham Road Hinson Road to Mississippi
Rodney Parham Road Cantrell Road to Rocky Valley
Sardis Road Alexander Road to Mabelvale
Scott Hamilton/Hilaro Springs 65th Street to City Limits
Shackleford Road Mara Lynn to Executive Center Drive
Shackleford Road 36th Street to Stagecoach Road
Springer/Confederate Roosevelt Road to City Limits (to north is a collector)
Stagecoach Road I-430 to Shackleford Road
Stagecoach Road Otter Creek to County Line Road
(Is class II between now and all proposed to upgrade to Class II)
Thibault Fourche Damn Pike to Frazier Pike
University Avenue Colonel Glenn Road to 65th Street
Van Buren Woodlawn to Markham
World Avenue 3`d Street to terminus
Woodrow 12th Street to Daisy G Bates