Loading...
HomeMy WebLinkAboutmemo to board of directors on changesTO: FROM: Board of Directors Communication HONORABLE MAYOR AND BOARD OF DIRECTORS BRUCE T. MOORE, CITY MAMA SUBJECT: RAHLING ROAD CHANGES DATE: NOVEMBER '14, 2008 The request was made at the November 10, 2008, Board of Directors Agenda Meeting for staff to provide the following information regarding the proposed changes along Rahling Road and how it relates to the Chenal Parkway Architectural Review requirements: ➢ Traffic Count_ for Rahling Road: The City's most current traffic count for Rahling Road was conducted in March 2008, and depicts a volume of 8,539 vehicles per day. ➢ Date Pebble Beach Drive was Opened to Rahling Road: The construction of the final section of Pebble Beach Drive was completed in March 1998 and it was opened after that date. ➢ Permitted Height in the M_ F18 Zoning District: The permitted building height in MF18 is thirty-five (35) feet. ➢ Estimated Costs for Building the Two (2) Collectors as Currently Shown on the Master Street Plan: Staff has estimated that construction cost to complete Beckenham Drive from its western most end to Rahling Road is approximately $543,900. The estimated construction cost to complete the Wellington Plantation/Rahling Road connection is approximately $569,500. ➢ Date Beckenham Drive and Wellington Plantation Drive were added to the Master Street Plan: Beckenham Drive has been on the Master Street Plan since at least 1979. Wellington Plantation alignment was added to the Master Street Plan in 1988 as an arterial, and in 1997, the Master Street Plan was amended to the current collector alignment for Wellington Plantation Drive. Staff reports that the buffer requirement for multi -family zoned property adjacent to single family is 6% of the average depth, with a maximum of fifty (50) feet and 70% percent of the buffer is to be left undisturbed. Under the City of Little Rock, Arkansas applicant's proposed plan, all of the non -single family development on the 134 acre/tract will be subject to: 1. Chenal Valley Covenants and Restrictions 2. The Bill of Assurance of Chenal Valley Commercial Neighborhood 3. Design Guidelines-Chenal Valley Commercial Property 4. Review by Chenal Valley Architectural Control Committee The Chenal Valley Design guidelines address specific lot requirements, building requirements, colors and textures, mechanical equipment, paving materials and exterior lighting. The covenants, restrictions and guidelines are not enforced by the City; they are private conditions, regulated by the Chenal bill of assurance. The attached maps show the Dorado Beach connection to Hinson Road and the area that will remain R-2 Single Family if the requested re -zonings are approved. (The R-2 area within the 134 acres is cross -hatched.) During the discussion of the Master Street Plan item at the Board of Directors Agenda Meeting, staff was asked about how the collectors on the Master Street Plan would be constructed. Staff responded by saying that streets are typically constructed at the time of development through the Boundary Street Ordinance. With the request before the Board, the applicant, Deltic Timber Corporation made the following commitments at the Planning Commission Meeting to the street network: 1. Deltic will immediately begin the design for Beckenham Drive and Wellington Plantation Drive and will commence construction of both streets as soon as practically possible, allowing for all necessary governmental approvals. 2. Deltic will contribute up to $325,000 for construction of the portion of Beckenham Drive outside of the subject property upon conditions that: (a) The City acquire the right-of-way for that portion of the street; and (b) The City cooperate with Deltic in the design and approval of Beckenham Drive such that construction of the entire street and related infrastructure may be accomplished as part of a single project thus achieving cost savings through the design, engineering and simultaneous construction of the entire street and related infrastructure. There is a portion of Beckenhan Drive to the east of the property in question that has not been constructed. The $325,000 should cover the cost of a two (2) -lane roadway, which will not include full improvements. 3. To include as part of the Master Street Plan, construction and installation of traffic signals at the intersection of Beckenham Drive/Wellington Plantation Drives and Rahling Road. The commitments made by the applicant are subject to the approval of the Master Street Plan Amendment, Land Use Plan Amendment and the re -zonings by the Board of Directors. On Wednesday, November 12, 2008, Planning & Development Staff received the attached amended application from the applicant. Staff has determined that this amendment is a substantial change to the application and should be referred back to the Planning Commission if the applicant moves forward with the amended application. If additional information is needed, please advise. Attachments Z -8165-A 41 PROP. REZONING OEAST SIDE OF RAKING RD.(I-) F7 Vicinity Map Master Street Plan Admendment Case: MSP -08-01 N Location: Wellington Plantation Dr. Ward: 5 PD: 19 0 450 900 1,800 Feet CT: 42.10 TRS: T2N R13W30