Loading...
HomeMy WebLinkAboutemail Covington Minyard on traffic countsMinyard, Brian From: Minyard, Brian Sent: Tuesday, October 16, 2007 11:28 AM To: 'Casey Covington' Subject: RE: 2030 traffic numbers thanks for your quick response. Brian Minyard, AICP bminyard@littlerock.org (501) 371-4789 fax (501) 399-3435 -----Original Message-=-=- From: Casey Covington [mailto:covington@metroplan.org] Sent: Tuesday, October 16, 2007 10:54 AM To: Minyard, Brian Cc: Richard Magee Subject: RE: 2030 traffic numbers Brian Below are traffic forecast for University from Cantrell to Asher/Colonel Glenn. These volumes reflect the METRO 2030 constrained plan which includes the widening of University to 6 through lanes from Asher/Colonel Glenn to Markham. No other major widening in the vicinity. Existing volumes are based on AHTD annual traffic counts. Similar to existing volumes, forecast volumes are lowest near Cantrell and increase to a peak near I-630. University Traffic Volumes: Cantrell to Evergreen 2007 - 17,000 Evergreen to Markham 2007 - 20,000 to 25,000 38,000 Markham to I-630 2007 - 35,000 to 40,000 50,000 I-630 to UALR 2007 - 40,000 to 35,000 to 45,000 UALR to Asher 2007 - 32,000 Call me if you have any questions. Casey R. Covington Transportation Engineer Metroplan - A Council of Local Governments 501 West Markham - Suite B Little Rock, AR 72201 Phone: (501) 372-3300 Fax: (501) 372-8060 -----Original Message ----- From: Minyard, Brian [mailto:BMinyard@littlerock.org] Sent: Tuesday, October 16, 2007 9:52 AM To: covington@metroplan.org Subject: 2030 traffic numbers 2030 - 25,000 2030 - 25,000 to 2030 - 40,000 to 2030 - 50,000 2030 - 40,000 please send me the projected traffic numbers for the entirety of university avenue, in Little rock. Per our phone conversation, pleas use the assumptions that were used in the formulation of the plan that was published. Please break the numbers down into segments as published. 1 thanks Brian Minyard, AICP bminyard@littlerock.org (501) 371-4789 fax (501) 399-3435