Loading...
HomeMy WebLinkAboutemail Henry on traffic studyMessage Malone, Walter From: Henry, Bill Sent: Friday, April 07, 2006 2:09 PM To: Malone, Walter; Hood, Mike; Banihatti, Nat; Beck, Steve; Floriani, Vince Cc: epeters777@traffic-engineers.com Subject: Kirk Road, Chenal, Rahling and Wellington Hills Rd Traffic Study Page 1 of 1 We have reviewed the traffic study for the above referenced locations and have no issues as submitted. The model however will be reduced to show Chenal Parkway being 2 -lanes in each direction East of Kanis and West of the Western Kanis intersection. Any dual right turn lanes were removed from the model. I have attached the proposed layout per the study with the modification mentioned above. Please give me a call if you have any questions concerning our review. William Henry, P.E. Traffic Engineering Manager City of Little Rock Public Works 621 S. Broadway Little Rock, AR 72201 Phone: 501-379-1816 Fax: 501-340-4853 4/7/2006