Loading...
HomeMy WebLinkAbouttraffic studyTraffic Study Kanis Road Master Street Plan Issue prepared for: WHISENHUNT INVESTMENTS PETERS & ASSOCIATES ENGINEERS, INC • CIVIL & TRAFFIC ENGINEERING • P.O. BOX 21638 (501) 225-0500 LITTLE ROCK, ARKANSAS 72221 Kanis Road Chenal Parkway Wellington Hills Road Little Rock, Arkansas ARItANSAS�� REGISTERED PROFESSIONAL ENGINEER ERNEST J. PETERS No. 4682 J Project No.: P-943 May 19, 2004 Project No. P943 May 18, 2004 Chenal Parkway -- Kanis Road -- Wellington Hills Road Traffic Operations Study Findings of the study are summarized as follows: • The AM peak hour of the adjacent street (7:15 AM — 8:15 AM) and the PM peak hour of the adjacent street (4:30 PM — 5:30 PM) have been determined to be the traffic conditions in the vicinity that warrant traffic operational analysis. • Projected traffic conditions include projected traffic generated by a variety of development in the vicinity of Chenal Parkway, Kanis Road and Wellington Hills Road plus existing traffic volumes with a 10 -year growth factor included for two different alignments of the planned Wellington Hills Road extension. This 10 -year growth factor, plus the directional distribution of development generated traffic in the vicinity of the study area have been discussed and decided upon by the City in conjunction with this consultant. The following three intersections in the study area were analyzed as a part of this study: o Chenal Parkway and Kanis Road. o Chenal Parkway and Wellington Hills Road. o Kanis Road and Wellington Hills Road extension. Capacity and LOS analysis was conducted for the following scenarios: • Existing traffic conditions. • Projected Traffic Conditions - Scenario 1 - Wellington Hills Road "T" into Kanis Road. • Projected Traffic Conditions - Scenario 2 - Kanis Road re -aligned to "T" into Wellington Hills Road. • Projected Traffic Conditions - Scenario 3 — Same alignment as Scenario 1 with City recommended additional lanes. • Projected Traffic Conditions - Scenario 4 — Same as Scenario 3 with further additional lanes. Vehicle movement's capacity and LOS results for the AM and PM peak hours for all of the conditions analyzed are shown on the attached table. Each condition of projected traffic conditions assumes traffic signal control at each of the three intersections studied. • No vehicle movements have failed LOS for existing geometry, traffic control and traffic volumes. • For Scenario 1 projected traffic conditions, with the alignment of the extension of Wellington Hills Road to "T" into Kanis Road, and the "DCI -Peters" lane geometry, several vehicle movements at both Kanis Road and Chenal Parkway and at Wellington Hills Road and Chenal Parkway have failed LOS. No failed movements are projected for the intersection of Kanis Road and Wellington Hills Road. • For Scenario 2 projected traffic conditions, with the alignment of the extension of Wellington Hills Road continuing east on Kanis Road and existing Kanis Road "T" intersecting with Wellington Hills Road, several vehicle movements at Kanis Road and Chenal Parkway, at Wellington Hills Road and Chenal Parkway and at Kanis Road and Wellington Hills Road have failed LOS. ■ For Scenario 3 projected traffic conditions, which include the "DCI -Peters" plus the City recommended lane geometry, there remain vehicle movements with failed LOS at both Kanis Road and Chenal Parkway and at Wellington Hills Road and Chenal Parkway. ■ For Scenario 4, which includes still further additional lanes shows all failed vehicle movements are mitigated. The schematic lane geometry for Scenario 4 is shown on Figure 3, "Scenario 4 - Full Build Recommended Schematic Lane Geometry." • The alignment of the extension of Wellington Hills Road to "T" into Kanis Road offers far better traffic operation than the alternative of Scenario 2, and with improvements at the study intersections as shown on Figure 3, failed vehicle movements are mitigated at all three study intersections for the projected traffic conditions. Project No. P943 May 18, 2004 Chenal Parkway -- Kanis Road -- Wellington Hills Road Traffic Operations Study Attached are the following figures: o Figure 1, "Existing Traffic Volumes — AM and PM Peak Hours" o Figure 2, "Scenario 1 - Development Generated Traffic and Existing Traffic Volumes with 10 -Year Growth Factor - AM and PM Peak Hours" o Figure 2-A, "Scenario 2 - Development Generated Traffic and Existing Traffic Volumes with 10 -Year Growth Factor - AM and PM Peak Hours o Figure 3, "Scenario 4 — Full Build Recommended Schematic Lane Geometry." EXISTING 0 U J C J A J A J � E E TRAFFIC CONDITIONS SIGNAL LC m m m m m m m m m m m m J J d' W W W (WELLINGTON HILLS ROAD T INTO KANIS ROAD)u 3 z z Z N y y y INTERSECTION F m m m m (DCI - PETERS LANE GEOMETRY) m �' '�' "� 3 PM PEAK FIR PEAK HOUR z OF y 0 v m m m C � f I CF A F A F F E E E AM CA nal Parkway and Kanis Road SIGNAL B E B C C C C C C C D SIGNAL B C B C C C C C C C C PM AM Chenal Parkway and Wellington Hills Road I SIGN A C nla PM SIGN A C nla PROJECTED TRAFFIC CONDITIONS o C D A E A C � E E 2 SIGNAL LC SCENARIO 1 C J U J J 4' J J tY J J d' J m (WELLINGTON HILLS ROAD T INTO KANIS ROAD)u _ O ` U m •'� •'� m m m m m m m m m m m (DCI - PETERS LANE GEOMETRY) m �' '�' "� 3 PM SIGNAL A z z z 0) y 0 v m m m C � f I CF A F A F F E E E F SIGNAL INTERSECTION F A F A F F D E E • SIGNAL B E A D C A E E F F E D SIGNAL E A A D D A E E F E F C .PEAK FIR PEAK HOUROF B A A SIGNAL A A j A I A I B B A AM Chenal Parkway and Kanis Road SIGNAL C F A F A F F E E E F PM SIGNAL D F A F B F F D E E E AM way and Wellington Hills Road Chenal Park SIGNAL B E A D C A D D D E F E D SIGNAL C E A D C A E E D E F E D PM AM Kanis Road and Wellington Hills Road SIGNAL A A D A A A A A PM SIGNAL A A PM A A A A �6 es.(Ij1,c; n.v<" 0 Chenal Parkway and Kanis Road C D A E A C � E E 2 SIGNAL LC j D I A I D I B I D I C I D D C '• U J F- 4' J H tY J H d' J m 0' _ O ` U SIGNAL B •'� •'� B C A D E E D D co co W m 3 m m m z m m m m m d� y y k PM SIGNAL A A A A B B 11 A 3 - z z m m m C � f I CF A F A F F E E E F SIGNAL C F A F A F F D E E • SIGNAL B E A D C A E E F F E D SIGNAL E A A D D A E E F E F C SIGNAL A A A A B A A SIGNAL A A j A I A I B B A AM Chenal Parkway and Kanis Road I SIGNAL C F A F A F F E E E F PM SIGNAL C F A E D F F E E E E AM Chenal Parkway and Wellington Hills Road SIGNAL B E A D C A E E D E F E D PM SIGNAL E A A D D A D E D F E F C AM Kanis Road and Wellington Hills Road SIGNAL D A A A A PM SIGNAL D A A A D �6 es.(Ij1,c; n.v<" 0 Chenal Parkway and Kanis Road C D A E A C � E E 2 SIGNAL LC j D I A I D I B I D I C I D D C AM Chenal Parkway and Wellington Hills Road _ o jED A A W pp W W m m m m m m m m m SIGNAL B A A B C A D E E D D co CD fn co Z Z Z w N N Q N F Z Z rq U) y y A PM SIGNAL A A A A B B 11 A • - ■ SIGNAL I CF A F A F F E E E F SIGNAL C F A F A F F D E E E SIGNAL B E A D C A E E F F E D SIGNAL E A A D D A E E F E F C SIGNAL A A A A B A A SIGNAL A A j A I A I B B A O Chenal Parkway and Kanis Road C D A E A C c E E C SIGNAL LC j D I A I D I B I D I C I D D C AM Chenal Parkway and Wellington Hills Road _ o jED A A C B A D E E B PNS SIGNAL B A A B C A D E E D D co CD fn co m A W W W A Z Z rq U) y y A PM SIGNAL A A A A B B 11 A c AMSIGNAL PM Chenal Parkway and Kanis Road C D A E A E D E E C SIGNAL LC j D I A I D I B I D I C I D D C AM Chenal Parkway and Wellington Hills Road SIGNAL A A A C B A D E E E D B PNS SIGNAL B A A B C A D E E D D B AMSIGNAL Kanis Road and Wellington Hills Road A A A A B A A PM SIGNAL A A A A B B 11 A LEVEL OF SERVICE RESULTS TL- o rn UIQ N N C. tti p °' d ODb •�mo-u <<-o ov 46 Z �9 0 l, N N O � V v .4 � y d� S9ti p w d b b o �'k a� -o d �� ro d ssr NNti 0 ti w p cocq CyUR ' y � c fl 90* c� r 1 ►? Zr m D �C Z o M (nco [o a OD D D LC��GT ,a c �N 4,9 R �4 m D z v m N X H V Z �= r� 6 JO m19-0 S -o = '0 4 � .� r. o n, m 21 sr a � °- of i 2 O N� D m ru z 'n m Q' co w N UXm ztip a d `o *0 L .o 0 m 4 FZ mMm(n d X�3 o-, I D< o 0 T.0m �N C K n X v HJIHON ` I C N N cnC -I- oZO- OD d 0 • �� CD l[ -o pmA Q 6 Li -NI0 99 a A: °'S[ �► w Z Co a En o � w ^' NN o ' 3 tai A S9ti p w d b `03Co 0 r�. 'V GyU RCH J D �-I a w z« p o ��rt y 4 �� r £5 -0 0 °- 991 Cn Z Ln w m o -A0* ;p LLQ p p m Q Y 90L-0 ��� o-9Zl D " a CN o m N N. N D Z v X t] N C/)Co 1 2 6 p d b < d �D 0 y £zz Ill ��a S L a a OL[ o N� D z �y-I w o Zz G)m ' `' a �m TO zip `fl s do [ b omv � Ice � D< p n X0 p c z D OD ° ry ' c m �� HOM - U -V a� mo -m Lm I � oZ I w 074 t t t o .� I COD p s '� f Ili 1� 11 j ��t t * �rwr,y� Z � C�yURC� Ili 11x00 ,�� ti Q�C y S1Nd gCCESS D �h'Gb 4D•� �G a C3 m N oQ, zi D D ZE�C�iyT cn Cf) c �D m �n a � m �� � �► � Z r'M r'OIB�iIrM s�A► Z m ,6 G) c m m(nc0 O0r m r Z �= mKWD w m y C F0 � 0 -