HomeMy WebLinkAboutminutesJune 17, 2004 ITEM NO.: 12 _ FILE NO.: MSP04-02 Name: Master Street Plan Amendment - Ellis Mountain Planning District Location: Kanis Road near Chenal Parkway and Wellington Hills Request: Functional Classification, Adoption of -a Design Standard and Intersection Alignment Source: Robert Brown, Development Consultants, Inc. PROPOSAL / REQUEST: Master Street Plan Amendment in the Ellis Mountain Planning District for a Functional Classification change, a change in Design Standards and adoption of an Intersection Alignment. The first part of the application is to change the Functional Classification of the existing alignment of Kanis Road from the eastern intersection of Chenal Parkway eastwards to the west end of Rock Creek Bridge. For this report, this section is referenced in this report as the "Existing Alignment." This section is currently shown as a local street to be built to Commercial standards as warranted. The proposal is to change the Functional Classification to Minor Arterial. The applicant has stated the reason for the proposed change in the classification is "(i) Increased benefits to traffic flow and public safety and (ii) to clarify the classification of the street under the Master Street Plan. In the revised application, it is requested that the design standard be a "Minor Arterial five lane without bike lanes." The second part of the application is to adopt a design standard of "Minor Arterial five lane without bike lanes" for the proposed alignment of Kanis instead of the current design standard of a right-of-way 90 feet with four -lane section, turn lanes at major intersections, 14 -foot center median, 5 -foot sidewalks, and median cuts limited to 600 -foot minimum spacing" as stated in Ordinance #17,958 (March 16, 1999). For this report, this section is referenced in this report as the "Proposed Alignment." The third part of the application is to adopt an alignment of the intersection of the Proposed Alignment with the Existing Alignment. The question is whether through traffic continues on the Existing Alignment of Kanis Road to intersect Chenal Parkway at the Kroger shopping center as the applicant requests or if the through traffic switches from the Existing Alignment to the Proposed Alignment to intersect with Wellington Hills Road. June 17, 2004 ITEM NO.: 12 [Cont.] FILE NO.: MSP04-02 CURRENT MASTER STREET PLAN: This amendment is close to the West Loop and other arterials. The West Loop is approximately one mile to the west starting at the intersection of Rahling Road and extending southwards crossing the western leg of Kanis Road at Edswood, crossing Colonel Glenn Road, Lawson Road and continues southward before intersecting 1-30 at the County Line exit. Kanis Road west of Chenal Parkway is a Minor Arterial westward to the Burlingame Road intersection where it becomes a Principal Arterial to the planning boundary line. Rahling Road is a Minor Arterial from Chenal Parkway to Hinson Road where it and Taylor Loop's eastern leg form the remainder of the Minor Arterial to continue to Highway 10. This "Proposed Alignment" of the Minor Arterial has been shown on the Master Street Plan since the 1988 rewrite of the plan (Ord. 15,519). The previous version Ord. 14,210 of March 16, 1982 also shows that Kanis was a Minor Arterial from Rock Creek Parkway to 12th Street. The graphics on page 28 of that document clearly shows that minor arterial intersects Rock Creek Parkway (now know as Chenal Parkway) at Wellington Hills. There have been other changes in the area, but none to the sections in question to the west of the Rock Creek Bridge. The Master Street Plan shows a Minor Arterial extending southward from Rhaling Road along Champlin/Wellington Hills/Kanis Road to the intersection of Kanis and Cooper Orbit Road for north/south movements. (The Minor Arterial continues on to 12th Street in an ease -west fashion.) Ordinance #16,801 (Dec. 20, 1994) changed the alignment back to the current alignment of Kanis Road from 1100 feet± south of Baker Lane to the Rock Creek Bridge. This change was for a segment south and east of the subject area in this amendment, but does in the ordinance state that this is a "north -south alignment from Rock Creek south to Cooper Orbit Road". Minor arterials by definition provide the connections to and through an urbanized area by providing short distance travel (as opposed to Principal Arterials that serve through traffic and connect major traffic generators). Generally Minor Arterials are spaced at one -mile intervals and have a right-of-way of 90 feet. The Master Street Plan text states "newly created or existing minor arterials that have not been partially constructed may select either of the three approved sections at the time of the preliminary plat applications. The preferred section is the divided four lane section." Ordinance #17,958 (March 16, 1999) amended the Design Standards by adding a footnote to the section of Kanis Road from Chenal Parkway to West 12th Street. "Design Standards for Kanis Road from Chenal Parkway to Bowman Road shall be as follows: right-of-way 90 feet with four -lane section, turn lanes at major intersections, 14 -foot center median, 5 -foot sidewalks, and median cuts limited to 600 -foot minimum spacing." The Whereases of this ordinance state: 2 June 17, 2004 ITEM NO.: 12 (Cont._ _, __ FILE NO.: MSP04-02 "Whereas, Kanis Study Committee and Mehlburger Engineering Firm reviewed [the] corridor and developed several alternative designs for roadway construction; and Whereas, Planning Commission reviewed [the] Committee's and Mehlburgers's work". This study clearly shows the Minor Arterial intersecting Chenal at the Wellington Hills intersection. This design standard would apply to the "Proposed Alignment" as referenced in this report. This report shows the Existing Alignment as a two lane commercial street. The through traffic would leave the Existing Alignment for the Proposed Alignment and intersect Chenal Parkway at Wellington Hills Road. The Proposed Alignment would include a sweeping curve to transition from the Existing to the Proposed Alignment. The Master Street Plan shows the "Existing Alignment" as a local street. Any street that has non-residential zoning or multi -family zoning abutting is subject to the standards of a Commercial Street Design Standard. The Design Standard for a Commercial Street is a right-of-way of 60' and a minimum paving width of 31' or 36' as approved on the preliminary plat. Sidewalks are to be on both sides and five feet wide for commercial applications. There are no plans for widening Existing Alignment outside the half street improvements as required. A letter from Tom Carpenter, City Attorney by Stephen Giles, Deputy City Attorney, dated April 9, 1996.states "6. The Board of Directors denied the developer's request for a waiver of half commercial street improvements to Kanis Road along the boundary of the property." Plans for building proposed alignment are clarified in the same letter. It states 'A. The developer agreed to construct full width for one half of the length of the unnamed arterial on the east side of the property, but the cost would not exceed one half of the cost of half width improvements for the total boundary length." HISTORIC DISTRICTS: There are no historic districts that would be affected by this amendment. CITY RECOGNIZED NEIGHBORHOOD ACTION PLAN: This area is covered by the Rock Creek Neighborhood Action Plan. The 1998 plan states to: "Realign Kanis Road to intersect with the eastern portion of Kanis Road and no longer intersect with Chenal Parkway" and "Complete Champlin Drive and Villages of Wellington Road to Kanis Road, and construct the intersection of Chenal Parkway and Champlin Drive; fund with a bond issue (build prior to development)". These objectives in the plan are contrary to portions of the Master Street Plan and the amendment as filed. 3 June 17, 2004 ITEM NO.: 12 Cont. FILE NO.: MSP04-02 HISTORY: Z-6318 In the Dairyland PCD Final Approved Site Plan, "half street improvement for a 36' collector street section" were noted. Also, Kanis Road intersections to be constructed to Master Street Plan Standard on Southwest'/ of proposed intersection. A Dedication Deed dated mid April 1998 for dedication of right-of-way for property along Chenal Parkway and at the southwest corner of the intersection of Kanis and Chenal. This dedication does not include any dedication along Kanis Road. S-1154 In the Dairyland PCD Final Approved Site Plan, "half street improvement for a 36' collector street section" were noted. Also, Kanis Road Intersections to be constructed to Master Street Plan Standard on Southwest'/4 of proposed intersection. Z -4933-D Mechanics Lumber Company Long Form PCD. According to a November 20, 1990 Minute record of the Planning Commission, Public works stated that "Kanis Road on the Mechanics Lumber Frontage will be a two lane collector and right-of-way is already in place.) Warranty Deed 93 14922 states that the City of Little Rock purchased the 90' right of way from Eugene Pfeiffer for $71,330. ANALYSIS: This area is in a developing section of town with constantly increasing pressures on the road system. There is scattered development in the area. On Chenal Parkway in this area, less than half of the parcels are developed. On Kanis, the amount of developed land is much less. When fully developed, this area will have major traffic concerns. FUNCTIONAL CLASSIFICATION: The Master Street Plan shows at different locations across the city a proposed alignment that is different than the existing alignment. For example, Cooper Orbit Road at Kanis, Bowman and 36th Street area and Ironton Road at Dreher Cutoff. These proposed alignments would improve flow of traffic in the area by providing better alignments of the specific intersections, more space for additional lanes, better sight distances, less time delays, etc. If the Functional Classification is changed to a Minor Arterial, there are conflicts with the spacing of the driveways into the Kroger shopping center. If this was a new development, the closest a drive could be to the intersection is 300 feet. 4 June 17, 2004 ITEM NO.: 12 (Cont. FILE NO.: MSP04-02 This driveway is approximately 150 feet from the south right-of-way line of Chenal Parkway. There is a second drive to serve the center located approximately 190 feet to the south of the first. This spacing of the northern drive creates conflicts of movements that should not be condoned. If the Design Standard is approved, should not the driveway spacings be considered also? If so, the two drives serving the center should be consolidated towards the south. The possibility of aligning the drive to be across from the entrance to the National Home Center's drive and serving as a shared drive between the shopping center and the carwash property should be explored. DESIGN STANDARD: Ordinance #17,958 (March 16, 1999) amended the Design Standards by adding a footnote to the section of Kanis Road from Chenal Parkway to Vilest 12th Street. "Design Standards for Kanis Road from Chenal Parkway to Bowman Road shall be as follows: right-of-way 90 feet with four -lane section, turn lanes at major intersections, 14 -foot center median, 5 -foot sidewalks, and median cuts limited to 600 -foot minimum spacing." The proposal from the applicant is to accept one of the pre -approved standard sections as stated in the Master Street Plan. The application is to accept the "Minor Arterial 5 Lane without Bike Lane" as the standard. It is described as having a right-of-way of 90 feet with five -lane section with a continuous left turn lane, 5 -foot sidewalks along the property line. The major difference between the proposed and the existing is the deletion of the median and the deletion of a minimum of 600' spacing of median cuts in the proposed. According to the Tax Assessors' maps and deeds, the total length of the right of way that the City owns for the Proposed Alignment is 628'. This issue of 600' spacing of median cuts in this segment would limit access to right in and right out since left hand turns off of the roadway would be prohibited. If the design standard is changed, the access should be as far from the intersections as possible and be coordinated with access on both sides of the street. INTERSECTION ALIGNMENT: The Master Street Plan does not necessarily define intersection alignments. It does specify which is the through movement. A through movement could be defined as proceeding through an area or intersection following the straight or curving roadway without making conscious left or right turns. The plan currently shows the through movement of traffic (if traveling north-west on Kanis) to leave the current alignment of Kanis after passing over the Rock Creek Bridge and enter the Proposed Alignment along a sweeping curve to intersect with Wellington Hills at Chenal Parkway. A motorist would be forced to make a left turn onto the Existing Alignment of Kanis Road at the intersection. The application would change this to where the through traffic would continue on Kanis Road and intersect Chenal Parkway at the Kroger Shopping Center. A motorist would be forced to make a right turn onto the Proposed Alignment of Kanis Road at the intersection. 5 June 17, 2004 ITEM NO.: 12 (Cont.) FILE NO.: MSP04-02 TRAFFIC STUDY: The applicant provided Staff with a traffic study titled "Traffic Study Kanis Road Master Street Plan Issue prepared for: Whisenhunt Investments:" It shows different scenarios: the existing condition; Scenario One with the alignment as proposed with the through traffic continuing on Kanis Road; Scenario Two with the through traffic continuing on the Proposed Alignment; Scenario Three based on the Scenario One alignment with additional lanes added to the existing and proposed alignments; and Scenario Four based on the Scenario One alignment with additional lanes added to Chenal Parkway as well as the ones previously mentioned. The Level Of Service (LOS) numbers are based on the three intersections. The overall LOS for Existing Conditions of the Chenal/Kanis intersection are D and C. Scenario One and Two are based on the following statement: "Projected traffic conditions include projected traffic generated by a variety of development in the vicinity of Chenal Parkway, Kanis Road and Wellington Hills Road plus existing traffic volumes with a 10 year growth factor included for two different alignments of the planned Wellington Hills Road Extension." The Chenal Parkway and Kanis Road intersection in both scenarios received an "F" in the a.m. peak hour and an "E" in the pm peak hour. The Chenal Parkway and Wellington Hills intersection received a "D" in the a.m. peak hour in -both scenarios, but in the p.m. peak hour, it received a "C" in Scenario Two and a "D" in Scenario One. The Kanis Road and Wellington Hills intersection was the last intersection reviewed. This is the intersection of the alignment discussion. In both scenarios, the a.m. peak hour received an "A", but in the p.m. there is a discrepancy. There is a typo on the p.m. movements of Kanis Road and Wellington Hills Road intersection. The supplemental files provided with the report state that the EBRT — eastbound right turn movement received a grade of "A" while the text of the report gave it an "F". This would change the Overall Intersection grade from a "D" to an "A". Overall, the traffic study for Scenario One and Scenario Two are not radically different. NEIGHBORHOOD COMMENTS: Notices were sent to the following neighborhood associations: Spring Valley Manor POA, Parkway Place POA, St Charles POA, Carriage Creek POA as well as representatives of the Wellington Hills area (Bob Tyler and Doug McNeil). Staff has received no comments from area residents. STAFF RECOMMENDATIONS: Staff believes all changes are appropriate. L June 17, 2004 ITEM NO.: 12 (Cont.) FILE NO.: MSP04-02 PLANNING COMMISSION ACTION: (JUNE 17, 2004) The item was placed on the consent agenda for approval. A motion was made to approve the consent agenda and was approved with a vote of 9 ayes, 0 noes, and 2 absent. 7