Loading...
HomeMy WebLinkAboutLetter AHTD on interchange I430 and 36th Street• ' a-�"' ARKANSAS STATE HIGHWAY CO3MMISSJO RAYMOND PRITCH=TT, CHAIRMAN ........r MAUNELLE ROP; HARROD VICE CHAIRMAK FRESCOTT} 1 RODNEY E. SLATER JONESBORC L.V'-'BI!L'CLARE: I.o. Hoa 2201 + . P HOT RINGS r BOBBY HOPPER Li n1_ RocK, ARKA\SAti 72203 SPRINGDALE . TELr!,iio\T No. (501) 560-20W FAx No. (50]) 569-24W fat arY 9 ­ FTI MmiaiS_DIX.,.D_ a1t-6h City Manager City Hall Markham at Broadway Little Rock, Arkansas 72201 Dear Mr. Dalton: v MIAURICE SMITH DoFECTOR C, HIGHWAYS AND TFANS7O+:A710N DAN FLOWERS ASSIS7AN7 DIREC70= OF HIGHWAYS AND 7RANSPOP7A71d: CHARLES VEN.AEL E CHEF ENGINE As requested by your letter of December 20, 1990, the Department staff has reviewed vour request for a break in the control_ or access on -430 at 36th Street. After reviewing the interchange feasibility study, it is the Department's position that [a, proval o ' an ;' access.-:,,centro]._-.;,:break'..at k h srr_-., -:would -be- :premature_:, While the study noted that the interchange has been included in the PATS plannina and the Citz-'s Master Street Plan, 'no-:-acti— ity" Lias occurred; -:which- zndica ted aneed" f.v� the ' accass break decision-; at "this' -time: As noted a r. �he s tud :- , Cita} approval- -bf the Summit project was not condi}ionec u>Jc provision of ar.=n-erchanoe at 36th Street. - xA_t -such .time as conditions indicate the need for an interchange at. t36afi`;;.Street,- the- Department will' reconsider -_-the-•` access break '• Ereqpe. s_t Ultimate approval of any access control change is a decision of the Federal Highway Administration. rThe:i-"FHWA has .`recently 'revised;'its E,pgl""icy.ton additional interchanges to the interstate System. Once guidance on documenration requirements for additional interchanges is received from the FHWA, this rin±ormatibn will'be forwarded% to your office. JAN 17 1991 �N. ARKANSAS STATE HIGHWAY COMMISSION LITTLE ROCK. ARKANSAS Mr. Thomas D. Dalton City Manager Page 2 January 4, 1991 The Department understands the need for strategic long term planning to accommodate traffic needs. This letter is not a summary denial of your request; rather it is a �"deferral=until`a :more: appropr`"ate � iffie A Sincerely, -moi r CJS / Maurice Smith Director of Highways and Transportation