March 4, 1999
ITEM NO.: 5
FILE NO.: Z -4403-E
NAME: Crestwood Corporate Center - Long -Form POD
LOCATION: West side of Aldersgate Road, approximately
1,300 feet south of Kanis Road
flF.VF.T.()VV..R -
ENC.TNF:F.R
The Wilson Co., Inc. McGetrick and McGetrick
1501 S. Main Street 319 E. Markham St., Ste. 202
Little Rock, AR 72202 Little Rock, AR 72201
AREA: 12.10 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0
ZONING: MF -24 ALLOWED USES: Multifamily - 24 units
per gross acre
PROPOSED USE: General Office
VARIANCES/WAIVERS REQUESTED: None requested.
A. PROPOSAL/REQUEST:
The applicant proposes to rezone the 12.10 acre site on the
west side of Aldersgate Road from MF -24 to POD to allow for
the construction of five (5) office buildings and
associated parking areas. The construction is proposed in
two (2) phases as follows:
Phase I - Building A - Two-story
18,000 square feet
Building B - Two-story
44,800 square feet
176 parking spaces
March 4, 1999
SUBDIVISION
ITEM NO.: 5 (Cont.) FILE NO.: Z -4403-E
Phase II- Building C - Two-story
56,800 square feet
Building D - One-story
14,400 square feet
Building E - One-story
6,000 square feet
246 parking spaces
The property will be accessed by utilizing a single drive
from Aldersgate Road for Phase I, with two additional
drives being constructed with Phase II.
A total of 422 parking spaces.is proposed for the entire
project. The ordinance would typically require 314 spaces.
The applicant has stated that a tree study will be
performed on the site in order to maintain as many existing
trees as possible. Existing trees, 6 inches to 8 inches in
caliper, will be relocated to landscape areas around the
buildings and parking areas.
The applicant has also noted that the typical hours of
operation will be from 8:00 a.m. to 5:00 p.m., Monday
through Friday. The applicant is also proposing three (3)
ground -mounted signs (monument style) along Aldersgate
Road.
B. EXISTING CONDITIONS:
The site is undeveloped and mostly wooded. The property
slopes from Aldersgate Road downward to the Interstate 430
right-of-way. Camp Aldersgate is located immediately south
of this site, with several single-family residences to the
east across Aldersgate Road. There are four single-family
residences to the north along the west side of Aldersgate
Road, with 0-3 zoned property further north and to the
northeast.
C. NEIGHBORHOOD COMMENTS:
Staff has received a phone call from Camp Aldersgate
requesting information on this application. Otherwise,
staff has received no comments from the neighborhood. The
John Barrow and Sewer District #147 Neighborhood
Associations were notified of the public hearing.
2
March 4, 1999
SUBDIVISION
ITEM NO.: 5 {Cont.} FILE NO.: Z -4403-E
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Aldersgate Road is listed on the Master Road Plan as a
collector street; dedication of right-of-way to 30 feet
from centerline is required. (No traffic counts for
Aldersgate Road are available.)
2. Driveways shall conform to Sec. 31-210 or Ordinance
16,577.
3. Provide design of streets conforming to "MSP" (Master
Street Plan). Construct one-half street improvements to
these streets, including 5 -foot sidewalks, with planned
development.
4. Plans of all work in right-of-way shall be submitted for
approval prior to start of work.
5. Stormwater detention ordinance applies to this property.
6. Revise driveway location for acceptable sight distance,
or improve sight distance with street reconstruction to
facilitate sight distance for proposed driveways.
7. Submit preliminary plans for stormwater management,
including drainage easements and on-site detention.
8. With Phase I, include construction of Aldersgate Road
improvements to a point north of its intersection with
West 18th Street.
9. Move 24' driveway slightly north to align with West 18th
Street.
10. AHTD permit will be required for any drainage impact
on I-430 right-of-way.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main relocation required prior to start
of construction.
AP&L: No comment.
Arkla: No Comment.
Southwestern Bell: A 10 foot utility easement is requested
along the south property line.
Water: An acreage charge of $150 per acre applies in
addition to normal fees. On site fire protection will be
required. Any needed relocation of existing facilities
will be at the expense of the developer.
Fire Department: Place fire hydrants per code. Contact
Dennis Free at 918-3752 for details.
3
March 4, 1999
SUBDIVISION
ITEM NO.: 5 (Cont.) FILE NO.: Z -4403-E
County Planning: No Comment received.
CATA:
Central Arkansas Transit Authority requests a bus pull-out
be constructed on Aldersgate Road due to the anticipated
traffic demand. A pull-out or "turn -out" will allow the
buses to pull out of the traffic stream so as not to
disrupt the flow. Pull-out configurations will be provided
by CATA. Route #3 Baptist Medical Center serves this area.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division:
This property is currently shown as Single Family on the
Land Use Plan and is in the I-430 Planning District. This
item is the subject of a Land Use Plan Amendment to be
heard on this agenda. (Item 5.1).
Landscape Issues:
Areas set aside for buffers and landscaping meet and exceed
ordinance requirements.
A 6 foot high opaque screen, either a wooden fence with its
face side directed outward or dense evergreen plantings,
will be required along the southern perimeter of the site.
The City Beautiful Commission recommends preserving as many
existing trees as feasible. Extra credit can be given when
preserving trees of 6 inch caliper or larger toward
compliance with the Landscape Ordinance.
Prior to a building permit being issued, a detailed
landscape plan must be approved by the Plans Review
Specialist.
G. ANALYSIS:
The applicant submitted a revised site plan to staff on
February 17, 1999. The revised plan appears to address
most of the issues as discussed by the Subdivision
Committee.
4
March 4, 1999
SUBDIVISION
ITEM NO.: 5 (Cont.) FILE NO.: Z -4403-E
A bus pull-out has been shown on the site plan as requested
by CATA, the middle drive from Aldersgate Road has been
moved to align with West 18th Street, and the total number
of parking spaces has been reduced from 478 to 422 spaces.
The applicant has not removed the drives and parking along
the south side of the two buildings in Phase I as requested
by the Subdivision Committee in order to provide an
increased buffer between this property and Camp Aldersgate.
Staff feels that the parking on the south sides of these
two buildings should be removed as well as the drive on the
south side of the westernmost building. The drive along
the south side of the eastern building will be used to
serve a loading dock at the buildings southwest corner.
Due to the topography, this particular drive will not be
seen from the property to the south. This issue needs to
be resolved.
The applicant also submitted east/west sections through the
property. Due to the topography of the site, the two-story
buildings will appear to be one-story from Aldersgate Road
and two-story from Interstate 430. The applicant has noted
that all retaining walls will be constructed to Public
Works and Building Code standards. The maximum retaining
wall height at any one point will be approximately eight
(8) feet.
Otherwise, staff can foresee no
associated with the site plan.
should have no adverse effect on
H. STAFF RECOMMENDATIONS:
other outstanding issues
This proposed development
the general area.
Staff recommends approval of the POD subject to the
following conditions:
1. Compliance with the requirements as noted in paragraphs
D, E and F of this report.
2. The proposed monument style ground -mounted signage must
conform to the ordinance standards for office signage
(maximum area - 64 square feet, maximum height - 6 feet).
3. Any site lighting must be low-level and directed away
from adjacent property.
4. Staff feels that the drives and parking south of the
buildings in Phase I should be eliminated, with the
exception of the drive on the south side of the
5
March 4, 1999
SUBDIVISION
ITEM NO.: 5 (Cont.) FILE NO.: Z -4403-E
easternmost building, in order to provide an increased
buffer along the south property line.
SUBDIVISION COMMITTEE COMMENT:
(FEBRUARY 11, 1999)
Pat McGetrick and other representatives were present,
representing the application. Staff gave a brief description of
the POD. Staff noted that the applicant needed to submit
details on the retaining walls and east -west sections through
the property. Mr. McGetrick noted that the typical hours of
operation would be from 8:00 a.m. to 5:00 p.m., Monday through
Friday.
Mr. McGetrick noted that a tree survey was being done on the
property. He noted that as many trees as possible would be
saved or relocated throughout the property.
The Public Works requirements were briefly discussed. Mr.
McGetrick stated that he would work with Public Works regarding
any sight -distance issues relating to the placement of the
proposed drives.
In response to a question from Commissioner Berry, Mr. McGetrick
stated that he would look at reducing the number of parking
spaces along the south property line in order to increase the
south buffer area.
Mr. McGetrick also noted that a bus pull-out lane would be
constructed in Phase II at the north end of the property as
requested by CATA.
The landscape requirements were briefly discussed. Bob Brown,
Site Plan Review Specialist, noted that the City Beautiful
Commission recommends preserving as many trees as possible on
the site.
Mr. McGetrick indicated that he would meet with the Camp
Aldersgate representation regarding this proposed development.
After the discussion, the Committee forwarded the POD to the
full Commission for resolution.
6
°
°
01 o . OR�aP❑ C
C" 03 a
0 0 ❑ a 4 OQ�
❑ �4
�f2i, ❑
03 c2 0
02 0 0 ❑
f07 �3 11 p 0 0 F
02 CUP O3 u 0 6 0
-j 0 0
A, 0 .
°�• °� 0 ° Q
� o a; 6 d
° ° a
02
° o � .o � o �
❑o $ 0 ❑
o ao
13
❑ ❑ e ❑ °❑ ❑ ❑ �`�'
d o 9 �
03 � Cl
° �❑o � opQ
0 4 0 ❑a�-,
ED LO ql Vag 1)
0�D o
g Cl
C3 ❑ R4 ��
-
Lf ❑ 130
0 °
° 1
os p c 0 •°0- ❑dG z D❑. i
4� � �� ❑ do o �_� e � I
a �
0 arH �,1 e3 '
PCD �
¢
Vicinity Map
Area Zoning
Z -4403-E
ALDERSGATE RD., S. OF KANIS RD.
TRS T1N R13W10
CT _ 24.04
PD _ 11
WARD 5
0 300 600
Item NO. 5
Vicinity Map
Land Use Plan
Z-4403 -E
ALDERSGATE RD., S. OF KANIS RD.
TRS 1N R nmio
CT 24.04
PD 11
WARD 5 _ 0 300 600
Item No. 5
• `— ' XL'veff6�1"F MOR Dr .� -'�" . ` - - _- _
�;...........
Z I
r �
_ :�.hl
I,
TRS 1N 13W 10 PLANNED DEVELOPMENT w rMM NO.
CT 24.04 Z -4403-E
PD 11 Crestwood Corporate Center POD zE'
Aldersgate Road, S. of Kanis Road 5
Ward 5 3
March 4, 1999
ITEM NO.: 5.1
FILE NO.: LU99-11-01
Name: Land Use Plan Amendment - I-430 Planning District
Location: Aldersgate Road
Request: Single Family to Suburban Office
Source: Pat McGetrick, McGetrick Engineers
PROPOSAL / REQUEST:
Land Use Plan amendment in the I-430 Planning District from
Single Family to Suburban Office. Suburban Office provides for
low intensity development of office or office parks in close
proximity to lower density residential areas to assure
compatibility. A Planned Zoning district is required.
CURRENT LAND USE AND ZONING:
The property is currently zoned PRD and is approximately 12
acres in size. To the north and east of the site lie single
family houses and vacant land zoned R3 and shown as Single
Family. To the south is Aldersgate Camp which is zoned OS (Open
Space) and shown as Park/Open Space on the Land Use Plan. To
the west is I-430 Interstate.
RECENT AMENDMENTS:
December 1, 1998, A change from Multi -Family to Mixed Office
Commercial on Labette Drive west of John Barrow.
June 18, 1996, multiple changes as a result of the John Barrow
Neighborhood Action Plan including this site from Suburban
Office to Single Family.
January 16, 1996, a change from Low Density MultiFamily to
Suburban Office east of Bowman, south of Kanis..
MASTER STREET PLAN:
Aldersgate Road is shown as a collector on the plan and is shown
on the Master Street Plan to loop back to the west on the
southern end to connect with Shackleford Road south of
Aldersgate Camp.
March 4, 1999
SUBDIVISION
ITEM NO.: 5.1 (Cont.) FILE NO.: LU99-11-01
PARKS:
There are no existing parks in the immediate areas.
BACKGROUND:
At the time of the John Barrow Neighborhood plan, there was not
as much demand for office in the area; therefore this site was
changed to Single Family.
Single Family homes lie across Aldersgate Road to the east.
Concerns have arisen over the massing, siting, landscaping and
buffering of these structures to make them softer and more
compatible with those single family residences.
NEIGHBORHOOD PLAN:
This area is covered by the John Barrow Neighborhood plan. In
that plan, it states as a goal "to enhance the climate towards
encouraging new businesses and commercial establishments..."
preferably medical oriented. This proposal appears that it
could be medical support services.
NEIGHBORHOOD COMMENTS:
Notices were sent to the following neighborhood associations:
Spring Valley Manor Property Owners Assoc., Parkway Place N.A.
and Gibraltar/Pt. West/Timber Ridge. Staff has not received any
comments from area residents as of this printing.
STAFF RECOMMENDATIONS:
Staff believes the change is appropriate.
FO
SO
e
z PK
Q �
O OS
k I� � L
I
o O ❑ Do Q r
o IL
o ed
N NI
❑ o. ❑ ❑
I 7 ❑ C:!� 0 ED _
po
_
0 1r
p o ° d If
° ❑ ❑ r Lj
a
(� ❑ 22AI� �L•
l ❑ 177r-1FC3
Vicinity Map
Plan Amendment
LU99-11-01
ALDERSGATE ROAD
SF TO SO
TRS T1N R13W10
CT 24.04 R.
PD 11
WARD 5
o Ion .00
Item No.5, i
02
cc
0 D2 CUP
E01
d
t
N
02
a
Vicinity Map
aQ
Q
❑ 4 �
9F24
� a
Q oz 03
03
I os I os '
,13
69❑ Q° O n ❑Q
o �oo Q CI
❑ 6 J
C) CPS CD
CD C3
El
a ❑ p D0
0 = C
MF -24 D
D o
V
.5
o 0 _
oD
C3 U
oo d o
° n
o f�o Cs
n �u ,
2i—1
w ,, n �10-j � C, fl ,
Existing Zoning
LU99-11-01
ALDERSGATE ROAD
TRS TIN R13W10
CT 24.04
PD 11
WARD 5
0 700 .00
Item No. G.