Loading...
HomeMy WebLinkAboutmemo from Moore to Board on Fellowship BibleBoard of Directors Communication TO: HONORABLE MAYOR AND BOARD OF DIRECTORS FROM: BRUCE T. MOORE, CITY MANAGE SUBJECT: FELLOWSHIP BIBLE CHURCH DATE: JUNE 12, 2006 The request was made at the May 30, 2006, Board of Directors Meeting for staff to provide clarification regarding whether the Fellowship Bible Church development is contingent upon the Board of Directors approval of the various land -use and proposed zoning changes as presented to the Planning Commission. In addition, staff was to prepare a report on the existing traffic patterns in the area, supply drawings of the proposed street improvements, analyze the anticipated traffic patterns if developments occur and address how any issues will be handled. The Fellowship Bible Church Conditional Use Permit (CUP) that allowed construction of the church is a separate administrative item from the land -use and zoning items before the Board of Directors. However, statements made by representatives of Whisenhunt Developers (Whisenhunt) and a letter from Fellowship Bible Church indicate that the real estate sale is contingent in some contractual way on all of the Shackleford Road property being developed at one time. According to the developer and Church Officials, this is to facilitate grading of the sites and road construction. Fellowship Bible Church has contracted with Whisenhunt, the applicant for the proposed Land -Use Plan amendments and re -zonings, to purchase a tract of land at the center of the old Shackleford Road dairy farm for the Church's new campus. The site is fifty (50) acres and is part of the farm's acreage, for a total of one hundred ten (110) acres, located north of Chenal Parkway. The development plans for the entire site are complex, requiring the construction of multiple streets, improving the intersections and making other infrastructure improvements. In addition, considerable earthwork must be completed to make the site usable, which requires the ability to distribute fill material over the entire property. All street work is to be completed at one time and will commence after the earthwork is completed to insure high quality roads and intersections. The City of Little Rock, Arkansas roadwork to be completed by Whisenhunt is substantial, and includes improving Chenal Parkway between both intersections where Chenal Parkway intersects with Kanis Road, as well as the complete construction of the connection of Wellington Hills Road, Kirk Road, Champlin Drive and Wellington Village Roads. The end result will be a system of new roads to help disperse existing and future traffic. Existing Traffic Patterns: From its conception in the mid to late 1980's, traffic engineers have envisioned that Chenal Parkway would likely become one of the busiest traffic corridors in the City. Since that time, a traffic study in 1996 reached a similar conclusion and the latest study associated with applications to change land -use and zoning by Whisenhunt and Deltic Timber (Deltic) has confirmed that prediction. The land -use plan amendments, conditional use permit and zoning applications currently before the Board of Directors by Whisenhunt in the vicinity of Kirk Road and Kanis Road are projected to increase traffic on the Chenal Parkway corridor after development above that which would occur if the property were developed according to current zoning and land -use. Projections by Peters & Associates are that the increases would be approximately 2,000 to 2,500 vehicles per day or about a 5% - 6% increase in 2016. As is often the case, any significant traffic increases will be most evident at intersections. Without improvement, delays at the intersections in the vicinity of the land would reach undesirable levels regardless of whether the Whisenhunt or Deltic applications are approved. As part of their applications, Whisenhunt has proposed a number of road and intersection improvements that meet or exceed Boundary Street Ordinance requirements in the vicinity of the development including: ➢ Widening of Kirk Road, north of Chenal Parkway, and an extension of Kirk Road north to Chaplin Drive. ➢ Intersection improvements at Kirk Road & Chenal Parkway. ➢ The extension of Wellington Hills Road west to Kirk Road and Systems Drive. ➢ The extension of Wellington Village Road west to Kirk Road. ➢ Adding or extending a third east bound and west bound lane on Chenal Parkway between the 'East Kanis' and 'West Kanis' intersections._ ➢ Widening and intersection improvements at the westernmost intersection of Kanis Road and Chenal Parkway. Taken as a whole, Public Works Staff believes that the street and intersection improvements proposed by Whisenhunt will mitigate the increased traffic levels on Chenal Parkway in the vicinity of the proposed developments resulting from their applications. Existing Traffic Counts: The table below summarizes the historic, current and projected traffic counts in the area. Existing traffic counts are from a 2004 Metroplan Report, and the 26,500 vehicles per day (vpd) figure is typical for a busy arterial road and is similar in nature to Cantrell Road, east of Interstate 430, or Barrow Road, south of Interstate 630. At this traffic level, there are generally no significant delays from the Chenal Wellington intersection west to the west leg of Kanis Road in the vicinity of the applications. The 2016 projection in this table is based on the assumption that traffic will increase as it has in the past. The projected volume of 47,000 vehicles per day on Chenal Parkway between the east and west legs of Kanis Road is comparable to existing traffic on Financial Center Parkway, and Cantrell Road west of Interstate 430. At this level of traffic, turn lanes and intersection capacity becomes a critical factor in the overall street capacity. Peak hour delays at arterial intersections can be expected, but generally, a four (4) -lane roadway with adequate turn lanes can handle this level of traffic. Traffic Counts on Chenal Parkwa Chenal Parkway near j Rahling Road Chenal Parkway between Kanis Roads (East and West) Chenal Parkway at Wellinaton Hills Road Actual 1995 Counts 3-M 11,000 Summary of Previous Traffic Studies: Actual 2004 Counts from Metroplan Study 2016 Projection Based on Historical I Trends 20,100 38,900 26,500 47,000 25,800 F 45,500 -- Two other Chenal Parkway traffic studies were previously completed and the table below summarizes both of those studies. The first study, which was completed in 1988, served as the basis for the initial design and predicted 45,000 vpd on Chenal Parkway at the intersection with Wellington Hills Road, which is consistent with the current traffic study. In 1996, the City commissioned a study regarding the impact of rapidly changing land -use in the Chenal Parkway corridor between Financial Center Parkway and Kanis Road. That study showed that at 'full build out,' traffic would approach 78,000 vpd between the east and west legs of Kanis Road, which is far in excess of the other studies. Full build out assumes that all land in and around the corridor has been developed according to the desilgnated zoning and land -use and is generating traffic consistent with those uses. That volume could not be handled without three (3) travel lanes in each direction and is similar to current volumes on Interstate 630. Summary of Past and Current Traffic Studies: 1994 Board Resolution: A 1994 Resolution was passed prior to the 1996 Traffic Study regarding Chenal Parkway expansion. The resolution, which is attached, contains three (3) major points: ➢ Chenal Parkway would not become a six (6) -lane road 'despite the provisions of the Master Street Plan.' ➢ Unless approved by voters, Chenal Parkway would not be widened unless property owners voluntarily dedicated the right-of-way and participated equally in the cost. ➢ Any widening of Chenal Parkway by a bond issue would be voted upon separately and not combined with any other issue. ' Based on the historical trend, this level of traffic would not occur for around 30 years. 1988 Deltic 1996 City Study 2006 Whisenhunt Study Full Build -Out Study — 2016 Projection — No Land -Use changes 33,000 Chenal Parkway 56,000 37,000 near Rahling Road Chenal Parkway 78,000 51,000 36,000 between Kanis Roads (East and West 75,000 42,000 Chenal Parkway 45,000 at Wellington Hills Road — 1994 Board Resolution: A 1994 Resolution was passed prior to the 1996 Traffic Study regarding Chenal Parkway expansion. The resolution, which is attached, contains three (3) major points: ➢ Chenal Parkway would not become a six (6) -lane road 'despite the provisions of the Master Street Plan.' ➢ Unless approved by voters, Chenal Parkway would not be widened unless property owners voluntarily dedicated the right-of-way and participated equally in the cost. ➢ Any widening of Chenal Parkway by a bond issue would be voted upon separately and not combined with any other issue. ' Based on the historical trend, this level of traffic would not occur for around 30 years. Current Traffic Studv & Analysis: The latest study was prepared in association with Whisenhunt's applications for land -use plan amendments and zoning changes, and prepared by Peters and Associates, who prepared the previous two (2) studies. The study was reviewed by staff and has been revised a number of times based on comments by Deltic and City Staff. An initial staff concern was that the original draft assumed future conditions on Chenal Parkway such as three (3) lanes in both directions, and extra turn lanes at near -by intersections that would likely not be in place in the design year. As a result, the current traffic model presents a more conservative outlook. ➢ The study area is bounded on the west by Wellington Hills Road, on the east by the future Rahling Road extension to Kanis Road, on the north by Rahling Road and on the south by Chenal Parkway including all adjacent properties. Impact of Various Land Use Chanes: The table below summarizes the estimated impact on average daily traffic counts on Chenal Parkway and Rahling Road. The largest impact of the proposed developments is in the Chenal Parkway at Kanis Road intersections. Estimated Impact of Various Land -Use Changes Vehicles per Day and Percent Increase over the 'No Change' Condition At Full Build -out in the Year 2016 No Land -Use I With Whisenhunt Chenal Parkway 42,000 44,500(6%) at Wellington Hills Road Rahling Road at 24,800 26,400(6%) Champlin With Deltic and Whisenhunt Changes 42,700 (14%) 57,200 (11%) 46,800 (11%) 28,400 (15%) Changes 37,300 Changes (% increase Chenal Parkway 39,500(6%) at Rahling Road 51,400 _ 54,000(5%) Chenal Parkway at Kirk Road between Kanis Roads (East and Chenal Parkway 42,000 44,500(6%) at Wellington Hills Road Rahling Road at 24,800 26,400(6%) Champlin With Deltic and Whisenhunt Changes 42,700 (14%) 57,200 (11%) 46,800 (11%) 28,400 (15%) The following table summarizes the future levels of service for various intersections if one of both of the land -use and zoning changes are approved. The most significant reduction in levels of service occurs at the two (2) intersections of Chenal Parkway with Kanis Road. Levels of service at intersections range from 'A' being the best level of service and 'F' being the worst level of service. At level F, long delays can be expected at the intersection for some turn movements and through vehicle movements. Projected Level of Service at Various Intersections At Full Build -out in the Year 2016 Chenal Parkway at Wellington Hills Road Chenal Parkway at Kanis Road East) Chenal Parkway at Kanis Road No Land -Use With Whisenhunt Changes Changes (% increase) D D D I E C With Deltic and Whisenhunt Changes D E U Chenal Parkway I F F F at Systems Drive Chenal Parkway E E E at Rahling Road _ Rahling Road at C C C Champlin Drive Proposed Street Improvements: The current study also took into account the following new improvements to the existing street network that Whisenhunt has committed to build, including: ➢ Widening of Kirk Road from Chenal Parkway north to connect with Champlin Drive at Rahling Road to arterial standards.* ➢ Construction of a signalized intersection including dual left -turn lanes at Chenal Parkway and Kirk Road.* ➢ Widening and extension of Wellington Hills Road to arterial standards from the current terminus west to a new round -about intersection at Kirk Road and Systems Drive. ➢ Extension of Wellington Village Road to collector standards from the existing terminus west to the new Kirk Road extension. ➢ Completion of the missing portions of the third traffic lane in each direction of Chenal Parkway between the two (2) intersections of Kanis Road except for a small portion of the west -bound lanes near Kanis Road.* ➢ Widening of the west leg of Kanis Road along the developer's frontage to one half of an arterial street. ➢ Participation in the cost of a signalized intersection including dual left - turn lanes at Chenal Parkway and the west leg Kanis Road.* It should be noted that the Boundary Street Ordinance would have required several of these improvement but not others. Those in excess of Boundary Street Ordinance requirements are marked with an asterisk. A map illustrating the changes is included with this report. Improvements by Other Developers - The study assumes that a number of other improvements will be made by other developers within the ten (10) -year study period including: ➢ Construction of the Rahling Road extension from Chenal Parkway west and south to Kanis Road by Deltic. To date, plans have been submitted for a portion to extend Rahling Road to the La Grande Drive extension. ➢ Widening of the remainder of Rahling Road between Chenal Parkway and Taylor Loop Road to a four (4) -lane divided arterial standard by Deltic. This is in accordance with a much earlier agreement with Deltic that it would construct the additional lanes when traffic counts reach 12,000 vehicles per day as it will during the ten (10) -year study period. ➢ Construction of the Wellington Hills Road extension south to Kanis Road. Currently, the adjacent property owners have five (5) -year deferrals on boundary street obligations for this work. ➢ Widening of the northern portion of the west leg of Kanis Road when that property develops. ➢ Widening at the recently improved Cauley Development on Chenal Parkway near Kanis Road west. ➢ Construction of a signalized intersection at the Chenal Parkway and Wellington Hills Road intersection project that is currently under contract and is being funded by a combination of public dollars from the 2004 Bond Program and private dollars. 2 Pulaski County had previously agreed to signalize this intersection and Whisenhunt will pay for the incremental cost to upgrade and provide additional right-of-way necessary to incorporate the additional lanes. Staff Recommendation: The current study by Whisenhunt predicts traffic volumes that are consistent with, or somewhat higher, than historical trends and the 1988 Deltic Study. The current study also projects that 2016 traffic volumes will be far less than predicted by the full build -out study commissioned by the City. Overall, staff recommends that the study presented by the applicant is a fair representation of projected traffic growth in the corridor. The volumes predicted are consistent with historical trends and are volumes that can be handled with four (4) travel lanes in each direction and full development of turn lanes at intersections and major- driveways with six (6) lanes between Kanis Road (east) and Kanis Road (west). A largo traffic volume was predicted for the corridor in the past, and that trend continues. In addition, staff is of the opinion that the improvements proposed by Whisenhunt are reasonable and mitigate the effect of the increased traffic resulting from their proposed development. The proposed improvements exceed Boundary Street Ordinance obligations and serve to lessen delays resulting from increased traffic. It should be apparent; however, that additional improvements will be necessary in the future. Projections of ultimate traffic volumes from this and previous traffic studies show that the current four (4) -lane roadway and intersection configurations will eventually become overloaded whether or not all proposed land -use plan changes are approved. If additional information is needed, please advise. Attachments