HomeMy WebLinkAboutstaff report july meetingJuly 6, 2006
ITEM NO.: H FILE NO.: LU06-19-03
Name: Land Use Plan Amendment - Chenal Planning District
Location: Southwest corner of Rahling Road and Champlin Drive
Request- Mixed Use to Commercial
Source: Tim Daters, White-Daters
PROPOSAL/REQUEST:
Land Use Plan amendment in the Chenal Planning District from Mixed Use to
Commercial. Commercial represents a broad range of retail and wholesale sales
of products, personal and professional services, and general business activities.
A request to reclassify the property C-3 General Commercial is an accompanying
item.
EXISTING LAND USE AND ZONING:
The property is undeveloped currently zoned C-1 Neighborhood Commercial and
0-3 General Office and is 6.25 acres t in size. To the south, southeast, and
west is MF -18, Multifamily 18 units per acre and MF -6, Multifamily 6 units per
acre land. The area to the south is undeveloped. To the southeast and the west
are apartment complexes. Further to the south is the site of a proposed 50 acre
church development. Further to the east and south are single-family
subdivisions. To the north and northeast is C-1 Neighborhood Commercial, 0-2
Professional Office and 0-3 General Office. This land is vacant undeveloped.
There is a structure under construction on the 0-3 land to the northeast along
Rahling Road.
FUTURE LAND USE PLAN AND RECENT AMENDMENTS:
May 18, 2004, a change from Single Family to Office, south of Cantrell Road
between Chenonceau and Chevaux, a mile to the northwest of the site. This
change was made related to a Planned Office District reclassification to allow for
future redevelopment of the land.
January 20, 2004, a change from Office to Mixed Use south of Rahling Road
either side of Champlin Drive, for the application area. This change was made to
allow for future development of the land (no reclassification was included at the
time).
July 6, 2006
ITEM NO.: H Cont. FILE NO.: LU06-19-03
June 17, 2003, changes from Office, Multifamily and Single Family to Multifamily
and Low Density Residential south of Chanel Parkway around Rahling Road, a
half mile to the southwest. These changes were made to reflect new zoning in
the area for future development.
June 4, 2002, a change from Single Family to Suburban Office south of Cantrell
Road either side of Drew, a mile to the northwest of the site. This change was
made related to a Planned Office District reclassification to allow for future
redevelopment of the land.
January 2, 2002, a change from Single Family to Commercial, Suburban Office
and Open Space southeast of the Chenal-Northfield intersection over a mile to
the northwest of the site. This change was made related to a rezoning request
for the area.
The Plan shows the application area of Mixed Use. To the south, west and east
the Plan Shows Multifamily. Beyond this to the west is a large area at Rahling
and Chenal Parkway of Community Shopping and Commercial use. A large
area of Office is shown to the southwest and northwest. The southwest area is
mostly developed along Arkansas System Drive. To the northwest is
undeveloped Office along Chenal Drive. Further to the southeast, east and
northeast is Single Family.
MASTER STREET PLAN:
Rahling Road and Champlin Drive are shown as Arterials on the plan. An
Arterial functions to move traffic through and around the urban area or from
activity centers to the Arterial system. These roads are designed to be four or
more lanes and move large numbers of vehicles at high speed. They are not
intended to provide access to adjacent land.
BICYCLE PLAN.-
The
LAN:
The Master Street Plan, bicycle section, proposes a Class I bike route along
Rahling Road. A Class I route has a separate pavement for the sole use of
bicycles.
PARKS:
The Little Rock Parks and Recreation Master Plan indicates this site is close to
meeting the goal of being with 8 -blocks of an existing public or private park or
open space. Additional recreational or open space will be needed in the general
area to the north.
2
July 6, 2006
ITEM NO.: H (Cont.
HISTORIC DISTRICTS:
FILE NO.: LU06-19-03
There are no city recognized historic districts that would be affected by this
amendment.
CITY RECOGNIZED NEIGHBORHOOD ACTION PLAN:
The property under review is not located in an area covered by a City of Little
Rock recognized neighborhood action plan.
ANALYSIS:
The application area is partially cleared land. There is a small business center
under construction to the east along Rahling Road. Two large apartment
communities have been built near by. One is to the southeast the other is west
of the site. Most of the surrounding land remains vacant and available for
development. This is a part of the 'Chenal Valley' development area and is part
of the high growth area of Little Rock. Thus it is a developing part of the City.
Most of the large office area to the southwest has been developed.
Development in the immediate area has been slow, with two apartment
complexes, a church and now a small business center (office and retail). The
primary growth area of `Chenal Valley' has been to the west and northwest of
this site. To the east several other residential developments have been moving
to the west with new homes.
The `Chenal Master Plan' and the City's Land Use Plan call for an intense
commercial area at the Rahling Road-Chenal Parkway intersection. Most of this
land, after two decades, is yet to develop or have building plans under review for
construction. Only the southeast corner is partially developed with commercial
and small offices.
To the south and southeast is the site of a proposed 50 -acre church, which is on
this same agenda. This complex will be on the east side of Champlin Drive just
south of the application area. This will include some of the area south of the site
currently shown for Multifamily. It is expected that the church complex and street
connections will all be made within the next two years.
NEIGHBORHOOD COMMENTS:
Notices were sent to the following neighborhood associations: St Charles
Community Association. Staff has received no comments from area residents.
3
July 6, 2006
ITEM NO.: H (Cont.) FILE NO.: LU06-19-03
STAFF RECOMMENDATIONS:
Staff is continuing to review the area and proposals for the area of this action.
Additional information and recommendation are forthcoming.
PLANNING COMMISSION ACTION: (MAY 25, 2006)
Items K, L, M, 2 and 3 were combined for presentation by Staff. Walter Malone,
Planning Staff, reviewed this the Commission the Land Use Study begun along
Kanis Road from Chenal to Dennis Road. This study was begun at the request
of the Board of Directors as a result of a Land Use Plan change between Rock
Creek to Kanis Road from Multifamily to Commercial. After reviewing the Study
proposals, Mr. Malone reviewed each of the Land Use Plan requested changes
and the surrounding Land Use Plan. Staff is supported of the changes proposed
in items K, L and M. Staff does not support the changes requested in items 2
and 3. Staff could support a change from Office to Mixed Use for the area within
item 3.
Ms. James next made a staff presentation for the Planned Zoning District
applications, items N, O and P (see minutes of those items for presentation).
Mr. Moore, Planning Staff made the presentation on items J, 2.1 and 3.1 (see
minutes of those items for presentation). Mr. Ernie Peters, Peters and
Associates presented the traffic study information completed for both applicants.
In short the development would add 500 (Deltic) and 1000 (Wisenhunt) to the
PM peck. The improvements each would make would more than off set the
increased demands on the road network. This is not to say that other
intersection in the network would not need further improvements.
Commission Allen indicated he had been called away for another meeting and
thus the commission was going to have only 6 members for these items.
Commissioner Rahman expressed concerns about moving foreword since the
Traffic Study had just become available and he wished to have time for a more
complete review. (He indicated he might now not be able to support any of the
requests). Each applicant was asked if they wished to defer. After some
discussion Mr. Spivey and Mr. Daters for the Deltic applicants agreed to defer
items J, K, 2, 2.1, 3 and 3.1. By a vote of 6 for and 0 against the commission
voted to defer these items to July 6, 2006.
STAFF UPDATE:
There has been no further contact by the applicant on this issue. No new
information has been presented to Staff and the recommendation remains
unchanged.
12
Vicinity Map
PLAN AMENDMENT
N
Case: LU06-19-03
MX TO C
Location: CHAMPLIN AND RAHLING ROAD
Ward: 5
PD: 19 0 245490 980 Feet
CT: 42.10
TRS: T2NR14W36
Vicinity Map
AREA ZONING
N
Case: LU06-19-03
MX TO C
Location: CHAMPLIN AND RAHLING ROAD
Ward: 5
PD: 19 0 245490 980 Feet
CT: 42.10
TRS: T2NR14W36