HomeMy WebLinkAboutquoteSEARK Enterprises, LLC 10/29/17
10317 Lee Springs Road
Pine Bluff, AR 71603
870-550-9378
E: searkllc ggmail.com
TO: The MacArthur Museum of Arkansas Military History
Attn: Steve McAteer smcateerglittlerock.g_ov
RE: Storm windows
Mr. McAteer,
Please note the Proposal for the Allied Storm Windows to be installed at the
MacArthur Museum.
This Proposal has accounted for a modest increase in material cost that should cover a
typical material cost increase over the first two quarters of calendar year 2018. Additionally,
I have included a 15% surcharge to cover Architectural fees, etc.
I spoke with Tim Heiple (current project Architect) concerning the painting of the
windows. He told me that the painting of the existing windows will be performed with the
current construction project by Morris -Beck. For this reason, I have NOT included any
additional painting with the storm window installation proposal.
Please contact me with any questions.
James T. West
SEARK Enterprises
SEARK Enterprises, LLC 10/30/17
10317 Lee Springs Road
Pine Bluff, AR 71603
870-718-1357
870-550-9378
E: seark.11c(agmail.com
PROPOSAL
TO: The MacArthur Museum of Arkansas Military History
Attn: Mr. Stephan McAteer E: smcateerglittlerock.gov
RE: Historical Storm Windows
SEARK Enterprises proposes the following:
SEARK Enterprises shall install Historically Approved, Allied One Lite exterior
storm windows for the MacArthur Museum of Military History as follows:
The Windows shall be the Allied One Lite, Type A and Type C design, as
manufactured by Allied Window of Cincinnati, OR
The Color shall be Standard White. (Custom colors are available at an additional
cost.)
The Glass shall be clear annealed. The transoms, side lites and any other location
required by existing building codes, shall be clear tempered glass.
This Proposal includes the installation of all Allied storm windows, two (2)
approved replacement windows at the ends of the building in the basement area, surface
cleaning of the existing window exterior glass and frame prior to the installation, removal of
all waste and debris, total job complete.
*Workers compensation and general liability insurance are included with this Proposal.
*All taxes, fees and building permits are included with this Proposal.
Total cost of all labor and material stated above: $88,900.00
Please contact us by e-mail with any questions concerning this Proposal.
Thank You,
James T. West, President
SEARK Enterprises, LLC
Arkansas State Contractors License #0220580518