Loading...
HomeMy WebLinkAboutquoteSEARK Enterprises, LLC 10/29/17 10317 Lee Springs Road Pine Bluff, AR 71603 870-550-9378 E: searkllc ggmail.com TO: The MacArthur Museum of Arkansas Military History Attn: Steve McAteer smcateerglittlerock.g_ov RE: Storm windows Mr. McAteer, Please note the Proposal for the Allied Storm Windows to be installed at the MacArthur Museum. This Proposal has accounted for a modest increase in material cost that should cover a typical material cost increase over the first two quarters of calendar year 2018. Additionally, I have included a 15% surcharge to cover Architectural fees, etc. I spoke with Tim Heiple (current project Architect) concerning the painting of the windows. He told me that the painting of the existing windows will be performed with the current construction project by Morris -Beck. For this reason, I have NOT included any additional painting with the storm window installation proposal. Please contact me with any questions. James T. West SEARK Enterprises SEARK Enterprises, LLC 10/30/17 10317 Lee Springs Road Pine Bluff, AR 71603 870-718-1357 870-550-9378 E: seark.11c(agmail.com PROPOSAL TO: The MacArthur Museum of Arkansas Military History Attn: Mr. Stephan McAteer E: smcateerglittlerock.gov RE: Historical Storm Windows SEARK Enterprises proposes the following: SEARK Enterprises shall install Historically Approved, Allied One Lite exterior storm windows for the MacArthur Museum of Military History as follows: The Windows shall be the Allied One Lite, Type A and Type C design, as manufactured by Allied Window of Cincinnati, OR The Color shall be Standard White. (Custom colors are available at an additional cost.) The Glass shall be clear annealed. The transoms, side lites and any other location required by existing building codes, shall be clear tempered glass. This Proposal includes the installation of all Allied storm windows, two (2) approved replacement windows at the ends of the building in the basement area, surface cleaning of the existing window exterior glass and frame prior to the installation, removal of all waste and debris, total job complete. *Workers compensation and general liability insurance are included with this Proposal. *All taxes, fees and building permits are included with this Proposal. Total cost of all labor and material stated above: $88,900.00 Please contact us by e-mail with any questions concerning this Proposal. Thank You, James T. West, President SEARK Enterprises, LLC Arkansas State Contractors License #0220580518