Loading...
HomeMy WebLinkAbout2018-07-10 letter onePage 1 of 3 July 10, 2018 Mark and Elaine Hinson 17471 Oak Forest Drive Mabelvale, AR 72103 Dear Mr. and Mrs. Hinson, Your application HDC18-014 for Infill House, at 407 E Daisy Bates Drive will be heard before the Historic District Commission on August 13, 2018. The hearing will be held in the Board Room at City Hall at 500 West Markham on the second floor. The meeting will begin at 5:00 p.m. Your application will be item Two on the agenda. You or your agent must be present in order for the item to be heard. Please follow directions exactly when giving ten days’ notice to all property owners as stated in the application on page 3 instructions #4 and #5. On your application, you stated that your agents would be Brent Hopkins and Tim Hankins. If either of you two cannot be present at the August 13, 2018 hearing, you will need to complete the Authorization of Representation Statement at the end of the application packet and return that to me. That would allow them to make decisions for you in your absence at the commission meeting. If that is not the case, there is no need to fill out the form. You can ask them to come to the podium during the hearing ite m to clarify some aspect of the design if needed which would not require filling out the form. The application form states that “A description of materials for all exterior surfaces listed above shall be provided to Staff at time of filing. Web site addresses are appropriate but cut sheets of individual materials are preferred.” The following information will need to be submitted to Staff by July 23, 2018 to complete your filing. If you are not including any of the items below, please respond with “not applicable”. Foundation: List materials, finishes, and height. This appears to be covered with brick on the main house but not noted on the garage. Steps to house: Provide materials and finishes and provide sketch of handrails. Walls: Your drawings state brick and metal siding. Please state manufacturer, model number, and color of brick. Please state manufacturer, model number, and color of the metal siding, orientation, and finish. Also, state size, material, finish, and model number DEPARTMENT OF PLANNING AND DEVELOPMENT 723 West Markham Street Little Rock, Arkansas 72201-1334 Phone: (501) 371-4790 Fax:(501) 399-3435 www.littlerock.gov Page 2 of 3 of any trim boards around doors and windows. Include floor to ceiling height on all floors and porches. Windows: Specify manufacturer, model number, finish, and size for all windows. Doors: Specify brand, model number, finish, and size for all exterior doors. Lighting: Specify location, brand, model number, finish, and size for all exterior lighting either affixed to house, garage, or freestanding. If these are recessed can lights, please note. Gutters: Show locations of gutters on elevations with size and materials of guttering and downspouts. Mechanical Systems: State location of any exterior air conditioning/heating system units. State location of all utility meters: gas, electric, cable boxes, etc. Satellite Dishes: State location and details on any satellite dish. If not using a dish, please state so. Roof: Provide pitch of all roofs and depth of all eaves. Roofing: Provide a manufacturer, model number, finish, and size for all roofing materials. Chimney: Please specify brand, model number, finish, and size on the metal spark arrestor. Solar Collectors: Provide details on locations, size, material, and finish. Fencing on site: Provide details and locations on fencing, size, material, and finish. Site Plan: Provide site plan with dimension of setbacks on house, garage, and fencing if modified from original proposal. Walks/Sidewalks/Drives: Provide information on city sidewalk repair or replacement. Provide information on any private sidewalks and vehicular drive/parking pads with size, materials, and finish. Landscaping: Provide details on any wall, planting bed border, or any other fixed inert building material used in permanent landscaping structures. Elevations: Submit dimensioned elevations for height and width of all elevations. Garage: Provide all information listed above for garage. The above list was generated from Sections III - VII in the MacArthur Park Historic District Guidelines for Rehabilitation and New Construction December 2016. Failure to provide all information requested above in a complete manner before 5:00 pm July 23, 2018, will result in a Staff recommendation of Deferral on this application. Page 3 of 3 There is an issue with the separation between the house and the studio- garage which may affect placement of the garage and/or the overhang of the garage. This needs to be addressed. The garage- studio space shall have a six foot separation between it and the house including posts and overhangs. That distance is measured from twelve inches up on both structures. The steps and porch to the house count as part of the house as well as the porch and post count on the studio- garage. If you slide the garage to the east, you will still need to consider the overhang of the studio- garage for it to have a six feet separation from the porch. Staff can sign off on the front yard setback as long as there are no other variances sought. Staff can sign off on a covered walkway as long as there is proper separation between structures. Please call me if there are any questions on this. Sincerely, Brian Minyard Urban Designer