HomeMy WebLinkAboutcover letterTHE LIGHTHOUSE CENTER INC
October 20, 2000
Ms. Ann Guthier
Little Rock Historic District Commission
500 West Markham Street #120W
Little Rock, AR 72201
Ms. Guthier
THE LIGHTHOusE CENTER, INC.
"A Beacon of Light In The World"
Pastors: Clarence & Charlesetta Harville
Phone: (501) 562-3910 -Fax (507 6204 Butler Road
562-4208 Little Rock, AR 72209
Thank you for your warn visit and your assistance on our
Proj
inform you of the present condition of the house our church Thect. This letter is to
Inc, owns at 1414 Park Lane which is located in the Mac Arthu hthouse Center
District. Park Historic
As you are aware, The Public Safety Department informed us that the state
of the
facility is unsafe. The Lighthouse Center will do ordinary maintenance and
to the exterior to bring it to code. It is our understanding that a COA is not
required in order for us to proceed,
We realize that your commission's next meeting is November 2, 2000. However, we
have a deadline with the city to bring the house up to the code by October 23, 2000.
It is currently on the U.V. list.
Mr. Wally Caradine who is associated with Woods & Caradine Architectural Group
.
located in Little Rock is currently working with us on proposed projects to be
Caradine is a resident of the district and
located in the district. As you know, Mr
familiar with all preservation requirements. Again, thank you for your time and
You may address any correspondence to me at the address below.
Scla
�' 2
Pastor Clarence Harville
6402 BUTLER RD- LITTLE ROCK, ARKANSAS • 72209
PHONE: 501-562-3910• FAX: 501-562-4208
RENOVATION PROJECT AT
1.414 PARK LANE
LITTLE ROCK, ARKANSAS
The Light House, Inc. is proposing to renovate the residential house located at 1414 Park
Lane, Little Rock, Arkansas. The scope of work is as follows.
1. Reconstruct front porch which has deteriorated to the point where it can not be
repaired.
2. Remove all deteriorated materials from the structure, which include materials from the
walis,(interior and exterior), materials from the roof and ceiling, subfloor, floor seals, floor
joists and Sofia and fiscia.
3. Remove all shingles from the structure and replace them with three tabs fiber glass
shingles.
4. Remove all plaster materials from the interior walls and ceiling and replace it will sheet
rock.
5. Replace the electrical, plumbing and mechanical systems with new systems meeting the
City of Little Rock and the Mac Auther Historical required specifications.
6. To replace exterior materials with materials detailing the same appearance as the
original materials.
7. Construct steps at the front entry of house,
8. Insulate walls with R-13 and ceiling with R-30 or better
9. Paint exterior and interior of structure.
10. To refinish the existing hardwood floor and use them wherever possible