Loading...
HomeMy WebLinkAboutpresentation on august 13AAC Goals 1.Connect and Open to MacArthur Park 2.Create a Welcoming Identity from 9th Street and the Park 3.Reveal the Art Gallery, Art School, and Children’s Theatre 4.Significantly enhance and clarify the visitor experience 5.Create public social spaces –The Cultural Living Room 6. Optimize systems/operations and art handling capacity CHALLENGES Challenge: Closed Off/ Disparate Architectural Styles City Approach Challenge: Closed Off/ Disparate Architectural StylesPark Approach Challenge: Museum surrounded by asphalt SOLUTIONS PROPOSED SITE DESIGN EXISTING SITE CHALLENGE: MUSEUM SURROUNDED BY ASPHALT CITY ENTRY / NORTH PLAZA Remove Labels Crescent Drive -Existing Museum of Fine Arts 2019 NORTH PLAZA MATERIALS CUT STONE SEATS LIMESTONE PAVING SANDSTONE GRAVEL PARK ENTRY / SOUTH PLAZA Park Entry -Existing Drop-off Oak Savanna Cypress Grove Event Lawn Rain GardenPark Terrace SOUTH PLAZA PETALS CYPRESS LOWLANDS EVENT LAWN PARK LAWN OAK SAVANNA ENTRY PLAZA PETAL SEATWALLS PARKING FOREST DRIVE AISLE BANDING: EXPOSED AGG. CONCRETE DRIVE AISLE AND PARKING STALLS: CHIPSEAL PARKING STRIPES: CHOCTAW SANDSTONE WHEEL STOP CURB: PRECAST CONCRETE PARKING FOREST MATERIALSPARKING FOREST PARKING FOREST MATERIALS Exposed Aggregate Concrete Concrete Curb + Wheelstop Sandstone Cobble Parking Strip Chipseal Paving Chipseal Paving Quercus Species PARKING GROVE MATERIALS PARKING FOREST VIEW PARKING FOREST VIEW SCALE & PROPORTION SOUTH ELEVATION -EXISTING SOUTH ELEVATION –ADDITION SOUTH ELEVATION –EXISTING WITH ADDITION OVERLAY OPENINGS IN BRICK WALL; FINISHED CONCRETE WITH STAIN SEALER, BEYOND STEEL FRAMED CURTAINWALL WITH FRITTED, LOW-E GLASS CAST-IN-PLACE STRUCTURAL CONCRETE WITH FORMED FINISH ROT-RESISTANT EXTERIOR GRADE WOOD LUMBER, DIMENSIONAL STAINED BRICK EXISTING CONCRETE WALLS AT THEATER STAGE -PAINTED WHITE MEMBRANE ROOF STAINED BRICK 0 10 20 40 WEST ELEVATION -EXISTING WEST ELEVATION –ADDITION WEST ELEVATION –EXISTING WITH ADDITION OVERLAY STAINED BRICK FINISHED CONCRETE WITH STAIN SEALER TO MATCH ADJACENT BRICK STAIN RIBBED METAL SCREEN ENCLOSURE TO CONCEAL MECHANICAL EQUIPMENT STUCCO, PAINTED WHITE STAINED BRICK ALUMINUM STOREFRONT SYSTEM WITH LOW-E GLASS ROT-RESISTANT EXTERIOR GRADE WOOD LUMBER, DIMENSIONAL AT OVERHANG SOFFIT STEEL FRAMED CURTAINWALL WITH FRITTED, LOW-E GLASS EXISTING CONCRETE WALLS AT THEATER STAGE -PAINTED WHITE MEMBRANE ROOF 0 10 20 40 ARCHITECTURAL LOUVERS FOR MECHANICAL EQUIPMENT NORTH ELEVATION -EXISTING NORTH ELEVATION –ADDITION NORTH ELEVATION –EXISTING WITH ADDITION OVERLAY STAINED BRICKSTAINED BRICK ALUMINUM STOREFRONT SYSTEM WITH LOW-E GLASS STEEL FRAMED CURTAINWALL WITH FRITTED, LOW-E GLASS CAST-IN-PLACE STRUCTURAL CONCRETE WITH FORMED FINISH ROT-RESISTANT EXTERIOR GRADE WOOD LUMBER, DIMENSIONAL STAINED BRICK 0 10 20 40 EAST ELEVATION -EXISTING EAST ELEVATION –ADDITION EAST ELEVATION –EXISTING WITH ADDITION OVERLAY STAINED BRICKSTAINED BRICK ALUMINUM STOREFRONT SYSTEM WITH LOW-E GLASS STEEL FRAMED CURTAINWALL WITH FRITTED, LOW-E GLASS CAST-IN-PLACE STRUCTURAL CONCRETE WITH FORMED FINISHROT-RESISTANT EXTERIOR GRADE WOOD LUMBER, DIMENSIONAL AT OVERHANG SOFFIT STAINED BRICK EXISTING CONCRETE WALLS AT THEATER STAGE -PAINTED STEEL FRAMED CURTAINWALL WITH FRITTED, LOW-E GLASS ROT-RESISTANT EXTERIOR GRADE WOOD LUMBER, DIMENSIONAL AT OVERHANG SOFFIT 0 10 20 40 UP EXPANDED DOUBLE HEIGHT LOBBY SPACE FROM BELOW AREA OF NORTH DOUBLE HEIGHT SPACE REMOVAL (2800 SF) PUBLIC ENTRY 2ND FLR SERVICE FACILITIES (2000 SF) 2ND FLR CULTURAL LIVING ROOM (5600 SF) AREA OF FOOTPRINT REMOVAL BELOW AREA OF WEST DOUBLE HEIGHT SPACE REMOVAL (1800 SF) 99' - 6"8' - 3"EXISTING STAGE FLY TOWER AREA OF FOOTPRINT REMOVAL BELOW 46' - 0"41' - 11"52' - 7"111' - 9"9' - 4"6' - 3"77' - 5"26' - 11"26' - 3"87' - 2" 105' - 11" 95' - 1" 2 1 ' - 0 "13' - 8"8FT TALL BRICK VENEER DUMPSTER ENCLOSURE AREA OF SOUTH EXPANSION (8500 SF) AREA OF WEST EXPANSION (2500 SF) AREA OF WEST REMOVAL (1125 SF) AREA OF WEST REMOVAL (2080 SF) AREA OF NORTH REMOVAL (7650 SF) ART LOADING DOCK AREA OF SCREENED MECHANICAL YARD (2100 SF)36' - 2"66' - 6" STAFF ENTRY PUBLIC ENTRY PUBLIC ENTRY EXISTING EAST DOCK AREAS OF EXPANSION / REMOVAL LOWER/UPPER LEVEL 1 –PLAN LEVEL 2 –PLAN -AREA OF BUILDING REMOVAL -AREA OF BUILDING EXPANSION -AREA OF SCREENED MECHANICAL YARD