HomeMy WebLinkAboutCOA application forms with signatures final (2)July 3, 2019______________________501 East 9th Street, Little Rock, AR 72202_________________________________________________________________________Arkansas Arts Center, 501 East 9th Street, Little Rock Arkansas Contact: Laine Harber, Interim Director,CFO 501 396 0301 lharber@arkansasartscenter.org___________________________________________________________________________ Mark Webre, Deputy Director of Operations , Little Rock Parks and Recreation, 500 West Markham, Room 108, Little Rock , AR 72201 501 371 6851 mwebre@littlerock.gov__________________________________________________________________Architect: Studio Gang Architects, 1520 W Division St, Chicago, IL 60642 Contact: Angela Peckham 872 315 2262 apeckham@studiogang.com________________________Contractor: Nabholz Pepper Doyne ConstructionAugust 12, 2019LOTS A THROUGH F, E.O. BAGLEY'S SUBDIVISION OF LOTS SUBDIVISION, LITTLE ROCK, PULASKI COUNTY, ARKANSAS. andLOT 5 , BLOCK 154, ORIGINAL CITY OF LITTLE ROCK, PULASKI COUNTY, ARKANSAS. and LOT 6, AND A 60' STREET SOUTH OF AND ADJACENT TO BLOCK 154, ORIGINAL CITY OFLITTLE ROCK, PULASKI COUNTY, ARKANSAS. and LOTS 1 THROUGH 3, BLOCK 155, ORIGINAL CITY OF LITTLE ROCK, PULASKI COUNTRY , ARKANSAS and LOTS 1 THROUGH 6,BLOCK 153, ORIGINAL CITY OF LITTLE ROCK, PULASKI COUNTY, ARKANSAS and THAT PART OF THE NW 1/4 OF SECTION 11, TOWNSHIP 1 NORTH, RANGE 11 WEST, LYING EAST OFTHE QUAPAW LINE, WEST OF MCALMONT STREET, AND NORTH OF EAST 13TH STREET, IN THE CITY OF LITTLE ROCK, PULASKI COUNTY, ARKANSAS and THAT PART OF THE SW1/2 OF SECTION 2, TOWNSHIP 1 NORTH, RANGE 12 WEST, LYING SOUTH OF EAST 9TH STREET, WEST OF MCALMONT STREET, AND EAST OF THE QUAPAW LINE, IN THE CITY OFLITTLE ROCK, PULASKI COUNTY, ARKANSAS$ 70,000,000 estimated constructionThe proposed Project is a renovation and 28,000 SF addition to the existing Arkansas Arts Center located within MacArthur Park. The Project includes significant re-work of theprimary public entries and re-organization of existing program components. The 28,000 SF of growth is accommodated mostly through the expansion of the second floor at thenorthwest corner of the site into existing space that is currently double height gallery and lobby. The proposed site modifications lessen the hardscape impact to the park by reducingoverall paving surface, incorporating eco-friendly storm management strategies, adding over 250 new trees to the park through an extensive Parking Forest, and creating new civiclandscape environments that connect the Arts Center to the surrounding Park and Community. At the new north entry plaza, the original 1937 Historical Facade will be uncovered andrestored as the primary public entry to the Center. HDC-19-011Associate Architect: PolkStanleyWilcox Architects, 2222 Cottondale Lane, Suite 100, AR 72202 Contact: Wendell Kinzler, 501 367 2246 wkinzler@polkstanleywilcox.comAssociate Architect: PolkStanleyWilcox Architects, 2222 Cottondale Lane, Suite 100, AR 72202 Contact: Wendell Kinzler, 501 367 2246 wkinzler@polkstanleywilcox.com